ANANDAM WORLD CITY VILLA
By GOLDBRICKS INFRASTRUCTURE PVT LTD
RG-MH-01833 · RERA P50500009151 · Last updated on MahaRERA portal: 23 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANANDAM WORLD CITY VILLA is a Residential / Group Housing project by GOLDBRICKS INFRASTRUCTURE PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500009151 on 19 Aug 2017. Possession is promised by 30 Dec 2026.
At a glance
Project
- NameANANDAM WORLD CITY VILLA
- TypeResidential / Group Housing
- Location
- ANANDAM WORLD CITY MODEL MILL COMPOUND
- GANESHPETH
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440018
- Pincode440018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500009151
- ReraGenie IDRG-MH-01833
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Aug 2017
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed96 files
Current status
Figures as on 23 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANANDAM WORLD CITY VILLA 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20 | NA | 5 | 0 | 0 | 0 | 0 |
| ANANDAM WORLD CITY VILLA | NA | 2 | 2 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 75%.
ANANDAM WORLD CITY VILLA 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,2077%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
ANANDAM WORLD CITY VILLANot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 25% |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ANANDAM WORLD CITY VILLA 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20 | NA | Rs 41.48 cr | Rs 39.92 cr |
| - | NA | Rs 55.62 lakh | Rs 19.47 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajesh Jaiswal |
| Engineer | Avinash Ukey |
| Chartered Accountant | A K TOLANI & COM |
| Chartered Accountant | Laabhesh Jagdish Savadia |
| Partner | Role in project |
|---|---|
| GOLDBRICKS INFRASTRUCTURE PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architech certificate.pdf | 23 Apr 2026 |
| Form 2File: Villa Form 2 31032026.pdf | 23 Apr 2026 |
| Form 3File: Villa Form 3 31032026.pdf | 23 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Villa Sold Unsold 31032026.pdf | 23 Apr 2026 |
| Self-declaration of Quarterly ProgressFile: Quarterly progress.pdf | 23 Apr 2026 |
| Form 1File: Architech certificate.pdf | 22 Jan 2026 |
| Form 2File: Villa Form 2.pdf | 22 Jan 2026 |
| Form 3File: FORM 3 VILLA.pdf | 22 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: VILLA sold unsold.pdf | 22 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Self Declaration Quarterly progress.pdf | 22 Jan 2026 |
| Form 1File: Form 2 Villa 30092025.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Villa 30092025.pdf | 1 Nov 2025 |
| Form 3File: Form 3 Villa 30092025.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Villa Sept-2025.pdf | 1 Nov 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: Arch Certificate Villa.PDF | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Villa 30092025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 2 Villa 30092025.pdf | 18 Oct 2025 |
| Certificates of CA (Form 3)File: Form 3 Villa.pdf | 21 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March25.pdf | 21 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Villa.PDF | 2 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Villa 311224.PDF | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Form 2 Dec24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 18 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Villa 30062024.pdf | 13 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 Villa 30092024.pdf | 13 Nov 2024 |
| Certificates of CA (Form 3)File: Form 2 Villa 300924.PDF | 13 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Villa 300624.PDF | 13 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Villa 30092024.pdf | 13 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Villa.PDF | 24 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 Villa - 31032024.pdf | 31 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Villa.PDF | 19 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY202223 Villa.pdf | 11 Mar 2024 |
| Certificates of CA (Form 3)File: Villa Form 3 311223_compressed.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Villa Dec 2023.PDF | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Villa sold unsold Dec 2023.PDF | 13 Jan 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 8 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: 30-09-023.PDF | 5 Dec 2023 |
| Proforma of Agreement for saleFile: draft of Agreement to sale.pdf | 5 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 -Sept-2023_compressed.pdf | 9 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate -March-23.pdf | 6 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate -June-23.pdf | 6 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Sept-23.pdf | 6 Nov 2023 |
| Certificates of CA (Form 3)File: Form-3 31-03-2023.pdf | 5 Aug 2023 |
| Certificates of CA (Form 3)File: Form 3 -June-2023.PDF | 5 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Villa Sold Unsold 31-03-2023.PDF | 22 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Villa Sold Unsold 30-06-2023.PDF | 22 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 - June-21 -Vlla.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 - Dec-21- Villa.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 - March-22 - Villa.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 - Sept-21- Villa.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 - June-22 - Villa.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 - Dec-22 - Villa.pdf | 12 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Sept-22 -Villa.pdf | 12 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Villa March-22.pdf | 12 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM -5_VILLA (MAR-22).pdf | 4 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5_MAR-22.pdf | 27 Mar 2023 |
| Certificates of CA (Form 3)File: FORM-3_VILLA_JUNE-21.pdf | 25 Mar 2023 |
| Certificates of CA (Form 3)File: FORM-3_VILLA_SEPT-21.pdf | 25 Mar 2023 |
| Certificates of CA (Form 3)File: FORM-3_VILLA_DEC-21.pdf | 25 Mar 2023 |
| Certificates of CA (Form 3)File: FORM-3_VILLA_MAR-22.pdf | 25 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200263377629_For_Asset_Based_Search_17_03_2023_22_34_42_431.pdf | 17 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Villa Sold Unsold_June-22.pdf | 9 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Villa Sold Unsold_sept-22.pdf | 9 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Villa Sold Unsold_Dec-22.pdf | 9 Mar 2023 |
| Certificates of CA (Form 3)File: FORM-3_ANANDAM VILLA_JUNE-22.pdf | 9 Mar 2023 |
| Certificates of CA (Form 3)File: FORM-3_ANANDAM VILLA_SEPT-22.pdf | 9 Mar 2023 |
| Certificates of CA (Form 3)File: FORM-3_ANANDAM VILLA_DEC-22.pdf | 9 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 villa.PDF | 28 Oct 2022 |
| Certificates of CA (Form 3)File: CA certified Form 3.PDF | 31 Aug 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200244069710_For_Asset_Based_Search_05_08_2022_15_36_58_693.pdf | 5 Aug 2022 |
| Other - TechnicalFile: Format C.pdf | 1 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Unit.PDF | 23 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Certificate For Annual Audit FY 18-19 SIGNED.pdf | 22 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate For Annual Audit FY 19-20 SIGNED.pdf | 22 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certificate For Annual Audit FY 20-21 SIGNED.pdf | 22 Mar 2022 |
| PAN CardFile: 1)Pan Card - GIPL.pdf | 17 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commesement Certificate.PDF | 17 Mar 2022 |
| Declaration about Commencement CertificateFile: Commencement Certificate.PDF | 17 Mar 2022 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| ANANDAM WORLD CITY-TOWER G AND NP50500045835 | GANESHPETH, Nagpur | - | Jun 2022 | Ongoing | Mar 2030 | Not due yet |
| ANANDAM WORLD CENTREP50500033711 | GANESHPETH, Nagpur | 397 | Mar 2022 | Ongoing | Jun 2027 | Not due yet |
| RHSP50500047576 | GANESHPETH, Nagpur | 44 | Nov 2022 | Ongoing | Mar 2026Registered original: Mar 2025 | Not delivered |
| ANANDAM WORLD CITY PART OF TOWER A B AND DP50500004568 | Nagpur (M Corp.), Nagpur | - | Aug 2017 | Completed | Aug 2024 | Dec 2019 |
| LHSP50500025598 | GANESHPETH, Nagpur | - | Jul 2020 | Completed | Jun 2023 | Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANANDAM WORLD CITY VILLA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GANESHPETH2,800+ in Nagpur
Filed coordinates, straight-line distance. 99 registered projects within 2 km.
ANANDAM WORLD CENTRE
GOLDBRICKS INFRASTRUCTURE PVT LTD
SUVARNABHOOMI
TIRUPATI DEVELOPERS
81 RSG
R SANDESH LLP
KUKREJA ANANDAM WORLD CITY TOWER H AND M
GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED
THE RISE
R SANDESH LLP
EMPRESS ROYAL A, B, C, D
BEACON REALCON PVT LTD
See every Nagpur project, with the district possession charts
Builder: GOLDBRICKS INFRASTRUCTURE PVT LTD
GOLDBRICKS INFRASTRUCTURE PVT LTD has 6 registrations on MahaRERA, including ANANDAM WORLD CITY PART OF TOWER A B AND D and ANANDAM WORLD CITY VILLA. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if ANANDAM WORLD CITY VILLA is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANANDAM WORLD CITY VILLA?
The registered promoter entity is GOLDBRICKS INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANANDAM WORLD CITY VILLA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANANDAM WORLD CITY VILLA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANANDAM WORLD CITY VILLA?
The professionals named in the filing: Architect: Rajesh Jaiswal; Engineer: Avinash Ukey; Chartered Accountant: A K TOLANI & COM; Chartered Accountant: Laabhesh Jagdish Savadia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANANDAM WORLD CITY VILLA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.