Home / Browse projects / Sindhudurg, Maharashtra / YOG ANAND

Registered No litigation declared Plotted project

YOG ANAND

By DOMILIS ESTATE LLP

RG-MH-06871 · RERA P52900054767 · Last updated on MahaRERA portal: 3 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
48 of 48Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

YOG ANAND is a Plotted project by DOMILIS ESTATE LLP in Sindhudurg, Maharashtra, registered with MahaRERA as P52900054767 on 12 Feb 2024. Possession is promised by 31 Dec 2031. 0 of the 48 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameYOG ANAND
  • TypePlotted
  • Location
    • MANERI KOLEMAD ROAD
    • YOG CITY MANERI
    • Maneri
    • Dodamarg
    • Sindhudurg
    • 416512
  • Pincode416512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900054767
  • ReraGenie IDRG-MH-06871

Builder

  • NameDOMILIS ESTATE LLP
  • Entity typeLimited Liability Partnership
  • LLPINACP-1377

Key dates

this monthRegisteredFeb 2024PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2031
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed94 files

Current status

0%0 of 48 units booked

Figures as on 3 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 3 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area16,662 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 May 2026

Approvals and building plan

Sanctioning authorityTEHSILDAR DODAMARG
Permissible FSI1.0

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNR VANDANA CINEMA PACHPAKHADI THANE WEST 400602

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGajendra Bhoite
EngineerPurushottam Kumar D
Chartered AccountantJoshi Kale & Associates
Chartered AccountantKirtane & Pandit LLP
PartnerRole in project
DOMILIS ESTATE LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500270Venkatakrishnan VasuPREMLATA JAYPRAKASH MAURYA25/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf3 May 2026
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf3 May 2026
Form 2A (FY 2025-2026)File: Form 2A FY 24-25.pdf3 May 2026
Form 1File: Form 1 as on March 2024__Premalata Maurya.pdf2 May 2026
Form 2File: FORM 2 as on March 2024__Premlata Maurya.pdf2 May 2026
Form 3File: Form 3 of Premlata Maurya__Q4 FY 2023-24.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory March 2024.pdf2 May 2026
Form 1File: Form 1 as on Sept 2024.pdf2 May 2026
Form 2File: FORM 2 as on Sept 2024.pdf2 May 2026
Form 3File: Form 3 of Premlata Maurya__Q2 FY 2024-25.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory Sep 2024.pdf2 May 2026
Form 1File: Form 1 as on December 2024.pdf2 May 2026
Form 2File: Form 2 as on December 2024.pdf2 May 2026
Form 3File: Form 3 of Premlata Maurya__Q3 FY 2024-25.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory Dec 2024.pdf2 May 2026
Form 1File: Form 1 as on Sept 2025.pdf2 May 2026
Form 2File: Form 2 as on Sept 2025.pdf2 May 2026
Form 3File: Form 3 of Premlata Maurya__Q2 FY 2025-26.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory Sept 2025.pdf2 May 2026
Form 1File: Form 1 as on December 2025.pdf2 May 2026
Form 2File: Form 2 as on December 2025.pdf2 May 2026
Form 3File: Form 3 of Premlata Maurya__Q3 FY 2024-25.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory December 2025.pdf2 May 2026
Form 1File: Form 1 as on March 2026__Domilis Estate LLP.pdf2 May 2026
Form 2File: Form 2 as on March 2026__Domilis Estate LLP.pdf2 May 2026
Form 3File: Form 3 Domilis__Q4 FY 2025-26.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory March 2026.pdf2 May 2026
Form 5 (FY 2023-2024)File: Form 5 Mrs Premlata Jayprakash Maurya __FY 23-24.pdf2 May 2026
Form 5 (FY 2024-2025)File: Form 5 Premlata Maurya__FY 24-25.pdf2 May 2026
Form 5 (FY 2025-2026)File: Form 5 Domilis Estate LLP__FY 25-26.pdf2 May 2026
Form 3File: Form-3 Premlata apr to jun 25 final.pdf22 Jul 2025
Form 1File: ARCHITECT CERTIFICATE APR TO JUN 2025 FINAL.pdf22 Jul 2025
Form 2File: ENG CERTIFICATE FORM 2 PJM FINAL.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: UNSOLD INVENTARY JAN TO MARCH 25.pdf22 Jul 2025
Form 1File: ARCHITECT CERTIFICATE form 1 final.pdf22 Jul 2025
Form 2File: 2 for eng cert final.pdf22 Jul 2025
Form 3File: CA CERTI FINAL.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD LIST.pdf22 Jul 2025
Form 1File: ARCHITECT CERTIFICATE APR TO JUN 2025 FINAL.pdf19 Jul 2025
Form 2File: ENG CERTIFICATE FORM 2 PJM FINAL.pdf19 Jul 2025
Form 3File: Form-3 Premlata apr to jun 25 final.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD LIST APR TO JUN 2025.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE (2).pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Axis Lake City Avenue.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 11_Engineer_merged.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sept 2024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 2024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2024.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2024.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2024.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2023.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 30062024 RERA.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 30092024 RERA.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 31032024 RERA.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold_ booked inventory.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 01.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 02.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 03.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFICATE 02.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFICATE 03.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFICATE 01.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Declaration sold unsold inventory.pdf4 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Declartion engineer qulity assurance.pdf4 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 03.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 01.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 02.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate 03.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARCHITECT CERTIFICATE 02.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARCHITECT CERTIFICATE 01.pdf13 Nov 2024
Layout approvalFile: Maneri Clear Copy (1) .pdf29 Jan 2024
Building plan approval or NA orderFile: sanction na plotting.pdf29 Jan 2024
Copy of Layout Approval (in case of layout)File: Maneri Clear Copy (1) .pdf29 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: sanction na plotting.pdf29 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Declaration d.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf29 Jan 2024
Other - TechnicalFile: Declaration.pdf29 Jan 2024
Copy of the legal title reportFile: PREMLATA MAURYA search 2023 rera (2) Final.pdf21 Dec 2023

How this compares with Sindhudurg

0%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep YOG ANAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near YOG CITY MANERI530+ in Sindhudurg

2 kmYOG ANANDCompleted 1Lapsed / revoked 1Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: DOMILIS ESTATE LLP

DOMILIS ESTATE LLP has 1 registration on MahaRERA, including YOG ANAND. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if YOG ANAND is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YOG ANAND?

The registered promoter entity is DOMILIS ESTATE LLP, a limited liability partnership as per the filing. Its LLPIN ACP-1377 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YOG ANAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against YOG ANAND?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for YOG ANAND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YOG ANAND?

The professionals named in the filing: Architect: Gajendra Bhoite; Engineer: Purushottam Kumar D; Chartered Accountant: Joshi Kale & Associates; Chartered Accountant: Kirtane & Pandit LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YOG ANAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YOG ANAND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YOG ANAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.