Home / Browse projects / Nagpur, Maharashtra / EMPRESS ROYAL EFGH
EMPRESS ROYAL EFGH
By VIGNAHARTA CORRUGATORS PVT LTD
RG-MH-00491 · RERA P50500009773 · Last updated on MahaRERA portal: 28 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 25 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EMPRESS ROYAL EFGH is a Residential / Group Housing project by VIGNAHARTA CORRUGATORS PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500009773 on 22 Aug 2017. Possession is promised by 30 Jan 2028. The completion date has moved by 25 months from the original filing. 160 of the 160 units on this registration are recorded sold or booked, and 40 of 44 construction stages are filed complete.
At a glance
Project
- NameEMPRESS ROYAL EFGH
- TypeResidential / Group Housing
- Location
- Betul
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440018
- Pincode440018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500009773
- ReraGenie IDRG-MH-00491
Builder
- NameVIGNAHARTA CORRUGATORS PVT LTD
- Entity typeCompany
- Managing DirectorJAIMAL SINGH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion30 Jan 2028
- Revised completionRevised to 30 Jan 2028 (originally 30 Dec 2025)
- Buildings4 building records
- Documents filed52 files
Current status
Figures as on 28 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EMPRESS ROYAL E | NA | 12 | 10 | 40 | 0 | 40 |
| EMPRESS ROYAL F | NA | 12 | 10 | 40 | 0 | 40 |
| EMPRESS ROYAL G | NA | 12 | 10 | 40 | 0 | 40 |
| EMPRESS ROYAL H | NA | 12 | 10 | 40 | 0 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 28 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 95%.
EMPRESS ROYAL E100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
EMPRESS ROYAL F100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
EMPRESS ROYAL G100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
EMPRESS ROYAL H100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 28 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed200
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| EMPRESS ROYAL E | 40 | 10 | 50 |
| EMPRESS ROYAL F | 40 | 10 | 50 |
| EMPRESS ROYAL G | 40 | 10 | 50 |
| EMPRESS ROYAL H | 40 | 10 | 50 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| EMPRESS ROYAL E | NA | Rs 13.00 cr | Rs 13.00 cr |
| EMPRESS ROYAL F | NA | Rs 13.00 cr | Rs 13.00 cr |
| EMPRESS ROYAL G | NA | Rs 13.00 cr | Rs 13.00 cr |
| EMPRESS ROYAL H | NA | Rs 13.00 cr | Rs 13.00 cr |
| - | NA | Rs 6.00 cr | Rs 6.00 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SURESH MISTRY |
| Architect | SSBEHLIM ASSOCIATES |
| Engineer | sandeep laxman chougale |
| Engineer | PRAVIN CIVILSITEENGINER DONGRE |
| Chartered Accountant | Rishi Sekhari |
| Chartered Accountant | SURBHI BOTHRA |
| Partner | Role in project |
|---|---|
| VIGNAHARTA CORRUGATORS PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter"In this project, the flats have only been registered. However, since some internal work is still pending, the project has not been fully completed and the Occupancy Certificate (OC) has not yet been received. Therefore, an extension is required to complete the remaining work and obtain the OC."
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jan 2028
Documents filed52
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: VIGNAHARTA - FORM2A FOR CORRECTION.pdf | 28 Sep 2026 |
| Withdrawal Update Form 1File: Vignaharta_form1 - MAR26.pdf | 23 Sep 2026 |
| Withdrawal Update Form 1File: VIGHNHARTA FORM 1.pdf | 23 Sep 2026 |
| Withdrawal Update Form 1File: VIGHNHARTA FORM 1.pdf | 23 Sep 2026 |
| Withdrawal Update Form 2File: vignaharta_ENG CERTIFICATE.pdf | 23 Sep 2026 |
| Withdrawal Update Form 2File: VIGHNHARTA FORM 2.pdf | 23 Sep 2026 |
| Withdrawal Update Form 2File: VIGHNHARTA FORM 2.pdf | 23 Sep 2026 |
| Withdrawal Update Form 3File: vignaharta_FORM-3 _MAR26.pdf | 23 Sep 2026 |
| Withdrawal Update Form 3File: vignaharta_FORM-3 _MAR26.pdf | 23 Sep 2026 |
| Withdrawal Update Form 3File: VIGHNHARTA FORM 3.pdf | 23 Sep 2026 |
| Withdrawal Update Form 1File: vignaharta s s.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: vignaharta_2026021108145800.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: Vignaharta Rera.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: VIGNAHARTA FORM 1.pdf | 17 Nov 2025 |
| Withdrawal Update Form 1File: VIGNAHARTA FORM 1.pdf | 17 Nov 2025 |
| Withdrawal Update Form 2File: VIGNAHARTA ENG CERTIFICATE - SEP25.pdf | 17 Nov 2025 |
| Withdrawal Update Form 2File: VIGNAHARTA ENG CERTIFICATE - SEP25.pdf | 17 Nov 2025 |
| Withdrawal Update Form 3File: VIGNAHARTA FORM3 _SEP25.pdf | 17 Nov 2025 |
| Withdrawal Update Form 3File: VIGNAHARTA FORM3 _SEP25.pdf | 17 Nov 2025 |
| Form 1File: ARC 2025.pdf | 21 Jun 2025 |
| Form 2File: ENGG 2025.pdf | 21 Jun 2025 |
| Form 3File: vignaharta form 3 _ 2021 TO 2025.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: vignaharta sold unsold inventory.pdf | 21 Jun 2025 |
| Form 2A (FY 2024-2025)File: Form 2A-9_page-0001.pdf | 21 Jun 2025 |
| Form 5 (FY 2024-2025)File: 0 (4).pdf | 21 Jun 2025 |
| CERSAI detailsFile: CRESAI .pdf | 10 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: vighnnahartha allotment letter MahaRERA.pdf | 10 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: vighnnahartha AGREEMENT OF sale MahaRERA (1).pdf | 10 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vignaharta.pdf | 10 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vignaharta.pdf | 10 Feb 2025 |
| PAN CardFile: VIGNAHARTA-PANCARD.pdf | 26 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: emcumbrance.pdf | 26 Apr 2023 |
| Details of encumbrances concerned to LegalFile: emcumbrance.pdf | 26 Apr 2023 |
| Declaration about Commencement CertificateFile: cc.pdf | 26 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: declaration.pdf | 26 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VIGNHARTA - FORM 5.pdf | 26 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: VIGNHARTA - FORM 5.pdf | 26 Apr 2023 |
| Proforma of Agreement for saleFile: vighnarta - agreement format - efgh.pdf | 26 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS.pdf | 26 Apr 2023 |
| Declaration in FORM BFile: VIGHNAHARTA-2.pdf | 31 Jul 2017 |
| OtherFile: compressed_888219702.pdf | 31 Jul 2017 |
| Building plan approvalFile: cc.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: title nagpur.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: cc.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: compressed_1641247370.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: vignaharta.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: NO ENCUMB.pdf | 12 Jul 2017 |
| Proforma of Allotment letterFile: vighnarta - agreement format - efgh.pdf | 12 Jul 2017 |
| Layout approvalFile: layout plan.pdf | 10 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: layout plan.pdf | 10 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE A TO J.pdf | 10 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 52 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep EMPRESS ROYAL EFGH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nagpur (M Corp.)2,800+ in Nagpur
Filed coordinates, straight-line distance. 99 registered projects within 2 km.
ANANDAM WORLD CENTRE
GOLDBRICKS INFRASTRUCTURE PVT LTD
SUVARNABHOOMI
TIRUPATI DEVELOPERS
81 RSG
R SANDESH LLP
KUKREJA ANANDAM WORLD CITY TOWER H AND M
GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED
THE RISE
R SANDESH LLP
EMPRESS ROYAL A, B, C, D
BEACON REALCON PVT LTD
See every Nagpur project, with the district possession charts
Builder: VIGNAHARTA CORRUGATORS PVT LTD
VIGNAHARTA CORRUGATORS PVT LTD has 1 registration on MahaRERA, including EMPRESS ROYAL EFGH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if EMPRESS ROYAL EFGH is delayed beyond 30 Jan 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EMPRESS ROYAL EFGH?
The registered promoter entity is VIGNAHARTA CORRUGATORS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EMPRESS ROYAL EFGH?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EMPRESS ROYAL EFGH?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EMPRESS ROYAL EFGH?
The professionals named in the filing: Architect: SURESH MISTRY; Architect: SSBEHLIM ASSOCIATES; Engineer: sandeep laxman chougale; Engineer: PRAVIN CIVILSITEENGINER DONGRE; Chartered Accountant: Rishi Sekhari; Chartered Accountant: SURBHI BOTHRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EMPRESS ROYAL EFGH?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback