Red flags
- 326 complaints at MahaRERA
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Wintergreen is a Residential / Group Housing project by CCI PROJECTS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003067 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 326 complaints are on record with the regulator.
At a glance
Project
- NameWintergreen
- TypeResidential / Group Housing
- Location
- Western Express Highway
- Borivali East
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800003067
- ReraGenie IDRG-MH-11904
Builder
- NameCCI PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU70102MH2000PTC128732
- GSTIN27AABCT4694B1ZC
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsHiten A Khatau, Rohan Hiten Khatau
- Other registrations7 more →
- Completed2 of 8
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Aug 2017
- Promised completion30 Dec 2021
- Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
- Buildings6 building records
- Documents filed122 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wintergreen D Wing | NA | 46 | 0 | 0 | 0 | 0 |
| Wintergreen A Wing | NA | 46 | 0 | 0 | 0 | 0 |
| Wintergreen B Wing | NA | 11 | 0 | 0 | 0 | 0 |
| Wintergreen E Wing | NA | 11 | 0 | 0 | 0 | 0 |
| Wintergreen C Wing | NA | 15 | 0 | 0 | 0 | 0 |
| Wintergreen F Wing | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 3 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
66 of 66 construction stages are filed complete across 6 buildings.
Wintergreen D Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wintergreen A Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wintergreen B Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wintergreen E Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wintergreen C Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wintergreen F Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed1150
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wintergreen D Wing | 425 | 425 |
| Wintergreen A Wing | 416 | 416 |
| Wintergreen B Wing | 56 | 56 |
| Wintergreen E Wing | 60 | 60 |
| Wintergreen C Wing | 95 | 95 |
| Wintergreen F Wing | 98 | 98 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vipul Mistry & Associates |
| Architect | R Design Architects |
| Architect | SpaceAge Consultants |
| Engineer | Madhu Sudhanan M P V |
| Engineer | Milind Naik |
| Engineer | Shanghvi and Associates Consultants Private Limited |
| Chartered Accountant | S A Sangani & Associates llp |
| Partner | Role in project |
|---|---|
| CCI PROJECTS PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe main lender to the said Project is Indiabulls Housing Finance Limited, who, owing to the liquidity crunch in the NBFC market has stopped funding the project since September, 2018. A sanctioned amount of 50 crores is being withheld from disbursal by Indiabulls Housing Finance Limited Consequentially, as a result of its cash flows drying up, the Promoter has been unable to pay its contractor’s dues and work has halted since.
Litigation declared4
| Case | Court | Status |
|---|---|---|
| Lodging 1360/2017 | Bombay High Court | pending hearing and final disposal |
| ULP No 18/2017 | Before the Member of the Industrial Court at Mumbai Court at Mumbai | as per final order matter stands disposed as settled and withdrawn |
| 3952/2019 | National Company Law Tribunal Mumbai | as per final order matter stands disposed as settled and withdrawn |
| 325/2020 | National Company Law Tribunal Mumbai | as per final order matter stands disposed as settled and withdrawn |
Complaints filed with MahaRERA326
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000171567 | Nagma Khatoon Khan | CCI Project Pvt Ltd | 20/11/2019 |
| CC006000000100522 | Rajaram Subramaniam | CCI Projects Pvt. Ltd. | 14/08/2019 |
| CC006000000120991 | Sainath Iyer | CCI Projects Pvt. Ltd. | 21/09/2019 |
| CC006000000193723 | Mr. MARGESH MODI & Mrs. AMI MARGESH MODI | CCI PROJECTS PRIVATE LIMITED | 13/08/2020 |
| CC006000000001752 | Rahul Chandrabhan Arora | CCI Project Pvt Ltd | 22/12/2020 |
| CC006000000012599 | Rupali and Sunil Zankar | CCI Projects PvtLtd | 29/12/2017 |
| CC006000000171817 | SATISH WAMAN WAGH | CCI PROJECTS PVT.LTD. | 16/12/2019 |
| CC006000000022900 | Rashmi Raina and Ramesh Singh | CCI Projects Pvt. Ltd. | 10/11/2019 |
| CC006000000023191 | Dhiraj Agarwal | Dhiraj Kumar Agarwal | 02/02/2018 |
| CC006000000023579 | Dhiraj Kumar Agarwal | CCI Projects Private Limited | 03/03/2018 |
| CC006000000054855 | Robin Agarwal | C.C.I. Projects Pvt. Ltd. | 13/06/2018 |
| CC006000000044076 | Raju Ashar & Ami Ashar | M/S CCI Projects Pvt. Ltd. | 13/04/2018 |
| CC006000000044118 | Rajesh Joshi | CCI Projects Private Limited | 15/04/2018 |
| CC006000000171830 | Ravindra Shankar Sawant | CCI Projects Pvt. Ltd. | 11/12/2019 |
| CC006000000171834 | Ravindra Shankar Sawant | CCI Projects Pvt. Ltd. | 11/12/2019 |
| CC006000000054636 | RAJESH KUMAR CHAUDHARY | CCI PROJECTS PRIVATE LIMITED | 25/05/2018 |
| CC006000000054777 | Hemal Naik | CCI Projects Pvt Ltd | 09/06/2018 |
| CC006000000054956 | POONAM PRADYUMNA PONKSHE | CCI PROJECTS | 16/06/2018 |
| CC006000000193854 | POONAM PRADYUMNA PONKSHE | CCI PROJECTS | 28/08/2020 |
| CC006000000055491 | Mrs. Jyoti K Narang and Mr. Kishor Narang | CCI Project Pvt Ltd | 25/07/2018 |
| CC006000000055723 | PANKAJ MOHAN | CCI PROJECTS PRIVATE LIMITED | 10/08/2018 |
| CC006000000055728 | SUDHA AGARWAL | CCI PROJECTS PRIVATE LIMITED | 10/08/2018 |
| CC006000000056117 | CCI Projects Pvt. Ltd. | Sushil Garg and Rishi Garg | 07/09/2018 |
| CC006000000056120 | CCI Projects Pvt. Ltd. | Karan Singh Jaitawat | 07/09/2018 |
| CC006000000056115 | Sriram Krishnan | CCI Projects Private Limited | 10/09/2018 |
| CC006000000056532 | Manoj kumar | Director,RIVALI PARK | 14/10/2018 |
| CC006000000161287 | Shreyas Mhatre / Sonali Mhatre | Ashutosh Khatawkar / CCI Projects Pvt Ltd | 27/10/2019 |
| CC006000000161363 | Dhaval Suhas Patil | CCI PROJECTS PRIVATE LIMITED | 27/10/2019 |
| CC006000000161364 | Saurabh Bhatte | CCI PROJECTS PRIVATE LIMITED | 27/10/2019 |
| CC006000000057389 | Sandhya and Ratnakar Behera | CCI PROJECT PRIVATE LIMITED | 21/12/2018 |
| CC006000000193693 | SANDHYA AND RATNAKAR BEHERA | CCI PROJECTS PVT LTD | 09/08/2020 |
| CC006000000068148 | Adesh Gupta and anr | CCI Projects Private Limited | 19/02/2019 |
| CC006000000078611 | Saurabh Mehrotra | CCI Projects Pvt Ltd | 28/03/2019 |
| CC006000000078815 | Captain Bhaskar Pande | CCI Projects Pvt. Ltd. | 08/04/2019 |
| CC006000000079150 | RAJESH MOTIRAM CHHABRIA | CCI PROJECTS PVT. LTD. | 04/05/2019 |
| CC006000000079241 | Mr. RAJESH MOTIRAM CHHABRIA AND Mrs. NEETA RAJESH CHHABRIA | CCI PROJECTS PVT. LTD. | 11/05/2019 |
| CC006000000079308 | SATYA PRAKASH NATANI | CCI PROJECT PRIVATE LIMITED | 20/05/2019 |
| CC006000000079357 | RACHANA NATANI & SATYA PRAKASH NATANI | CCI PROJECTS PRIVATE LIMITED (erstwhile Entertainment India Private Limited) | 18/05/2019 |
| CC006000000196582 | Dr. Raju Ravindra Bapat | CCI PROJECTS PVT LTD | 01/04/2021 |
| CC006000000196589 | DR. RAJU RAVINDRA BAPAT | CCI PROJECTS PVT LTD | 01/04/2021 |
| CC006000000141144 | Hiten Sampat | CCI Projects Private Limited | 03/10/2019 |
| CC006000000100485 | Rajesh Joshi | CCI Project Private Limited | 11/08/2019 |
| CC006000000110671 | ANJUM ALTAF QAZI | CCI Projects Pvt.Ltd | 09/11/2019 |
| CC006000000110736 | Jatinder Kaur Kohli | CCI Projects Private Limited | 28/08/2019 |
| CC006000000141159 | HARDIK KAMLESH BAROT | CCI PROJECTS PVT. LTD | 09/10/2019 |
| CC006000000151223 | RIVALI PARK WINTER GREEN BUYERS ASSOCIATION | CCI PROJECTS PRIVATE LIMITED | 12/10/2019 |
| CC006000000151225 | Mr. Vignanshanker Mahesh Raval & Mrs. Pinal Vignanshanker Raval | CCI Projects Private Limited | 16/10/2019 |
| CC006000000161239 | Prahalad Ray Mundra | CCI Projects Private Limited | 20/10/2019 |
| CC006000000161358 | Kapil Sharma | CCI Projects Private Limited | 09/11/2019 |
| CC006000000171479 | Sunita Agrawal | CCI projects private limited | 09/11/2019 |
| CC006000000171482 | Dimpy Soni Abhishek Soni | CCI Project P Ltd | 10/11/2019 |
| CC006000000171579 | Sunil Agrawal | CCI Projects Pvt. Ltd. | 18/11/2019 |
| CC006000000171746 | Mr.Dattaram Dhaku Gawade | CCI Projects Pvt. Ltd. | 04/12/2019 |
| CC006000000171760 | UMESH KUMAR VERMA | CCI PROJECTS PVT LTD | 03/12/2019 |
| CC006000000171767 | Vidyesh Wakade | CCI Projects Pvt Ltd | 07/12/2019 |
| CC006000000171771 | Mrs.Shobha Dattaram Gawade | CCI Projects Pvt. Ltd. | 04/12/2019 |
| CC006000000171799 | Prashant Diwakar Mankame | CCI Projects Pvt Ltd | 01/09/2020 |
| CC006000000171839 | Mrs.Asha Sunil Jhaveri | CCi Projects Pvt.Ltd | 30/03/2021 |
| CC006000000171805 | Mohan Vaidyanathan | CCI Projects Pvt. Ltd | 10/12/2019 |
| CC006000000171816 | HEMANT D. KADAM | CCI PROJECTS PVT LTD | 10/12/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Apr 2021
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archetech Certificate.pdf | 3 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - March 2022_compressed.pdf | 3 Aug 2022 |
| Certificates of CA (Form 3)File: RERA CERIFICATE - The Arcade_compressed.pdf | 3 Aug 2022 |
| OtherFile: SDR list-2 Uploaded on RERA_260722.pdf | 27 Jul 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Minutes of the General Body Meeting.pdf | 9 Feb 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: WG Chs Certificate.pdf | 24 Jan 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: WGSocietyHandoverDocson211221.pdf | 24 Jan 2022 |
| OtherFile: Old Society Rejection Orders_1-4 (1).pdf | 24 Jan 2022 |
| OtherFile: Old Society Rejection Orders_5-8 (1).pdf | 24 Jan 2022 |
| OtherFile: Old Society Rejection Orders_9-12 (1).pdf | 24 Jan 2022 |
| OtherFile: Old Society Rejection Orders_13-16 (1).pdf | 24 Jan 2022 |
| OtherFile: Old Society Rejection Orders_17-20 (1).pdf | 24 Jan 2022 |
| OtherFile: Old Society Rejection Orders_21-end (1).pdf | 24 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Wintergreen - Form 5.pdf | 31 Dec 2021 |
| OtherFile: SDR list.pdf | 14 Dec 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Winter Green - Architect Certificate.pdf | 30 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Winter Green - Engineer Certificate.pdf | 30 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - winter green - 31-03-2021.pdf | 28 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD - A, B, C.pdf | 17 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD - D, E, F.pdf | 17 Jun 2021 |
| OtherFile: Form 4 and OC.pdf | 11 May 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: PART Occupation Certificate.pdf | 10 Apr 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2264589_OC_signed.pdf | 8 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER CERTIFICATE DECEMBER 2020 WINTER GREEN-min.pdf | 28 Jan 2021 |
| Certificates of CA (Form 3)File: CA - WINTER GREEN.pdf | 28 Jan 2021 |
| OtherFile: CFO NOC.pdf | 28 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Winter Green-min-compressed.pdf | 27 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Winter Green.pdf | 29 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - Winter Green.pdf | 29 Oct 2020 |
| Certificates of CA (Form 3)File: FORM-3 WINTERGREEN.pdf | 29 Oct 2020 |
| Certificates of CA (Form 5)File: CCIPL Form 5 Wintergreen March 2020.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: CA Certificate WG June2020.pdf | 9 Sep 2020 |
| OtherFile: acknowledgement copy Registrar2882020 WG.pdf | 28 Aug 2020 |
| Copy of the legal title reportFile: Report on Title Kanga and Co17082020 comp.pdf | 21 Aug 2020 |
| Copy of the legal title reportFile: Annexure I 1782020.PDF | 21 Aug 2020 |
| Copy of the legal title reportFile: Annexure IIA1782020Report on Title 52418 sqmtrs.pdf | 21 Aug 2020 |
| Copy of the legal title reportFile: Annexure IIB1782020Report on Title 34900 sqmtrs.pdf | 21 Aug 2020 |
| Copy of the legal title reportFile: Annexure IIC1782020Report on Title3436 sqmtrs.pdf | 21 Aug 2020 |
| Copy of the legal title reportFile: Annexure III1782020.PDF | 21 Aug 2020 |
| Proforma of Allotment letterFile: final composit WG AFS aug 2020.pdf | 21 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate WinterGreen June2020.pdf | 12 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Winter Green June 2020 Comp.pdf | 12 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Winter Green - Mar2020.pdf | 30 Jun 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - Winter Green - March 2020_compressed (1).pdf | 30 Jun 2020 |
| Certificates of CA (Form 3)File: CA Certificate Winter Green.pdf | 30 Jun 2020 |
| Details of Restarting of Construction work post lockdownFile: Email Reply 20th June 2020.pdf | 26 Jun 2020 |
| Certificates of CA (Form 3)File: CA Certificate WG.pdf | 22 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate WG.pdf | 21 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate WG.pdf | 21 Jan 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: A wing.pdf | 17 Jan 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: B Wing.pdf | 17 Jan 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: C Wing.pdf | 17 Jan 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: D Wing.pdf | 17 Jan 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: E Wing.pdf | 17 Jan 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: F Wing.pdf | 17 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Winter Green sept19.pdf | 25 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Winter Green sept19.pdf | 25 Oct 2019 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 WIntergreen sept 2019 PART 1.pdf | 25 Oct 2019 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 WIntergreen sept 2019 PART 2.pdf | 25 Oct 2019 |
| Certificates of CA (Form 5)File: CA Certificate Form 3 WIntergreen sept 2019 PART 1.pdf | 25 Oct 2019 |
| Certificates of CA (Form 5)File: Form 5Wintergreen.pdf | 30 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Winter Green June 2019.pdf | 22 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER CERTIFICATE JUNE 19 WINTERGREEN.pdf | 22 Jul 2019 |
| Certificates of CA (Form 3)File: Wintergreen CA certificate June 2019.pdf | 22 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate WG apr 2019.pdf | 23 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Winter Green.pdf | 23 Apr 2019 |
| Certificates of CA (Form 3)File: Rera WG CA Certificate.pdf | 23 Apr 2019 |
| Certificates of CA (Form 3)File: WG RERA.pdf | 31 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Winter Green Architect certificate Dec 18.pdf | 21 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enigineer Cert Wintergreen December 2018 compressed.pdf | 21 Jan 2019 |
| Certificates of CA (Form 5)File: Form 5 Wintergreen.pdf | 31 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate winter green september 2018 compressed.pdf | 24 Oct 2018 |
| Certificates of CA (Form 3)File: Winter Green 30 sept 2018 CA certificate.pdf | 24 Oct 2018 |
| Proforma of Allotment letterFile: Winter Green Agreement aug18.pdf | 22 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Winter Green June 2018.pdf | 24 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Winter Green June 2018.pdf | 24 Jul 2018 |
| Certificates of CA (Form 3)File: Winter Green CA certificate June 2018 NEW.pdf | 20 Jul 2018 |
| Certificates of CA (Form 3)File: Winergreen part 1 CA certificate March 18.pdf | 24 Apr 2018 |
| Certificates of CA (Form 3)File: Wintergreen part 2 CA certificate March 18.pdf | 24 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Winter Green March 18 compressed.pdf | 23 Apr 2018 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Rivali Park - SkyleapPR1183032501382 | Magathane, Mumbai Suburban | 178 | Nov 2025 | Ongoing | Jul 2032 | Not due yet |
| Rivali Park - MoonriseP51800055489 | CCI Compound, Mumbai Suburban | 354 | Apr 2024 | Ongoing | Jun 2030 | Not due yet |
| Rivali Park - StargazeP51800053578 | CCI Compound, Mumbai Suburban | 198 | Nov 2023 | Ongoing | Oct 2029 | Not due yet |
| Rivali Park - SunburstP51800050351 | CCI Compound, Mumbai Suburban | 277 | Apr 2023 | Ongoing | Aug 2028 | Not due yet |
| The ArcadeP51800018662 | Magathane Telephone Exchange, Mumbai Suburban | 5 | Nov 2018 | Completed | Jun 2025Registered original: Dec 2021 | Feb 2025 |
| Wintergreen | Rivali Park Western Express Highway Borivali East Mumbai 400066 | 708 | - | Completed | Dec 2019 | Late, Apr 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
Keep Wintergreen on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 260 registered projects within 2 km.
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: CCI PROJECTS PRIVATE LIMITED
CCI PROJECTS PRIVATE LIMITED has 8 registrations on MahaRERA, including Whitespring and Wintergreen. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Wintergreen is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Wintergreen?
The registered promoter entity is CCI PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2000PTC128732 and GSTIN 27AABCT4694B1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Wintergreen?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Wintergreen?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Wintergreen?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Wintergreen?
The professionals named in the filing: Architect: Vipul Mistry & Associates; Architect: R Design Architects; Architect: SpaceAge Consultants; Engineer: Madhu Sudhanan M P V; Engineer: Milind Naik; Engineer: Shanghvi and Associates Consultants Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Wintergreen?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback