Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 11 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 15 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
36 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

ALLIANCE ABHIMANYU is a Residential / Group Housing project by ALLIANCE CITY DEVELOPERS REALTORS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052607 on 11 Sep 2023. Possession is promised by 28 Feb 2027. 25 of the 61 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameALLIANCE ABHIMANYU
  • TypeResidential / Group Housing
  • Location
    • VISHAL NAGAR ABHIMANYU
    • MITH COLONY
    • MARVE ROAD
    • MALAD WEST
    • Valnai
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052607
  • ReraGenie IDRG-MH-06544

Builder

  • NameALLIANCE CITY DEVELOPERS REALTORS PVT LTD
  • Entity typeCompany
  • CINU65990MH1993PTC075177
  • GSTIN27AACCC0953F1ZY
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorSANKET DINESH LUHARUKA
  • DirectorUMA DINESH AGRAWAL
  • Other registrations15 more →
  • Completed10 of 16
  • Declared earlier projects12 →

Key dates

this monthRegisteredSep 2023PromisedFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2023
  • Promised completion28 Feb 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

41%25 of 61 units booked
98.1%Work done, per cost certificate

Figures as on 21 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ALLIANCE ABHIMANYUNA141461061

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

ALLIANCE ABHIMANYU: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes90%

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered67

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,128 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Nov 2025
LandownerVillageDistrict
VISHAL NAGAR ABHIMANYU CO OPERATIVE HSG SOC LTDMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2325.98
Proposed, not sanctioned2,326 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPNB HOUSE BRANCH
Estimated costRs 22.02 cr
Cost incurredRs 21.61 cr
Work done98.13%
BuildingWingEstimatedIncurred
ALLIANCE ABHIMANYUNARs 17.65 crRs 17.30 cr
-NARs 4.37 crRs 4.31 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN STUDIO
EngineerFRAME
EngineerNEERAJ AGRAWAL
Chartered AccountantAKASH AGARWAL
Chartered AccountantRakesh Agarwal
PartnerRole in project
ALLIANCE CITY DEVELOPERS REALTORS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Aug 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Aug 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: PLAN_1-1.pdf21 Aug 2026
Building plan approvalFile: PLAN_2-2.pdf21 Aug 2026
Building plan approvalFile: PLAN_3-end.pdf21 Aug 2026
Commencement certificateFile: FULL CC.pdf21 Aug 2026
Withdrawal Update Form 1File: FORM 1 - 30-06-2026.pdf21 Aug 2026
Withdrawal Update Form 2File: FORM 2 - 30-06-2026.pdf21 Aug 2026
Withdrawal Update Form 3File: FORM 3 - 30-06-2026.pdf21 Aug 2026
Withdrawal Update Form 1File: FORM 1 - 31-12-2025.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM 1 - 31-03-2026.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM 2 - 31-12-2025.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM 2 - 31-03-2026.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM 3 - 31-03-2026.pdf19 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A - 2025-26.pdf19 Jun 2026
Withdrawal Update Form 1File: Architect Certificate.pdf5 May 2026
Withdrawal Update Form 2File: Engineers Certificate.pdf5 May 2026
Withdrawal Update Form 3File: CA Certificate.pdf5 May 2026
Withdrawal Update Form 1File: FORM 1 - 30-09-2025.pdf15 Dec 2025
Withdrawal Update Form 2File: FORM 2 - 30-09-2025.pdf15 Dec 2025
Withdrawal Update Form 3File: FORM 3 30-09-2025.pdf15 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5 - 2024-25.pdf5 Nov 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf30 Oct 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf30 Oct 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf30 Oct 2025
Form 2A (FY 2023-2024)File: Alliance Abhimanyu - FORM 2A - 2023-24.pdf30 Oct 2025
Form 2A (FY 2024-2025)File: Alliance Abhimanyu - FORM 2A - 2024-2025.pdf30 Oct 2025
Form 1File: FORM 1.pdf16 Jul 2025
Form 2File: FORM 2.pdf16 Jul 2025
Form 3File: FORM 3.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY - ALLIANCE ABHIMANYU..pdf16 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA .pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alliance Abhimanyu - Engineers Certificate.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY - ALLIANCE ABHIMANYU.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (3).pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE FORM 1.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alliance Abhimanyu - Engineers Certificate (31-12-2024)_pdf.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: ALLIANCE ABHIMANYU CC.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 FORM 3 (1).pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alliance Abhimanyu - Architect Certificate (30-06-2024).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alliance Abhimanyu - Engineers Certificate (30-06-2024).pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Alliance Abhimanyu - FORM 2A (30-06-2024) (1).pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Alliance Abhimanyu - FORM 2A.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alliance Abhimanyu - Architect Certificate (31-03-2024).pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alliance Abhimanyu - Engineers Certificate (31-03-2024).pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Alliance Abhimanyu - FORM 2A (31-03-2024).pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Alliance Abhimanyu - DISCLOSURE OF SOLD UNSOLD (31-03-2024).pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Alliance Abhimanyu - Form 3 (31-03-2024) (2).pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA ABHIMANYU.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf11 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment Letter.pdf28 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf26 Aug 2023
Proforma of Allotment letterFile: ABHIMANYU - ALLOTTMENT LETTER.pdf26 Aug 2023
Proforma of Agreement for saleFile: ABHIMANYU - SALE AGREEMENT DRAFT.pdf26 Aug 2023
Deviation Report with respect to model copy of AgreementFile: ABHIMANYU- DEVIATION REPOR.pdf26 Aug 2023
Declaration about Commencement CertificateFile: ALLIANCE ABHIMANYU - DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf25 Aug 2023
CERSAI detailsFile: ALLIANCE ABHIMANYU - CERSAI LETTER.pdf25 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ALLIANCE ABHIMANYU - RERA BANK LETTER.pdf25 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (66).pdf21 Aug 2023
Building plan approvalFile: Alliance Abhimanyu - IOD.pdf18 Aug 2023
Layout approvalFile: Alliance Abhimanyu - IOD Drawing_1-1.pdf18 Aug 2023
Building plan approvalFile: Alliance Abhimanyu - IOD Drawing_2-2.pdf18 Aug 2023
Building plan approvalFile: Alliance Abhimanyu - IOD Drawing_3-end.pdf18 Aug 2023
PAN CardFile: Alliance Abhimanyu - Company Pan Card.pdf18 Aug 2023
Copy of the legal title reportFile: Alliance Abhimanyu - Rera Title Certificate.pdf18 Aug 2023
Details of encumbrances concerned to FinanceFile: ilovepdf_merged (65).pdf18 Aug 2023
Details of encumbrances concerned to LegalFile: ilovepdf_merged (65).pdf18 Aug 2023
Copy of Layout Approval (in case of layout)File: Alliance Abhimanyu - IOD Drawing_1-1.pdf18 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Alliance Abhimanyu - IOD.pdf18 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Alliance Abhimanyu - IOD Drawing_2-2.pdf18 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Alliance Abhimanyu - IOD Drawing_3-end.pdf18 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Alliance Abhimanyu - First CC.pdf18 Aug 2023
Declaration in FORM BFile: Alliance Abhimanyu - Form B (Developer).pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Alliance Abhimanyu - Architect Certificate.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Alliance Abhimanyu - Engineers Certificate.pdf18 Aug 2023

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ALLIANCE SAAWAIP51800047608MALAD WEST, Mumbai Suburban9Nov 2022CompletedAug 2025Jan 2024
NIRMAL MILANP51800029310VILE PARLE EAST, Mumbai Suburban33May 2021CompletedNov 2024Apr 2023
SWATI SADAN ALLIANCEP51800028825MULUND EAST, Mumbai Suburban22Mar 2021CompletedAug 2024Jun 2023
AMARDEEP ALLIANCEP51800024225St. Pius Church Mulund West, Mumbai Suburban-Jan 2020Certificate SignedJul 2024Sep 2022
AMARDEEP ALLIANCEP51800024225St. Pius Church Mulund West, Mumbai Suburban-Jan 2020CompletedJul 2024Sep 2022
ALLIANCE RUIA SADANP51800028041MALAD WEST, Mumbai Suburban7Jan 2021CompletedJun 2024Sep 2022
ALLIANCE MATHURESHP51800025030MULUND WEST, Mumbai Suburban36Mar 2020CompletedDec 2023Apr 2023
ALLIANCE BHASKARP51800028213MALAD WEST, Mumbai Suburban26Feb 2021CompletedDec 2023Aug 2022
Alliance Ravi KiranP51800018068Mulund East, Mumbai Suburban24Oct 2018CompletedOct 2022Oct 2022
MANDAR PUSHPA CHSLMandar Pushpa CHSL Sant Dnyaneshwar Road Near Suyog Hall Mulund East Mumbai 40008131-CompletedAug 2018Jul 2017
Sudeep CHSLSudeep CHS Sant Dnyaneshwar Marg Opp Suyog Hall Mulund East Mumbai 40008113-CompletedDec 2016Mar 2016

How this compares with Mumbai Suburban

41%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ALLIANCE ABHIMANYU on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

2 kmALLIANCE ABHIMANYUCompleted 143Lapsed / revoked 92Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 377 registered projects within 2 km.

Builder: ALLIANCE CITY DEVELOPERS REALTORS PVT LTD

ALLIANCE CITY DEVELOPERS REALTORS PVT LTD has 16 registrations on MahaRERA, including Alliance Ravi Kiran and AMARDEEP ALLIANCE. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ALLIANCE ABHIMANYU is delayed beyond 28 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALLIANCE ABHIMANYU?

The registered promoter entity is ALLIANCE CITY DEVELOPERS REALTORS PVT LTD, a company as per the filing. Its CIN U65990MH1993PTC075177 and GSTIN 27AACCC0953F1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALLIANCE ABHIMANYU?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ALLIANCE ABHIMANYU?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALLIANCE ABHIMANYU?

The professionals named in the filing: Architect: THE DESIGN STUDIO; Engineer: FRAME; Engineer: NEERAJ AGRAWAL; Chartered Accountant: AKASH AGARWAL; Chartered Accountant: Rakesh Agarwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALLIANCE ABHIMANYU?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALLIANCE ABHIMANYU. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALLIANCE ABHIMANYU to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.