ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / EMPRESS ROYAL EFGH

Registered No litigation declared Residential / Group Housing project

EMPRESS ROYAL EFGH

By VIGNAHARTA CORRUGATORS PVT LTD

RG-MH-00491 · RERA P50500009773 · Last updated on MahaRERA portal: 28 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 25 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jan 2028Possession promisedmoved 25 months from the original
40 of 44Construction stages doneacross 4 buildings; furthest along: Installation of Lifts, 95%
0 of 160Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

EMPRESS ROYAL EFGH is a Residential / Group Housing project by VIGNAHARTA CORRUGATORS PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500009773 on 22 Aug 2017. Possession is promised by 30 Jan 2028. The completion date has moved by 25 months from the original filing. 160 of the 160 units on this registration are recorded sold or booked, and 40 of 44 construction stages are filed complete.

At a glance

Project

  • NameEMPRESS ROYAL EFGH
  • TypeResidential / Group Housing
  • Location
    • Betul
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440018
  • Pincode440018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500009773
  • ReraGenie IDRG-MH-00491

Builder

  • NameVIGNAHARTA CORRUGATORS PVT LTD
  • Entity typeCompany
  • Managing DirectorJAIMAL SINGH

Key dates

this monthRegisteredAug 2017First promiseDec 2025Revised toJan 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion30 Jan 2028
  • Revised completionRevised to 30 Jan 2028 (originally 30 Dec 2025)
  • Buildings4 building records
  • Documents filed52 files

Current status

100%160 of 160 units booked
100.0%Work done, per cost certificate

Figures as on 28 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EMPRESS ROYAL ENA121040040
EMPRESS ROYAL FNA121040040
EMPRESS ROYAL GNA121040040
EMPRESS ROYAL HNA121040040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 28 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 95%.

EMPRESS ROYAL E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
EMPRESS ROYAL F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
EMPRESS ROYAL G100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
EMPRESS ROYAL H100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 28 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed200

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots200
Closed/Covered160
Open Space40
BuildingClosed/CoveredOpen SpaceTotal
EMPRESS ROYAL E401050
EMPRESS ROYAL F401050
EMPRESS ROYAL G401050
EMPRESS ROYAL H401050

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,178 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jun 2025

Approvals and building plan

Sanctioning authorityNagpur muncipal corporation
Permissible FSI18460.61
Proposed, not sanctioned16,461 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYAN
Estimated costRs 58.00 cr
Cost incurredRs 58.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
EMPRESS ROYAL ENARs 13.00 crRs 13.00 cr
EMPRESS ROYAL FNARs 13.00 crRs 13.00 cr
EMPRESS ROYAL GNARs 13.00 crRs 13.00 cr
EMPRESS ROYAL HNARs 13.00 crRs 13.00 cr
-NARs 6.00 crRs 6.00 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURESH MISTRY
ArchitectSSBEHLIM ASSOCIATES
Engineersandeep laxman chougale
EngineerPRAVIN CIVILSITEENGINER DONGRE
Chartered AccountantRishi Sekhari
Chartered AccountantSURBHI BOTHRA
PartnerRole in project
VIGNAHARTA CORRUGATORS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04072501952Dec 2025 → Jan 2028

Reason as filed by the promoter"In this project, the flats have only been registered. However, since some internal work is still pending, the project has not been fully completed and the Occupancy Certificate (OC) has not yet been received. Therefore, an extension is required to complete the remaining work and obtain the OC."

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2028

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: VIGNAHARTA - FORM2A FOR CORRECTION.pdf28 Sep 2026
Withdrawal Update Form 1File: Vignaharta_form1 - MAR26.pdf23 Sep 2026
Withdrawal Update Form 1File: VIGHNHARTA FORM 1.pdf23 Sep 2026
Withdrawal Update Form 1File: VIGHNHARTA FORM 1.pdf23 Sep 2026
Withdrawal Update Form 2File: vignaharta_ENG CERTIFICATE.pdf23 Sep 2026
Withdrawal Update Form 2File: VIGHNHARTA FORM 2.pdf23 Sep 2026
Withdrawal Update Form 2File: VIGHNHARTA FORM 2.pdf23 Sep 2026
Withdrawal Update Form 3File: vignaharta_FORM-3 _MAR26.pdf23 Sep 2026
Withdrawal Update Form 3File: vignaharta_FORM-3 _MAR26.pdf23 Sep 2026
Withdrawal Update Form 3File: VIGHNHARTA FORM 3.pdf23 Sep 2026
Withdrawal Update Form 1File: vignaharta s s.pdf12 Feb 2026
Withdrawal Update Form 2File: vignaharta_2026021108145800.pdf12 Feb 2026
Withdrawal Update Form 3File: Vignaharta Rera.pdf12 Feb 2026
Withdrawal Update Form 1File: VIGNAHARTA FORM 1.pdf17 Nov 2025
Withdrawal Update Form 1File: VIGNAHARTA FORM 1.pdf17 Nov 2025
Withdrawal Update Form 2File: VIGNAHARTA ENG CERTIFICATE - SEP25.pdf17 Nov 2025
Withdrawal Update Form 2File: VIGNAHARTA ENG CERTIFICATE - SEP25.pdf17 Nov 2025
Withdrawal Update Form 3File: VIGNAHARTA FORM3 _SEP25.pdf17 Nov 2025
Withdrawal Update Form 3File: VIGNAHARTA FORM3 _SEP25.pdf17 Nov 2025
Form 1File: ARC 2025.pdf21 Jun 2025
Form 2File: ENGG 2025.pdf21 Jun 2025
Form 3File: vignaharta form 3 _ 2021 TO 2025.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: vignaharta sold unsold inventory.pdf21 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A-9_page-0001.pdf21 Jun 2025
Form 5 (FY 2024-2025)File: 0 (4).pdf21 Jun 2025
CERSAI detailsFile: CRESAI .pdf10 Feb 2025
Deviation Report with respect to Allotment letterFile: vighnnahartha allotment letter MahaRERA.pdf10 Feb 2025
Deviation Report with respect to model copy of AgreementFile: vighnnahartha AGREEMENT OF sale MahaRERA (1).pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vignaharta.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vignaharta.pdf10 Feb 2025
PAN CardFile: VIGNAHARTA-PANCARD.pdf26 Apr 2023
Details of encumbrances concerned to FinanceFile: emcumbrance.pdf26 Apr 2023
Details of encumbrances concerned to LegalFile: emcumbrance.pdf26 Apr 2023
Declaration about Commencement CertificateFile: cc.pdf26 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: declaration.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VIGNHARTA - FORM 5.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: VIGNHARTA - FORM 5.pdf26 Apr 2023
Proforma of Agreement for saleFile: vighnarta - agreement format - efgh.pdf26 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS.pdf26 Apr 2023
Declaration in FORM BFile: VIGHNAHARTA-2.pdf31 Jul 2017
OtherFile: compressed_888219702.pdf31 Jul 2017
Building plan approvalFile: cc.pdf29 Jul 2017
Copy of the legal title reportFile: title nagpur.pdf29 Jul 2017
Building Plan Approval (IOD)File: cc.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: compressed_1641247370.pdf29 Jul 2017
Certificates of CA (Form 3)File: vignaharta.pdf29 Jul 2017
Details of encumbrancesFile: NO ENCUMB.pdf12 Jul 2017
Proforma of Allotment letterFile: vighnarta - agreement format - efgh.pdf12 Jul 2017
Layout approvalFile: layout plan.pdf10 Jul 2017
Copy of Layout Approval (in case of layout)File: layout plan.pdf10 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE A TO J.pdf10 Jul 2017

How this compares with Nagpur

100%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 25 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EMPRESS ROYAL EFGH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur (M Corp.)2,800+ in Nagpur

2 kmEMPRESS ROYAL EFGHCompleted 38Lapsed / revoked 16Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: VIGNAHARTA CORRUGATORS PVT LTD

VIGNAHARTA CORRUGATORS PVT LTD has 1 registration on MahaRERA, including EMPRESS ROYAL EFGH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if EMPRESS ROYAL EFGH is delayed beyond 30 Jan 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EMPRESS ROYAL EFGH?

The registered promoter entity is VIGNAHARTA CORRUGATORS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EMPRESS ROYAL EFGH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EMPRESS ROYAL EFGH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EMPRESS ROYAL EFGH?

The professionals named in the filing: Architect: SURESH MISTRY; Architect: SSBEHLIM ASSOCIATES; Engineer: sandeep laxman chougale; Engineer: PRAVIN CIVILSITEENGINER DONGRE; Chartered Accountant: Rishi Sekhari; Chartered Accountant: SURBHI BOTHRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EMPRESS ROYAL EFGH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EMPRESS ROYAL EFGH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EMPRESS ROYAL EFGH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.