Wisdom Skyverse

By PREMIER CITY

RG-MH-19373 · RERA P52100078504 · Last updated on MahaRERA portal: 22 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2031Possession promisedmoved 4 months from the original
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
140 of 146Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Wisdom Skyverse is a Others project by PREMIER CITY in Pune, Maharashtra, registered with MahaRERA as P52100078504 on 19 Dec 2024. Possession is promised by 30 Apr 2031. The completion date has moved by 4 months from the original filing. 6 of the 146 units on this registration are recorded sold or booked, and 0 of 44 construction stages are filed complete.

At a glance

Project

  • NameWisdom Skyverse
  • TypeOthers
  • Location
    • PIMPRI
    • Haveli
    • Pune
    • 411018
  • Pincode411018
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078504
  • ReraGenie IDRG-MH-19373

Builder

  • NamePREMIER CITY
  • Entity typePartnership
  • PartnersVijay Bhikanseth Kate, Umesh Gangaram Chandgude
  • Partner(authorised signatory)SHRI VIJAY JAGTAP
  • PartnersMRS RITA AGARWAL, AMIT GUPTA

Key dates

this monthRegisteredDec 2024First promiseDec 2030Revised toApr 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Dec 2024
  • Promised completion30 Apr 2031
  • Revised completionRevised to 30 Apr 2031 (originally 31 Dec 2030)
  • Buildings4 building records
  • Documents filed104 files

Current status

4%6 of 146 units booked
5.7%Work done, per cost certificate

Figures as on 22 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING H2NA60000
WING H1NA60000
WING A2NA171140040
WING A1NA34281060106

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

WING H20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING H10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed416

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots416
Closed/Covered416
BuildingClosed/CoveredTotal
WING H2104104
WING H1103103
WING A2104104
WING A1105105

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area27,300 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Dec 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI39420.64
Proposed, not sanctioned39,421 sq m
Buildings approved7
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch4/ 4A KUNAL PLAZA, CTS NO 453 L, STATION ROAD, CHINCHWAD, PUNE, MAHARASHTRA - 411 019.
Estimated costRs 135.83 cr
Cost incurredRs 7.75 cr
Work done5.71%
BuildingWingEstimatedIncurred
WING A2NARs 61.58 crRs 3.52 cr
WING A1NARs 38.17 crRs 2.18 cr
WING H2NARs 12.82 crRs 73.20 lakh
-NARs 12.04 crRs 68.73 lakh
WING H1NARs 11.21 crRs 63.98 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEMPIRIC SPACE
ArchitectVishal Jadhav
Engineergensys lifespaces LLP
EngineerDipak Sonawane
Chartered AccountantM N GURRAM AND CO
Chartered AccountantSumeet Kate
Chartered AccountantS GAUTAM & ASSOCIATES LLP
Chartered AccountantAzam Mulani
PartnerRole in project
PREMIER CITY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100078504/WarDec 2030 → Apr 2031

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2031

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: F1 Signed.pdf22 Jul 2026
Withdrawal Update Form 2File: Signed F2.pdf22 Jul 2026
Withdrawal Update Form 3File: Wisdom Skyverse.pdf22 Jul 2026
Layout approvalFile: wp1_compressed (1).pdf28 Apr 2026
Building plan approvalFile: wp2.pdf28 Apr 2026
Building plan approvalFile: wp 3.pdf28 Apr 2026
Building plan approvalFile: wp4.pdf28 Apr 2026
Building plan approvalFile: wp5.pdf28 Apr 2026
Building plan approvalFile: wp6.pdf28 Apr 2026
Building plan approvalFile: wp7.pdf28 Apr 2026
Building plan approvalFile: wp 8.pdf28 Apr 2026
Building plan approvalFile: wp9.pdf28 Apr 2026
Building plan approvalFile: wp10.pdf28 Apr 2026
Building plan approvalFile: wp11.pdf28 Apr 2026
Building plan approvalFile: wp12.pdf28 Apr 2026
Building plan approvalFile: wp13.pdf28 Apr 2026
Building plan approvalFile: wp14.pdf28 Apr 2026
Building plan approvalFile: wp 16.pdf28 Apr 2026
Building plan approvalFile: wp15.pdf28 Apr 2026
Building plan approvalFile: wp 17.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf28 Apr 2026
Withdrawal Update Form 3File: Wisdom form 3.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3_compressed (4).pdf25 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3_compressed (4).pdf23 Apr 2026
Form 2A (FY 2025-2026)File: Wisdom Park RERA FORM -2A- 31-03-26.pdf7 Apr 2026
Withdrawal Update Form 1File: Q3- Form 1.pdf3 Feb 2026
Withdrawal Update Form 2File: Q3- Form 2.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf3 Feb 2026
Form 2A (FY 2024-2025)File: Quality Assurance Certificate - Form 2A.pdf21 Nov 2025
Form 1File: Form 1 - Architect Certificate.pdf6 Nov 2025
Form 2File: Engg Certificate s.pdf6 Nov 2025
Form 3File: Form 3 - Q2.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List (4).pdf6 Nov 2025
Form 1File: Form 1 - Architect Certificate (1).pdf15 Jul 2025
Form 2File: Form 2 Engineers Certificate (1).pdf15 Jul 2025
Form 3File: Form 3 - 25-26-Q1.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold (4).pdf15 Jul 2025
Form 1File: f1 dec 24.pdf19 Jun 2025
Form 2File: f2 dec 24.pdf19 Jun 2025
Form 3File: Form 3 - Q3.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold dec 24.pdf19 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration Oct-Dec 24.pdf19 Jun 2025
Form 1File: f1 mar 25.pdf16 Jun 2025
Form 2File: f2 mar 25.pdf16 Jun 2025
Form 3File: f3 mar 25 wis_compressed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: sol mar 25.pdf16 Jun 2025
Layout approvalFile: WISDOM PARK- Plot Layout.pdf12 Dec 2024
Copy of Layout Approval (in case of layout)File: WISDOM PARK- Plot Layout.pdf12 Dec 2024
Other - LegalFile: Sanction Plan 1 NEW_compressed.pdf9 Dec 2024
Other - FinanceFile: FORM B - OPENING OF RERA DESIGNATED BANK ACCOUNTS - NEW.pdf8 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORM B - OPENING OF RERA DESIGNATED BANK ACCOUNTS - NEW.pdf8 Nov 2024
Other - TechnicalFile: CONSENT LETTER.pdf29 Oct 2024
Other - TechnicalFile: NEW DECLARATION AS PER ORDER 50.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost AND Fund withdrawal NEW.pdf19 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Specimen format of Declaration-Cum-Undertaking new.pdf19 Oct 2024
CERSAI detailsFile: 1 CERSAI details 2.pdf7 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE FOR SECUREDUNSECURED FINANCE AVAILED FOR THE PROJECT.pdf13 Aug 2024
Building plan approvalFile: Sanction Plan 2.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 4.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 10.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 11.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 3_compressed.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 5_compressed.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 6_compressed.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 7_compressed.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 8_compressed.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 9_compressed.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 13_compressed.pdf7 Aug 2024
Building plan approvalFile: Sanction Plan 12_compressed.pdf7 Aug 2024
Details of encumbrances concerned to FinanceFile: EC.pdf7 Aug 2024
Proforma of Allotment letterFile: Allotment Letter.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 12_compressed.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 13_compressed.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 9_compressed.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 8_compressed.pdf7 Aug 2024

How this compares with Pune

4%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Wisdom Skyverse on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPRI13,700+ in Pune

2 kmWisdom SkyverseCompleted 65Lapsed / revoked 35Other 128Dot size: filed unitsN

Filed coordinates, straight-line distance. 228 registered projects within 2 km.

Builder: PREMIER CITY

PREMIER CITY has 1 registration on MahaRERA, including Wisdom Skyverse. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Wisdom Skyverse is delayed beyond 30 Apr 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Wisdom Skyverse?

The registered promoter entity is PREMIER CITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Wisdom Skyverse?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Wisdom Skyverse?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Wisdom Skyverse?

The professionals named in the filing: Architect: EMPIRIC SPACE; Architect: Vishal Jadhav; Engineer: gensys lifespaces LLP; Engineer: Dipak Sonawane; Chartered Accountant: M N GURRAM AND CO; Chartered Accountant: Sumeet Kate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Wisdom Skyverse?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Wisdom Skyverse. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Wisdom Skyverse to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.