Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 8 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARKADE AURA is a Residential / Group Housing project by ARKADE DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047460 on 2 Nov 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 1 complaint is on record with the regulator.
At a glance
Project
- NameARKADE AURA
- TypeResidential / Group Housing
- Location
- Poddar Road & Beasant Road
- Santacruz West
- Andheri
- Mumbai Suburban
- 400054
- Pincode400054
- RERA no.P51800047460
- ReraGenie IDRG-MH-50876
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Nov 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings4 building records
- Documents filed125 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 16 | 0 | 0 | 0 | 0 |
| WING B | NA | 16 | 0 | 0 | 0 | 0 |
| WING C | NA | 16 | 0 | 0 | 0 | 0 |
| WING D | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 19 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 97%.
WING A71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 66% |
WING B63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 27% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 58% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 52% |
WING C65%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 29% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 52% |
WING D72%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 84% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 78% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 62% |
Progress on shared amenities18
As on 19 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 75% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Fitness Centre Society Office | Yes | 40% |
| Car Parking System | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VIVEK CO OP HOUSING SOCIETY LIMITED | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kalakruti Architects & Planners |
| Engineer | Jignesh Mohan Patel |
| Chartered Accountant | Mittal & Associates |
| Chartered Accountant | Santosh B Morge & Co |
| Chartered Accountant | Amit T Jain & Co. |
| Partner | Role in project |
|---|---|
| ARKADE DEVELOPERS PRIVATE LIMITED | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504293 | PREMJI ANANDJI RAMBHIA | ARKADE DEVELOPERS PRIVATE LIMITED | 04/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Jan 2025
Documents filed125
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 Aura Mar 25.pdf | 19 Dec 2025 |
| Disclosure of sold/ booked inventoryFile: Aura Inventory declaration dec 24.pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Aura Inventory declaration dec 24.pdf | 14 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate_Arkade Aura.pdf | 3 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2450668_OC_signed.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Aura sep 24.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aura Sep 24-Both sign_compressed.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aura form 3 Sep 24-s_compressed.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aura Sep 24.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Arkade Aura - Form 5-FY 24.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aura Sep 2024.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aura Jun 24 R_compressed.pdf | 6 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aura form-3 Jun 24_compressed.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aura_Upto June 2024.pdf | 23 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventories Aura-Jun 24 Final.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aura form-3 Jun 24_compressed.pdf | 23 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aura Jun 24.pdf | 13 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold UnSold March 24 Arkade Aura_compressed.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Untitled_20240424_103246_aura_mar 24_compressed.pdf | 24 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Arkade Aura Form 2 March 2024.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aura_ March 2024.pdf | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Arkade Aura March 24.pdf | 10 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Arkade Aura March 24.pdf | 10 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2406935_FurtherCC_signed.pdf | 16 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Aura Dec 23-1.pdf | 6 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Arkade Aura FY 22-23.pdf | 2 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arkade Aura Dec 23.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arkade Aura Dec 23.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23 Aura.pdf | 22 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Arkade Aura - Mar 23.pdf | 6 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 - Engg Certificate - Arkade Aura Sep 23_compressed.pdf | 3 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Arkade Aura - Declaration of Sold Unsold Units - Sep 23_compressed.pdf | 2 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arkade Aura - Form 3 Sep 23 - Signed_compressed.pdf | 2 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arkade Aura_Sep 23.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 23 Arkade Aura.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 23 Arkade Aura.pdf | 9 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 Arkade Aura March 23.pdf | 16 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration June 23 - Arkade Aura.pdf | 16 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Upload.pdf | 29 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arkade Aura upload.pdf | 28 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 23 Aura.pdf | 10 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Upload.pdf | 30 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arkade Aura 31032023.pdf | 17 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arkade Aura.pdf | 9 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arkade Aura Dec 2022_compressed_11zon.pdf | 19 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arkade Aura.pdf | 16 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arkade Aura.pdf | 16 Jan 2023 |
| Layout approvalFile: Concession Page 1.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 2.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 3.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 4.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 5.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 6.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 7.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 8.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 9.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 10.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 11.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 12.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 13.pdf | 22 Oct 2022 |
| Layout approvalFile: Concession Page 14.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 1.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 2.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 3.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 4.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 5.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 6.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 7.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 8.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 9.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 10.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 11.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 12.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 13.pdf | 22 Oct 2022 |
| Building plan approvalFile: IOD Page 14.pdf | 22 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance Declaration.pdf | 22 Oct 2022 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance Declaration.pdf | 22 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Concession Page 1.pdf | 22 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Concession Page 2.pdf | 22 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Concession Page 3.pdf | 22 Oct 2022 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Arkade Earth - Carnation | Arkade Earth Kanjurmarg East Mumbai 63 | 86 | Completed | Dec 2023 | Apr 2021 |
| Arkade Earth - Aspen | Arkade Earth Kanjurmarg East Mumbai 63 | 86 | Completed | Dec 2023 | Apr 2021 |
| Arkade Earth - Bluebell | Arkade Earth Kanjurmarg East Mumbai 63 | 86 | Completed | Dec 2023 | Apr 2021 |
| Arkade Earth - Hazel | Arkade Earth Kanjurmarg East Mumbai 63 | 90 | Completed | Dec 2022 | Apr 2022 |
| Arkade Earth - Gardenia | Arkade Earth Kanjurmarg East Mumbai 63 | 86 | Completed | Dec 2022 | Feb 2020 |
| Arkade Earth - Fern | Arkade Earth Kanjurmarg East Mumbai 63 | 86 | Completed | Dec 2022 | Feb 2020 |
| Arkade Earth - Ebony | Arkade Earth Kanjurmarg East Mumbai 63 | 86 | Completed | Dec 2022 | Feb 2020 |
| Arkade Earth - Daffodil | Arkade Earth Kanjurmarg East Mumbai 63 | 86 | Completed | Dec 2022 | Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations, which the RERA portal never shows together
- All 125 filed documents as one ZIP, foldered, with a manifest
Keep ARKADE AURA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Santacruz West6,700+ in Mumbai Suburban
AVIARA
BALUWALA BUILDERS
Ruparel Panache
Ruparel Infra & Realty Pvt Ltd
Vascon Orchids
Vascon Engineers Ltd
COMMERZ 54
SHREE VINAYAK REALITY PRIVATE LIMITED
Vascon Onyx Residences
Vascon Engineers Ltd
REDEVELOPMENT OF SHINING STAR CHSL
PRANAV CONSTRUCTIONS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: ARKADE DEVELOPERS PRIVATE LIMITED
Arkade Developers Private Limited has 13 registrations on MahaRERA, including ARKADE EARTH-ASPEN and ARKADE EARTH- BLUEBELL. Its filings disclose 27 earlier MahaRERA projects: declares 23 of 27 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if ARKADE AURA is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARKADE AURA?
The registered promoter entity is ARKADE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARKADE AURA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ARKADE AURA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ARKADE AURA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARKADE AURA?
The professionals named in the filing: Architect: Kalakruti Architects & Planners; Engineer: Jignesh Mohan Patel; Chartered Accountant: Mittal & Associates; Chartered Accountant: Santosh B Morge & Co; Chartered Accountant: Amit T Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARKADE AURA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback