Wintergreen

By CCI PROJECTS PRIVATE LIMITED

RG-MH-11904 · RERA P51800003067 · Last updated on MahaRERA portal: 3 Aug 2022

Source: official MahaRERA filing

Red flags

  • 326 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
66 of 66Construction stages doneacross 6 buildings; every applicable stage filed complete
326Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

Wintergreen is a Residential / Group Housing project by CCI PROJECTS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003067 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 326 complaints are on record with the regulator.

At a glance

Project

  • NameWintergreen
  • TypeResidential / Group Housing
  • Location
    • Western Express Highway
    • Borivali East
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003067
  • ReraGenie IDRG-MH-11904

Builder

  • NameCCI PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70102MH2000PTC128732
  • GSTIN27AABCT4694B1ZC
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsHiten A Khatau, Rohan Hiten Khatau
  • Other registrations7 more →
  • Completed2 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings6 building records
  • Documents filed122 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wintergreen D WingNA460000
Wintergreen A WingNA460000
Wintergreen B WingNA110000
Wintergreen E WingNA110000
Wintergreen C WingNA150000
Wintergreen F WingNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 3 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

66 of 66 construction stages are filed complete across 6 buildings.

Wintergreen D Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wintergreen A Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wintergreen B Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wintergreen E Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wintergreen C Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wintergreen F Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed1150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,150
Closed/Covered1,150
BuildingClosed/CoveredTotal
Wintergreen D Wing425425
Wintergreen A Wing416416
Wintergreen B Wing5656
Wintergreen E Wing6060
Wintergreen C Wing9595
Wintergreen F Wing9898

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,954 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI75634.39
Proposed, not sanctioned75,534 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManekji Wadia Building Ground Floor nanik Motwani Marg Fort Mumbai

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVipul Mistry & Associates
ArchitectR Design Architects
ArchitectSpaceAge Consultants
EngineerMadhu Sudhanan M P V
EngineerMilind Naik
EngineerShanghvi and Associates Consultants Private Limited
Chartered AccountantS A Sangani & Associates llp
PartnerRole in project
CCI PROJECTS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005227Dec 2019 → Dec 2020

Reason as filed by the promoterThe main lender to the said Project is Indiabulls Housing Finance Limited, who, owing to the liquidity crunch in the NBFC market has stopped funding the project since September, 2018. A sanctioned amount of 50 crores is being withheld from disbursal by Indiabulls Housing Finance Limited Consequentially, as a result of its cash flows drying up, the Promoter has been unable to pay its contractor’s dues and work has halted since.

Litigation declared4

CaseCourtStatus
Lodging 1360/2017Bombay High Courtpending hearing and final disposal
ULP No 18/2017Before the Member of the Industrial Court at Mumbai Court at Mumbaias per final order matter stands disposed as settled and withdrawn
3952/2019National Company Law Tribunal Mumbaias per final order matter stands disposed as settled and withdrawn
325/2020National Company Law Tribunal Mumbaias per final order matter stands disposed as settled and withdrawn

Complaints filed with MahaRERA326

Case no.ComplainantRespondentFiled
CC006000000171567Nagma Khatoon KhanCCI Project Pvt Ltd20/11/2019
CC006000000100522Rajaram SubramaniamCCI Projects Pvt. Ltd.14/08/2019
CC006000000120991Sainath IyerCCI Projects Pvt. Ltd.21/09/2019
CC006000000193723Mr. MARGESH MODI & Mrs. AMI MARGESH MODICCI PROJECTS PRIVATE LIMITED13/08/2020
CC006000000001752Rahul Chandrabhan AroraCCI Project Pvt Ltd22/12/2020
CC006000000012599Rupali and Sunil ZankarCCI Projects PvtLtd29/12/2017
CC006000000171817SATISH WAMAN WAGHCCI PROJECTS PVT.LTD.16/12/2019
CC006000000022900Rashmi Raina and Ramesh SinghCCI Projects Pvt. Ltd.10/11/2019
CC006000000023191Dhiraj AgarwalDhiraj Kumar Agarwal02/02/2018
CC006000000023579Dhiraj Kumar AgarwalCCI Projects Private Limited03/03/2018
CC006000000054855Robin AgarwalC.C.I. Projects Pvt. Ltd.13/06/2018
CC006000000044076Raju Ashar & Ami AsharM/S CCI Projects Pvt. Ltd.13/04/2018
CC006000000044118Rajesh JoshiCCI Projects Private Limited15/04/2018
CC006000000171830Ravindra Shankar SawantCCI Projects Pvt. Ltd.11/12/2019
CC006000000171834Ravindra Shankar SawantCCI Projects Pvt. Ltd.11/12/2019
CC006000000054636RAJESH KUMAR CHAUDHARYCCI PROJECTS PRIVATE LIMITED25/05/2018
CC006000000054777Hemal NaikCCI Projects Pvt Ltd09/06/2018
CC006000000054956POONAM PRADYUMNA PONKSHECCI PROJECTS16/06/2018
CC006000000193854POONAM PRADYUMNA PONKSHECCI PROJECTS28/08/2020
CC006000000055491Mrs. Jyoti K Narang and Mr. Kishor NarangCCI Project Pvt Ltd25/07/2018
CC006000000055723PANKAJ MOHANCCI PROJECTS PRIVATE LIMITED10/08/2018
CC006000000055728SUDHA AGARWALCCI PROJECTS PRIVATE LIMITED10/08/2018
CC006000000056117CCI Projects Pvt. Ltd.Sushil Garg and Rishi Garg07/09/2018
CC006000000056120CCI Projects Pvt. Ltd.Karan Singh Jaitawat07/09/2018
CC006000000056115Sriram KrishnanCCI Projects Private Limited10/09/2018
CC006000000056532Manoj kumarDirector,RIVALI PARK14/10/2018
CC006000000161287Shreyas Mhatre / Sonali MhatreAshutosh Khatawkar / CCI Projects Pvt Ltd27/10/2019
CC006000000161363Dhaval Suhas PatilCCI PROJECTS PRIVATE LIMITED27/10/2019
CC006000000161364Saurabh BhatteCCI PROJECTS PRIVATE LIMITED27/10/2019
CC006000000057389Sandhya and Ratnakar BeheraCCI PROJECT PRIVATE LIMITED21/12/2018
CC006000000193693SANDHYA AND RATNAKAR BEHERACCI PROJECTS PVT LTD09/08/2020
CC006000000068148Adesh Gupta and anrCCI Projects Private Limited19/02/2019
CC006000000078611Saurabh MehrotraCCI Projects Pvt Ltd28/03/2019
CC006000000078815Captain Bhaskar PandeCCI Projects Pvt. Ltd.08/04/2019
CC006000000079150RAJESH MOTIRAM CHHABRIACCI PROJECTS PVT. LTD.04/05/2019
CC006000000079241Mr. RAJESH MOTIRAM CHHABRIA AND Mrs. NEETA RAJESH CHHABRIACCI PROJECTS PVT. LTD.11/05/2019
CC006000000079308SATYA PRAKASH NATANICCI PROJECT PRIVATE LIMITED20/05/2019
CC006000000079357RACHANA NATANI & SATYA PRAKASH NATANICCI PROJECTS PRIVATE LIMITED (erstwhile Entertainment India Private Limited)18/05/2019
CC006000000196582Dr. Raju Ravindra BapatCCI PROJECTS PVT LTD01/04/2021
CC006000000196589DR. RAJU RAVINDRA BAPATCCI PROJECTS PVT LTD01/04/2021
CC006000000141144Hiten SampatCCI Projects Private Limited03/10/2019
CC006000000100485Rajesh JoshiCCI Project Private Limited11/08/2019
CC006000000110671ANJUM ALTAF QAZICCI Projects Pvt.Ltd09/11/2019
CC006000000110736Jatinder Kaur KohliCCI Projects Private Limited28/08/2019
CC006000000141159HARDIK KAMLESH BAROTCCI PROJECTS PVT. LTD09/10/2019
CC006000000151223RIVALI PARK WINTER GREEN BUYERS ASSOCIATIONCCI PROJECTS PRIVATE LIMITED12/10/2019
CC006000000151225Mr. Vignanshanker Mahesh Raval & Mrs. Pinal Vignanshanker RavalCCI Projects Private Limited16/10/2019
CC006000000161239Prahalad Ray MundraCCI Projects Private Limited20/10/2019
CC006000000161358Kapil SharmaCCI Projects Private Limited09/11/2019
CC006000000171479Sunita AgrawalCCI projects private limited09/11/2019
CC006000000171482Dimpy Soni Abhishek SoniCCI Project P Ltd10/11/2019
CC006000000171579Sunil AgrawalCCI Projects Pvt. Ltd.18/11/2019
CC006000000171746Mr.Dattaram Dhaku GawadeCCI Projects Pvt. Ltd.04/12/2019
CC006000000171760UMESH KUMAR VERMACCI PROJECTS PVT LTD03/12/2019
CC006000000171767Vidyesh WakadeCCI Projects Pvt Ltd07/12/2019
CC006000000171771Mrs.Shobha Dattaram GawadeCCI Projects Pvt. Ltd.04/12/2019
CC006000000171799Prashant Diwakar MankameCCI Projects Pvt Ltd01/09/2020
CC006000000171839Mrs.Asha Sunil JhaveriCCi Projects Pvt.Ltd30/03/2021
CC006000000171805Mohan VaidyanathanCCI Projects Pvt. Ltd10/12/2019
CC006000000171816HEMANT D. KADAMCCI PROJECTS PVT LTD10/12/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Apr 2021

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archetech Certificate.pdf3 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - March 2022_compressed.pdf3 Aug 2022
Certificates of CA (Form 3)File: RERA CERIFICATE - The Arcade_compressed.pdf3 Aug 2022
OtherFile: SDR list-2 Uploaded on RERA_260722.pdf27 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Minutes of the General Body Meeting.pdf9 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: WG Chs Certificate.pdf24 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: WGSocietyHandoverDocson211221.pdf24 Jan 2022
OtherFile: Old Society Rejection Orders_1-4 (1).pdf24 Jan 2022
OtherFile: Old Society Rejection Orders_5-8 (1).pdf24 Jan 2022
OtherFile: Old Society Rejection Orders_9-12 (1).pdf24 Jan 2022
OtherFile: Old Society Rejection Orders_13-16 (1).pdf24 Jan 2022
OtherFile: Old Society Rejection Orders_17-20 (1).pdf24 Jan 2022
OtherFile: Old Society Rejection Orders_21-end (1).pdf24 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Wintergreen - Form 5.pdf31 Dec 2021
OtherFile: SDR list.pdf14 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Winter Green - Architect Certificate.pdf30 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Winter Green - Engineer Certificate.pdf30 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - winter green - 31-03-2021.pdf28 Jun 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD - A, B, C.pdf17 Jun 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD - D, E, F.pdf17 Jun 2021
OtherFile: Form 4 and OC.pdf11 May 2021
Architect’s Certificate on Completion of Project (Form 4)File: PART Occupation Certificate.pdf10 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2264589_OC_signed.pdf8 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER CERTIFICATE DECEMBER 2020 WINTER GREEN-min.pdf28 Jan 2021
Certificates of CA (Form 3)File: CA - WINTER GREEN.pdf28 Jan 2021
OtherFile: CFO NOC.pdf28 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Winter Green-min-compressed.pdf27 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Winter Green.pdf29 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - Winter Green.pdf29 Oct 2020
Certificates of CA (Form 3)File: FORM-3 WINTERGREEN.pdf29 Oct 2020
Certificates of CA (Form 5)File: CCIPL Form 5 Wintergreen March 2020.pdf30 Sep 2020
Certificates of CA (Form 3)File: CA Certificate WG June2020.pdf9 Sep 2020
OtherFile: acknowledgement copy Registrar2882020 WG.pdf28 Aug 2020
Copy of the legal title reportFile: Report on Title Kanga and Co17082020 comp.pdf21 Aug 2020
Copy of the legal title reportFile: Annexure I 1782020.PDF21 Aug 2020
Copy of the legal title reportFile: Annexure IIA1782020Report on Title 52418 sqmtrs.pdf21 Aug 2020
Copy of the legal title reportFile: Annexure IIB1782020Report on Title 34900 sqmtrs.pdf21 Aug 2020
Copy of the legal title reportFile: Annexure IIC1782020Report on Title3436 sqmtrs.pdf21 Aug 2020
Copy of the legal title reportFile: Annexure III1782020.PDF21 Aug 2020
Proforma of Allotment letterFile: final composit WG AFS aug 2020.pdf21 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate WinterGreen June2020.pdf12 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Winter Green June 2020 Comp.pdf12 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Winter Green - Mar2020.pdf30 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - Winter Green - March 2020_compressed (1).pdf30 Jun 2020
Certificates of CA (Form 3)File: CA Certificate Winter Green.pdf30 Jun 2020
Details of Restarting of Construction work post lockdownFile: Email Reply 20th June 2020.pdf26 Jun 2020
Certificates of CA (Form 3)File: CA Certificate WG.pdf22 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate WG.pdf21 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate WG.pdf21 Jan 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: A wing.pdf17 Jan 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: B Wing.pdf17 Jan 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: C Wing.pdf17 Jan 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: D Wing.pdf17 Jan 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: E Wing.pdf17 Jan 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: F Wing.pdf17 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Winter Green sept19.pdf25 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Winter Green sept19.pdf25 Oct 2019
Certificates of CA (Form 3)File: CA Certificate Form 3 WIntergreen sept 2019 PART 1.pdf25 Oct 2019
Certificates of CA (Form 3)File: CA Certificate Form 3 WIntergreen sept 2019 PART 2.pdf25 Oct 2019
Certificates of CA (Form 5)File: CA Certificate Form 3 WIntergreen sept 2019 PART 1.pdf25 Oct 2019
Certificates of CA (Form 5)File: Form 5Wintergreen.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Winter Green June 2019.pdf22 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER CERTIFICATE JUNE 19 WINTERGREEN.pdf22 Jul 2019
Certificates of CA (Form 3)File: Wintergreen CA certificate June 2019.pdf22 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate WG apr 2019.pdf23 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Winter Green.pdf23 Apr 2019
Certificates of CA (Form 3)File: Rera WG CA Certificate.pdf23 Apr 2019
Certificates of CA (Form 3)File: WG RERA.pdf31 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Winter Green Architect certificate Dec 18.pdf21 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enigineer Cert Wintergreen December 2018 compressed.pdf21 Jan 2019
Certificates of CA (Form 5)File: Form 5 Wintergreen.pdf31 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate winter green september 2018 compressed.pdf24 Oct 2018
Certificates of CA (Form 3)File: Winter Green 30 sept 2018 CA certificate.pdf24 Oct 2018
Proforma of Allotment letterFile: Winter Green Agreement aug18.pdf22 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Winter Green June 2018.pdf24 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Winter Green June 2018.pdf24 Jul 2018
Certificates of CA (Form 3)File: Winter Green CA certificate June 2018 NEW.pdf20 Jul 2018
Certificates of CA (Form 3)File: Winergreen part 1 CA certificate March 18.pdf24 Apr 2018
Certificates of CA (Form 3)File: Wintergreen part 2 CA certificate March 18.pdf24 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Winter Green March 18 compressed.pdf23 Apr 2018

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Rivali Park - SkyleapPR1183032501382Magathane, Mumbai Suburban178Nov 2025OngoingJul 2032Not due yet
Rivali Park - MoonriseP51800055489CCI Compound, Mumbai Suburban354Apr 2024OngoingJun 2030Not due yet
Rivali Park - StargazeP51800053578CCI Compound, Mumbai Suburban198Nov 2023OngoingOct 2029Not due yet
Rivali Park - SunburstP51800050351CCI Compound, Mumbai Suburban277Apr 2023OngoingAug 2028Not due yet
The ArcadeP51800018662Magathane Telephone Exchange, Mumbai Suburban5Nov 2018CompletedJun 2025Registered original: Dec 2021Feb 2025
WintergreenRivali Park Western Express Highway Borivali East Mumbai 400066708-CompletedDec 2019Late, Apr 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Wintergreen on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali East6,700+ in Mumbai Suburban

2 kmWintergreenCompleted 82Lapsed / revoked 54Other 124Dot size: filed unitsN

Filed coordinates, straight-line distance. 260 registered projects within 2 km.

Builder: CCI PROJECTS PRIVATE LIMITED

CCI PROJECTS PRIVATE LIMITED has 8 registrations on MahaRERA, including Whitespring and Wintergreen. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Wintergreen is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Wintergreen?

The registered promoter entity is CCI PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2000PTC128732 and GSTIN 27AABCT4694B1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Wintergreen?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Wintergreen?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Wintergreen?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Wintergreen?

The professionals named in the filing: Architect: Vipul Mistry & Associates; Architect: R Design Architects; Architect: SpaceAge Consultants; Engineer: Madhu Sudhanan M P V; Engineer: Milind Naik; Engineer: Shanghvi and Associates Consultants Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Wintergreen?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Wintergreen. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Wintergreen to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.