ANANDAM WORLD CENTRE
By GOLDBRICKS INFRASTRUCTURE PVT LTD
RG-MH-04039 · RERA P50500033711 · Last updated on MahaRERA portal: 17 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANANDAM WORLD CENTRE is a Commercial project by GOLDBRICKS INFRASTRUCTURE PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500033711 on 8 Mar 2022. Possession is promised by 30 Jun 2027. 247 of the 397 units on this registration are recorded sold or booked, and 29 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameANANDAM WORLD CENTRE
- TypeCommercial
- Location
- MODEL MILL COMPOUND
- UMRED ROAD
- GANESHPETH
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440018
- Pincode440018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500033711
- ReraGenie IDRG-MH-04039
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Mar 2022
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings3 building records
- Documents filed151 files
Current status
Figures as on 17 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANANDAM SHOPPING CENTRE | NA | 5 | 5 | 0 | 80 | 80 |
| ANANDAM BUSINESS CENTRE | NA | 14 | 14 | 0 | 316 | 316 |
| SUPER MARKET | NA | 6 | 5 | 0 | 1 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 17 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
ANANDAM SHOPPING CENTRE82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ANANDAM BUSINESS CENTRE91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SUPER MARKET91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| ANANDAM SHOPPING CENTRE | 1 | 1 |
| ANANDAM BUSINESS CENTRE | 1 | 1 |
| SUPER MARKET | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ANANDAM SHOPPING CENTRE | NA | Rs 82.06 cr | Rs 71.74 cr |
| ANANDAM BUSINESS CENTRE | NA | Rs 82.06 cr | Rs 71.74 cr |
| SUPER MARKET | NA | Rs 82.06 cr | Rs 71.74 cr |
| - | NA | Rs 2.38 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJESH JAISWAL |
| Engineer | AVINASH UKEY UKEY |
| Chartered Accountant | ANKIT TALREJA GAD & ASSOCIATES |
| Chartered Accountant | A K TOLANI & COM |
| Chartered Accountant | Laabhesh Jagdish Savadia |
| Chartered Accountant | Gurvinder Singh Chhabra |
| Partner | Role in project |
|---|---|
| GOLDBRICKS INFRASTRUCTURE PVT LTD | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500053 | Mrinal Katkar | GOLDBRICKS INFRASTRUCTURE PVT LTD | 16/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed151
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 31-12-2025.pdf | 17 Sep 2026 |
| Withdrawal Update Form 1File: FORM-1 31-03-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 1File: FORM-1 31-03-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 1File: FORM-1 30-06-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 31-12-2025.pdf | 17 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 31-03-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 31-03-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 30-06-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 31-12-2025.pdf | 17 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 31-03-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 31-03-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 30-6-2026.pdf | 17 Sep 2026 |
| Withdrawal Update Form 1File: Form-1 Gold brick dec25.pdf | 5 Sep 2026 |
| Withdrawal Update Form 1File: Form-1 Gold brick Jan26.pdf | 5 Sep 2026 |
| Withdrawal Update Form 1File: Form-1 Gold brick Jun26.pdf | 5 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 Goldbrick dec25.pdf | 5 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 Goldbrick jan26.pdf | 5 Sep 2026 |
| Withdrawal Update Form 2File: Form-2 Goldbrick jun26.pdf | 5 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 goldbrick 25.pdf | 5 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 goldbrick jan26.pdf | 5 Sep 2026 |
| Withdrawal Update Form 3File: Form-3 goldbrick jun26.pdf | 5 Sep 2026 |
| Form 5 (FY 2025-2026)File: Form 05.pdf | 22 Aug 2026 |
| Form 1File: Form 1 Anandam.pdf | 21 Aug 2026 |
| Form 2File: Form 2 Anandam.pdf | 21 Aug 2026 |
| Form 3File: Form 3 Anandam_compressed.pdf | 21 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Anandam.pdf | 21 Aug 2026 |
| Form 1File: Form 1 Anandam.pdf | 21 Aug 2026 |
| Form 2File: Form 2 Anandam.pdf | 21 Aug 2026 |
| Form 3File: Form 3 Anandam_compressed.pdf | 21 Aug 2026 |
| OthersFile: OC G14 AWC office.pdf | 21 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Anandam.pdf | 21 Aug 2026 |
| Form 1File: Form 1 Anandam.pdf | 21 Aug 2026 |
| Form 2File: Form 2 Anandam.pdf | 21 Aug 2026 |
| Form 3File: Form 3 Anandam_compressed.pdf | 21 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold and Booked Inventory Anandam.pdf | 21 Aug 2026 |
| OthersFile: OC G14 AWC office.pdf | 21 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Anandam.pdf | 21 Aug 2026 |
| Form 1File: Form 1 AWC 30092025.pdf | 1 Nov 2025 |
| Form 2File: Form 2 AWC 30092025.pdf | 1 Nov 2025 |
| Form 3File: Form 3 AWC 30092025.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold AWC 30092025.pdf | 1 Nov 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 AWC 30092025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 AWC 30092025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 AWC 30092025.pdf | 18 Oct 2025 |
| Form 1File: Form1 AWC March-2025.PDF | 22 Jul 2025 |
| Form 2File: Form2 AWC March-2025.PDF | 22 Jul 2025 |
| Form 3File: Form 3 AWC.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold AWC March-25.pdf | 22 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Awc.PDF | 22 Jul 2025 |
| OthersFile: Declaration Awc.PDF | 22 Jul 2025 |
| Form 1File: Form1 AWC Dec-2024.PDF | 22 Jul 2025 |
| Form 2File: Form2 AWC Dec-2024.PDF | 22 Jul 2025 |
| Form 3File: Form 3 AWC Dec-2024.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold AWC Dec-2024.PDF | 22 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Awc.PDF | 22 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AWC.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AWC.pdf | 21 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 AWC.PDF | 2 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 AWC.PDF | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AWC 311224.PDF | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsod Dec24.PDF | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AWC 300924.PDF | 30 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AWC 300624_compressed.pdf | 11 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AWC 300924_compressed.pdf | 11 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 3092024.PDF | 5 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 3092024.PDF | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 10 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold AWC.PDF | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 RHS.PDF | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 AWC.PDF | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AWC 310324_compressed.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AWC.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AWC.PDF | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold March-2024_compressed.pdf | 15 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY202223 AWC.pdf | 11 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AWC form 3 311223_compressed.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept-2023_compressed.pdf | 9 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 AWC.pdf | 19 Oct 2023 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| ANANDAM WORLD CITY-TOWER G AND NP50500045835 | GANESHPETH, Nagpur | - | Jun 2022 | Ongoing | Mar 2030 | Not due yet |
| ANANDAM WORLD CITY VILLAP50500009151 | GANESHPETH, Nagpur | - | Aug 2017 | Ongoing | Dec 2026 | Not due yet |
| RHSP50500047576 | GANESHPETH, Nagpur | 44 | Nov 2022 | Ongoing | Mar 2026Registered original: Mar 2025 | Not delivered |
| ANANDAM WORLD CITY PART OF TOWER A B AND DP50500004568 | Nagpur (M Corp.), Nagpur | - | Aug 2017 | Completed | Aug 2024 | Dec 2019 |
| LHSP50500025598 | GANESHPETH, Nagpur | - | Jul 2020 | Completed | Jun 2023 | Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 151 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANANDAM WORLD CENTRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GANESHPETH2,800+ in Nagpur
Filed coordinates, straight-line distance. 100 registered projects within 2 km.
SUVARNABHOOMI
TIRUPATI DEVELOPERS
81 RSG
R SANDESH LLP
KUKREJA ANANDAM WORLD CITY TOWER H AND M
GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED
THE RISE
R SANDESH LLP
EMPRESS ROYAL A, B, C, D
BEACON REALCON PVT LTD
EMPRESS ROYAL EFGH
VIGNAHARTA CORRUGATORS PVT LTD
See every Nagpur project, with the district possession charts
Builder: GOLDBRICKS INFRASTRUCTURE PVT LTD
GOLDBRICKS INFRASTRUCTURE PVT LTD has 6 registrations on MahaRERA, including ANANDAM WORLD CITY PART OF TOWER A B AND D and ANANDAM WORLD CITY VILLA. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if ANANDAM WORLD CENTRE is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANANDAM WORLD CENTRE?
The registered promoter entity is GOLDBRICKS INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANANDAM WORLD CENTRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ANANDAM WORLD CENTRE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ANANDAM WORLD CENTRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANANDAM WORLD CENTRE?
The professionals named in the filing: Architect: RAJESH JAISWAL; Engineer: AVINASH UKEY UKEY; Chartered Accountant: ANKIT TALREJA GAD & ASSOCIATES; Chartered Accountant: A K TOLANI & COM; Chartered Accountant: Laabhesh Jagdish Savadia; Chartered Accountant: Gurvinder Singh Chhabra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANANDAM WORLD CENTRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback