Registered No litigation declared Residential / Group Housing project

Alliance Tanvi

By Alliance City Developers Realtors Private Limited

RG-MH-96052 · RERA PR1180002501899 · Last updated on MahaRERA portal: 8 May 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • All 9 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 8Construction stages donefurthest along: Internal walls, 0%
9 of 9Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 10 documents Report an error

Alliance Tanvi is a Residential / Group Housing project by Alliance City Developers Realtors Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1180002501899 on 26 Dec 2025. Possession is promised by 31 Dec 2028. 0 of the 9 units on this registration are recorded sold or booked, and 3 of 8 construction stages are filed complete.

At a glance

Project

  • NameAlliance Tanvi
  • TypeResidential / Group Housing
  • Location
    • P.M. Cross Road
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1180002501899
  • ReraGenie IDRG-MH-96052

Builder

  • NameAlliance City Developers Realtors Private Limited
  • Entity typeCompany
  • CINU65990MH1993PTC075177
  • GSTIN27AACCC0953F1ZY
  • DirectorsSANKET DINESH LUHARUKA, UMA AGRAWAL, PRATIK DINESH LUHARUKA
  • Declared earlier projects14 →

Key dates

this monthRegisteredDec 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Dec 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed10 files

Current status

0%0 of 9 units booked
26.1%Work done, per cost certificate

Figures as on 8 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BuildingNA54909

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 8 construction stages are filed complete. The stage furthest along is Internal walls, at 0%.

Building: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Stilt / Ground20

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area424 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Nov 2025
LandownerVillageDistrict
TANVI COOPERATIVE HOUSING SOCIETY LIMITEDVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI554.2
Proposed, not sanctioned540 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPNB HOUSE,
Estimated costRs 5.00 cr
Cost incurredRs 1.30 cr
Work done26.07%
BuildingWingEstimatedIncurred
BuildingNARs 4.00 crRs 1.04 cr
-NARs 1.00 crRs 26.35 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThe Design Studio
EngineerFrames
Chartered AccountantAkash Vijay Agarwal
PartnerRole in project
Alliance City Developers Realtors Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed10

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: Tanvi Further CC-Merged.pdf8 May 2026
Withdrawal Update Form 1File: Alliance Tanvi - Architect Certificate.pdf8 May 2026
Withdrawal Update Form 2File: Alliance Tanvi - Engineers Certificate.pdf8 May 2026
Withdrawal Update Form 3File: ALLIANCE TANVI RERA FORM 03.pdf8 May 2026
Withdrawal Update Form 1File: Alliance Tanvi - Architect Certificate 31-12-2025.pdf2 Feb 2026
Withdrawal Update Form 2File: Alliance Tanvi - Engineers Certificate 31-12-2025.pdf2 Feb 2026
Withdrawal Update Form 3File: CA CERTIFICATE ALLIANCE TANVI FORM 3-15122025.pdf2 Feb 2026
Building plan approvalFile: Plan -1.pdf14 Nov 2025
Building plan approvalFile: Plan -2.pdf14 Nov 2025
Declaration and undertaking (Annexure A)File: Alliance Tanvi - Declaration on one plot registration..pdf8 Nov 2025

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise5 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ALLIANCE KANCHAN KRUPAP51800077232MULUND WEST, Mumbai Suburban78Jul 2024OngoingJan 2028Not due yet
ALLIANCE VISTAP51800076826VILE PARLE EAST, MUMBAI, Mumbai Suburban26Jun 2024OngoingApr 2027Not due yet
ALLIANCE SEA BREEZEP51800077565SANTACRUZ WEST, Mumbai Suburban19Oct 2024OngoingApr 2027Not due yet
ALLIANCE ETERNISP51800076690BORIVALI WEST, Mumbai Suburban25Jun 2024OngoingApr 2027Not due yet
ALLIANCE ABHIMANYUP51800052607MALAD WEST, Mumbai Suburban61Sep 2023OngoingFeb 2027Not due yet
ALLIANCE SAAWAIP51800047608MALAD WEST, Mumbai Suburban-Nov 2022CompletedAug 2025Jan 2024
ALLIANCE LEGACYP51900035128MATUNGA ROAD, Mumbai City-May 2022CompletedApr 2025Feb 2025
NIRMAL MILANP51800029310VILE PARLE EAST, Mumbai Suburban-May 2021CompletedNov 2024Apr 2023
SWATI SADAN ALLIANCEP51800028825MULUND EAST, Mumbai Suburban-Mar 2021CompletedAug 2024Jun 2023
AMARDEEP ALLIANCEP51800024225St. Pius Church Mulund West, Mumbai Suburban-Jan 2020CompletedJul 2024Sep 2022
ALLIANCE RUIA SADANP51800028041MALAD WEST, Mumbai Suburban-Jan 2021CompletedJun 2024Sep 2022
ALLIANCE MATHURESHP51800025030MULUND WEST, Mumbai Suburban-Mar 2020CompletedDec 2023Apr 2023
ALLIANCE BHASKARP51800028213MALAD WEST, Mumbai Suburban-Feb 2021CompletedDec 2023Aug 2022
Alliance Ravi KiranP51800018068Mulund East, Mumbai Suburban-Oct 2018CompletedOct 2022Oct 2022

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Alliance Tanvi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vileparle6,700+ in Mumbai Suburban

2 kmAlliance TanviCompleted 145Lapsed / revoked 77Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 362 registered projects within 2 km.

Builder: Alliance City Developers Realtors Private Limited

Alliance City Developers Realtors Private Limited has 1 registration on MahaRERA, including Alliance Tanvi. Its filings disclose 14 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Alliance Tanvi is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Alliance Tanvi?

The registered promoter entity is Alliance City Developers Realtors Private Limited, a company as per the filing. Its CIN U65990MH1993PTC075177 and GSTIN 27AACCC0953F1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Alliance Tanvi?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Alliance Tanvi?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Alliance Tanvi?

The professionals named in the filing: Architect: The Design Studio; Engineer: Frames; Chartered Accountant: Akash Vijay Agarwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Alliance Tanvi?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Alliance Tanvi. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Alliance Tanvi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.