Home / Browse projects / Nagpur, Maharashtra / KUKREJA ANANDAM WORLD CITY TOWER H AND M
KUKREJA ANANDAM WORLD CITY TOWER H AND M
By GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED
RG-MH-07481 · RERA P50500077314 · Last updated on MahaRERA portal: 23 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 55.00 crore secured on the land, in favour of HDFC BANK
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KUKREJA ANANDAM WORLD CITY TOWER H AND M is a Residential / Group Housing project by GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500077314 on 6 Aug 2024. Possession is promised by 31 Dec 2030. 0 of the 208 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.
At a glance
Project
- NameKUKREJA ANANDAM WORLD CITY TOWER H AND M
- TypeResidential / Group Housing
- Location
- GANESHPETH ROAD
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440018
- Pincode440018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500077314
- ReraGenie IDRG-MH-07481
Builder
- NameGOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED
- Entity typeCompany
- DirectorsPRATIK RAJESH SARAOGI, RAKESH SATYANARAYAN SARAOGI, RAJEEV INDRASINGH BHANDARI
- Company SecretorySAKSHI ASHISH PEDHEKAR
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Aug 2024
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings2 building records
- Documents filed73 files
Current status
Figures as on 23 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KUKREJA ANANDAM WORLD CITY TOWER H | NA | 29 | 26 | 104 | 0 | 104 |
| KUKREJA ANANDAM WORLD CITY TOWER M | NA | 29 | 26 | 104 | 0 | 104 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 85%.
KUKREJA ANANDAM WORLD CITY TOWER H63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 85% |
| Podiums (if any) | 85% |
| Plinth | 85% |
| Stilt Floor | 85% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
KUKREJA ANANDAM WORLD CITY TOWER M46%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 85% |
| Podiums (if any) | 85% |
| Plinth | 85% |
| Stilt Floor | 85% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed312
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| KUKREJA ANANDAM WORLD CITY TOWER H | 156 | 156 |
| KUKREJA ANANDAM WORLD CITY TOWER M | 156 | 156 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| KUKREJA ANANDAM WORLD CITY TOWER H | NA | Rs 83.86 cr | Rs 33.49 cr |
| KUKREJA ANANDAM WORLD CITY TOWER M | NA | Rs 83.86 cr | Rs 33.49 cr |
| - | NA | Rs 75.80 lakh | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJESH JAISWAL |
| Architect | PURSHOTTAM PATANKAR |
| Architect | RAJINDER KUMAR ASSOCIATES |
| Engineer | AVINASH UKEY |
| Chartered Accountant | CA ANKIT TALREJA |
| Chartered Accountant | A K TOLANI & CO |
| Chartered Accountant | LAABHESH JAGDISH SAVADIA |
| Partner | Role in project |
|---|---|
| GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Tower HM Form 01 31032026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Tower HM Form 2 31032026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: TowerHMForm3 31032026_compressed.pdf | 23 Apr 2026 |
| Form 1File: FORM 1 TOWER HM.pdf | 28 Jan 2026 |
| Form 2File: Form 2 HM.pdf | 28 Jan 2026 |
| Form 3File: Form 3 HM.pdf | 28 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Tower HM Sold Unsold.pdf | 28 Jan 2026 |
| OthersFile: Encumbrances certificate.pdf | 28 Jan 2026 |
| Self-declaration of Quarterly ProgressFile: Self Declartion.pdf | 28 Jan 2026 |
| Form 1File: Form 1 Tower H M 30092025.pdf | 1 Nov 2025 |
| Form 2File: Form 2 Tower H M 30092025.pdf | 1 Nov 2025 |
| Form 3File: Form 3 Tower H M 30092025.pdf | 1 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sept-25.pdf | 1 Nov 2025 |
| Self-declaration of Quarterly ProgressFile: SELF DECLARATION.pdf | 1 Nov 2025 |
| Form 2File: Form2 H &M March-25.PDF | 22 Jul 2025 |
| Form 3File: FORM 3 OF Tower H & M March-25.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold H & M March-25.PDF | 22 Jul 2025 |
| Form 1File: Form1 H & M March-25.PDF | 22 Jul 2025 |
| OthersFile: Declaration H & M.PDF | 22 Jul 2025 |
| Form 1File: Form1 H&M Dec-2024.PDF | 22 Jul 2025 |
| Form 2File: Form2 H & M Dec-24.PDF | 22 Jul 2025 |
| Form 3File: Form 3 HM 31122024.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold H & M Dec-24.PDF | 22 Jul 2025 |
| OthersFile: Declaration H & M.PDF | 22 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 HM 31122024_compressed.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 HM 31032025_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HM 31032025.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form1 HM.PDF | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 311224.PDF | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold P3 311224.PDF | 20 Jan 2025 |
| Proforma of Agreement for saleFile: ATS.pdf | 18 Dec 2024 |
| Proforma of Agreement for saleFile: ATS- Leverage Green Meadows (1).pdf | 31 Jul 2024 |
| Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (10).pdf | 31 Jul 2024 |
| Deviation Report with respect to model copy of AgreementFile: ATS DEVIATION REPORT -Leverage Green Meadows.pdf | 31 Jul 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: RERA 26072024.pdf | 30 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 30 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest disclosure of Rajeev Bhandari.PDF | 18 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest disclosure of Sakshi Pedhekar.PDF | 18 Jul 2024 |
| Proforma of Allotment letterFile: -Allotment_Letter- H and M.pdf | 18 Jul 2024 |
| Other - LegalFile: NTC Sale Deed (1)-1-25.pdf | 18 Jul 2024 |
| Other - LegalFile: NTC Sale Deed (1)-26-49.pdf | 18 Jul 2024 |
| Other - TechnicalFile: Architech declaration.pdf | 18 Jul 2024 |
| Copy of the legal title reportFile: LSR for H and M.pdf | 17 Jul 2024 |
| Other - TechnicalFile: DECLARATION_ K A H M.pdf | 17 Jul 2024 |
| Other - TechnicalFile: CC MAIl (2).pdf | 17 Jul 2024 |
| Other - TechnicalFile: Quality-Annexure A H_M.pdf | 15 Jul 2024 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (61).pdf | 3 Jul 2024 |
| Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (28).pdf | 3 Jul 2024 |
| Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development (17).pdf | 3 Jul 2024 |
| Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (61).pdf | 3 Jul 2024 |
| Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (11)-1.pdf | 3 Jul 2024 |
| Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (11)-2.pdf | 3 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (61).pdf | 3 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (61).pdf | 3 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development (28).pdf | 3 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development (17).pdf | 3 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (11)-1.pdf | 3 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development (11)-2.pdf | 3 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (75).pdf | 3 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate (2).PDF | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certficate.PDF | 3 Jul 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosue of Secured unsecured loan.PDF | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KUKREJA ANANDAM_FORM-3.pdf | 3 Jul 2024 |
| PAN CardFile: 1 PAN Card (23).pdf | 15 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (23).pdf | 15 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUM_FINANCE_ HM.PDF | 15 Jun 2024 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (23).pdf | 15 Jun 2024 |
| Details of encumbrances concerned to LegalFile: ENCUM_FINANCE_ HM.PDF | 15 Jun 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (42).pdf | 15 Jun 2024 |
| Declaration in FORM BFile: form b_compressed (1).pdf | 15 Jun 2024 |
| CERSAI detailsFile: 1 CERSAI details (27).pdf | 15 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (12).pdf | 15 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (7).pdf | 15 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KUKREJA ANANDAM WORLD CITY TOWER H AND M on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GANESHPETH ROAD2,800+ in Nagpur
Filed coordinates, straight-line distance. 100 registered projects within 2 km.
ANANDAM WORLD CENTRE
GOLDBRICKS INFRASTRUCTURE PVT LTD
SUVARNABHOOMI
TIRUPATI DEVELOPERS
81 RSG
R SANDESH LLP
THE RISE
R SANDESH LLP
EMPRESS ROYAL A, B, C, D
BEACON REALCON PVT LTD
EMPRESS ROYAL EFGH
VIGNAHARTA CORRUGATORS PVT LTD
See every Nagpur project, with the district possession charts
Builder: GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED
GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED has 1 registration on MahaRERA, including KUKREJA ANANDAM WORLD CITY TOWER H AND M. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if KUKREJA ANANDAM WORLD CITY TOWER H AND M is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KUKREJA ANANDAM WORLD CITY TOWER H AND M?
The registered promoter entity is GOLDBRICKS INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KUKREJA ANANDAM WORLD CITY TOWER H AND M?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KUKREJA ANANDAM WORLD CITY TOWER H AND M?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KUKREJA ANANDAM WORLD CITY TOWER H AND M?
The professionals named in the filing: Architect: RAJESH JAISWAL; Architect: PURSHOTTAM PATANKAR; Architect: RAJINDER KUMAR ASSOCIATES; Engineer: AVINASH UKEY; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: A K TOLANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KUKREJA ANANDAM WORLD CITY TOWER H AND M?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback