Home / Browse projects / Nagpur, Maharashtra / ANANDAM WORLD CITY-TOWER G AND N

Registered No litigation declared Residential / Group Housing project

ANANDAM WORLD CITY-TOWER G AND N

By GOLDBRICKS INFRASTRUCTURE PVT LTD

RG-MH-12638 · RERA P50500045835 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
14 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 90%
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

ANANDAM WORLD CITY-TOWER G AND N is a Residential / Group Housing project by GOLDBRICKS INFRASTRUCTURE PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500045835 on 15 Jun 2022. Possession is promised by 31 Mar 2030.

At a glance

Project

  • NameANANDAM WORLD CITY-TOWER G AND N
  • TypeResidential / Group Housing
  • Location
    • MODEL MILL COMPOUND
    • UMRED ROAD
    • GANESHPETH
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440018
  • Pincode440018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500045835
  • ReraGenie IDRG-MH-12638

Builder

  • NameGOLDBRICKS INFRASTRUCTURE PVT LTD
  • Entity typeCompany
  • DirectorsPratik Saraogi, Pratik Saraogi
  • Other registrations5 more →
  • Completed2 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredJun 2022PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed119 files

Current status

85.1%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANANDAM WORLD CITY TOWER GNA230000
ANANDAM WORLD CITY TOWER NNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

ANANDAM WORLD CITY TOWER G90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
ANANDAM WORLD CITY TOWER N90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes35%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
ANANDAM WORLD CITY TOWER G11
ANANDAM WORLD CITY TOWER N11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,904 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityNAGPUR MUNCIPAL CORPORATION
Permissible FSI21989.77
Proposed, not sanctioned21,990 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWARDHAMAN NAGAR NAGPUR
Estimated costRs 153.82 cr
Cost incurredRs 130.86 cr
Work done85.07%
BuildingWingEstimatedIncurred
ANANDAM WORLD CITY TOWER NNARs 76.93 crRs 67.52 cr
ANANDAM WORLD CITY TOWER GNARs 71.19 crRs 62.48 cr
-NARs 5.70 crRs 86.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH JAISWAL
EngineerAVINASH UKEY
Chartered AccountantANKIT TALREJA GAD AND ASSOCIATES
Chartered AccountantA K TOLANI & CO
Chartered AccountantLaabhesh Jagdish savadia
PartnerRole in project
GOLDBRICKS INFRASTRUCTURE PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Tower GN Form 01 31032026.pdf23 Apr 2026
Form 2File: Tower G N Form2 31032026.pdf23 Apr 2026
Form 3File: Tower GN Form 3 31032026_compressed.pdf23 Apr 2026
Disclosure of Sold and Booked InventoryFile: Tower GN Sold Unsold 31032026.pdf23 Apr 2026
Self-declaration of Quarterly ProgressFile: Quarterly Progress 31032026.pdf23 Apr 2026
Form 1File: FORM 1 TOWER GN.pdf22 Jan 2026
Form 2File: Form 2 G N.pdf22 Jan 2026
Form 3File: Form 3 GN.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: Tower GN Sold Unsold.pdf22 Jan 2026
Self-declaration of Quarterly ProgressFile: Self Declaration Q progress.pdf22 Jan 2026
Form 1File: Form 1 Tower G N 30092025.pdf1 Nov 2025
Form 2File: Form 2 Tower G N 30092025.pdf1 Nov 2025
Form 3File: Form 3 Tower G & N 30092025.pdf1 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Tower G & N Sept-2025.pdf1 Nov 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf1 Nov 2025
Withdrawal Update Form 1File: Form 1 Tower G N 30092025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 Tower G N 30092025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 Tower G u0026 N 30092025.pdf18 Oct 2025
Form 1File: Form1 Tower G & N.PDF22 Jul 2025
Form 3File: Form 3 GN Tower.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold of Tower G & N.PDF22 Jul 2025
Form 2File: Form 2 Tower G & N.PDF22 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.PDF22 Jul 2025
OthersFile: Declaration.PDF22 Jul 2025
Form 1File: Form 1.PDF22 Jul 2025
Form 2File: Form 2.PDF22 Jul 2025
Form 3File: Form3 GN.PDF22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.PDF22 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration.PDF22 Jul 2025
OthersFile: Declaration.PDF22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 GN Tower.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 GN.pdf21 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 G and N.PDF2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 GN.PDF5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 GN.PDF29 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold GN Dec24.PDF18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AWC 300924.PDF30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower GN 300924.PDF30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 300924 GN.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024 GN_compressed.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 GN.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 30092024.PDF6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 G N Tower.PDF14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold G N.PDF24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 G N.PDF23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 G N Tower 310324_compressed.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower G N.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower G N.PDF19 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold March-2024_compressed (1).pdf15 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY202223 G N Tower.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 G and N Dec 2023_compressed.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 G and N Dec 2023.PDF13 Jan 2024
Disclosure of sold/ booked inventoryFile: G and N Sold Unsold Dec 2023.PDF13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept-2023 (2).pdf11 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 G N tower.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 G N Tower.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: sold unsold G N Tower.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March-2023 (1).pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June-2023_compressed.pdf28 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower G and N Architech Certificate 31-03-2023.PDF26 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower G and N Architech Certificate 30-06-2023.PDF26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower G and N Engineer Certificate 31-03-2023.PDF26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower G and N Engineer Certificate 30-06-2023.PDF26 Jul 2023
Disclosure of sold/ booked inventoryFile: G and N Tower Sold Unsold 31-03-2023.PDF22 Jul 2023
Disclosure of sold/ booked inventoryFile: G and N Sold Unsold 30-06-2023.PDF22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_June-22_G And N.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Sept-22_G And N.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Dec-22_G And N.pdf12 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) (2).pdf3 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200263377821_For_Asset_Based_Search_17_03_2023_22_51_52_990.pdf17 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT.pdf14 Mar 2023
Disclosure of sold/ booked inventoryFile: Tower G AND N sold unsold_june-22 (2).pdf9 Mar 2023
Disclosure of sold/ booked inventoryFile: Tower G AND N sold unsold_sept-22.pdf9 Mar 2023
Disclosure of sold/ booked inventoryFile: Tower G AND N sold unsold_Dec-22.pdf9 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_G AND N_June-22.pdf9 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_G AND N_Dec-22.PDF9 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A G AND N.pdf5 Sep 2022
Disclosure of sold/ booked inventoryFile: 11zon_merged-PDF (7)_11zon.pdf5 Sep 2022
Layout approvalFile: SITE PLAN (1).pdf13 Jun 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ANANDAM WORLD CENTREP50500033711GANESHPETH, Nagpur397Mar 2022OngoingJun 2027Not due yet
ANANDAM WORLD CITY VILLAP50500009151GANESHPETH, Nagpur-Aug 2017OngoingDec 2026Not due yet
RHSP50500047576GANESHPETH, Nagpur44Nov 2022OngoingMar 2026Registered original: Mar 2025Not delivered
ANANDAM WORLD CITY PART OF TOWER A B AND DP50500004568Nagpur (M Corp.), Nagpur-Aug 2017CompletedAug 2024Dec 2019
LHSP50500025598GANESHPETH, Nagpur-Jul 2020CompletedJun 2023Oct 2022

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANANDAM WORLD CITY-TOWER G AND N on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GANESHPETH2,800+ in Nagpur

2 kmANANDAM WORLD CITY-TOWERCompleted 39Lapsed / revoked 17Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: GOLDBRICKS INFRASTRUCTURE PVT LTD

GOLDBRICKS INFRASTRUCTURE PVT LTD has 6 registrations on MahaRERA, including ANANDAM WORLD CITY PART OF TOWER A B AND D and ANANDAM WORLD CITY VILLA. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ANANDAM WORLD CITY-TOWER G AND N is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANANDAM WORLD CITY-TOWER G AND N?

The registered promoter entity is GOLDBRICKS INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANANDAM WORLD CITY-TOWER G AND N?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANANDAM WORLD CITY-TOWER G AND N?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANANDAM WORLD CITY-TOWER G AND N?

The professionals named in the filing: Architect: RAJESH JAISWAL; Engineer: AVINASH UKEY; Chartered Accountant: ANKIT TALREJA GAD AND ASSOCIATES; Chartered Accountant: A K TOLANI & CO; Chartered Accountant: Laabhesh Jagdish savadia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANANDAM WORLD CITY-TOWER G AND N?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANANDAM WORLD CITY-TOWER G AND N. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANANDAM WORLD CITY-TOWER G AND N to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.