Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Litigation declared, 2 cases
- Completion date moved by 42 months
- 4 extensions taken
Clear
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
The Arcade is a Commercial project by CCI PROJECTS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018662 on 22 Nov 2018. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 42 months from the original filing. 5 of the 5 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameThe Arcade
- TypeCommercial
- Location
- Near Kanakia Samarpan
- Western Express Highway
- Magathane Telephone Exchange
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800018662
- ReraGenie IDRG-MH-96852
Builder
- NameCCI PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU70102MH2000PTC128732
- GSTIN27AABCT4694B1ZC
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsHiten A Khatau, Rohan Hiten Khatau
- Other registrations7 more →
- Completed2 of 8
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Nov 2018
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed104 files
Current status
Figures as on 5 Mar 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| The Arcade | NA | 2 | 1 | 0 | 5 | 5 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
The Arcade: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 5 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| CCI PROJECTS PVT LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R DESIGN ARCHITECTS |
| Architect | Vipul Mistry & Associates |
| Engineer | Shanghvi and Associates Consultants Private Limited |
| Engineer | MILIND NAIK |
| Engineer | Madhu Sudhanan M P V |
| Engineer | Subrat Kumar Bansidhar Pradhan |
| Chartered Accountant | S A Sangani & Associates LLP |
| Chartered Accountant | H Paurana and Associates |
| Partner | Role in project |
|---|---|
| CCI PROJECTS PRIVATE LIMITED | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNo Sale. Hence Extension.
Reason as filed by the promoterThe above named project is a commercial project. We had completed the construction and we are in process of obtaining Occupancy Certificate. We haven’t sold / booked any inventory till date in the said project.
Reason as filed by the promoterThe above named project is a commercial project and we had completed the construction and we are in process of Occupancy Certificate. We haven’t sold / booked any inventory till date.
Reason as filed by the promoterThe real estate project " The Arcade" is a commercial project consisting of only 5 units in total. The construction of the said project is completed in all respect and we are in process of applying for occupancy certificate (O.C.) only recently we sold the said units and informed the allottees about the extension. Hence, we humbly request Ld. Authority to grant extension at the earliest.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| WP/1685/2017 | Bombay High Court | Ongoing |
| ULP No 18/2017 | Before the Member of the Industrial Court at Mumbai Court at Mumbai | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Mar 2025
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCade_OC plan.pdf | 5 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certi_Arcade_170225.pdf | 26 Feb 2025 |
| Proforma of Agreement for saleFile: Arcade AFS to upload.pdf | 22 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certi_Form 1_Arcade_Dec 24.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: CACerti_Form 3_Arcade_Dec 24.PDF | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi_Form 2_Arcade_Dec 24.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Arcade_23-24.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certi_Form 1_Arcade_Sep 24.pdf | 17 Oct 2024 |
| Certificates of CA (Form 3)File: CA Certi_Form 3_Arcade_Sept 24_compressed.pdf | 17 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi_Form2_ARCADE_OCT 24.pdf | 17 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1-Architect Certi_Arcade_300624.pdf | 6 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engg Certi_Arcade_300624.pdf | 6 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3-CA Certi_Arcade_300624_c.pdf | 6 Aug 2024 |
| Declaration in FORM BFile: Form B_compressed.pdf | 27 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: sold booked_Arcade Ext June 25.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance_Arcade_23-24.pdf | 11 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate_Arcade_March 2024.pdf | 7 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Arcade_March 2024.pdf | 7 Jun 2024 |
| Certificates of CA (Form 3)File: CA Certificate_Arcade_March 2024.pdf | 7 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Arcade- 31 Dec 2023.pdf | 31 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Arcade -31 Dec 2023.pdf | 31 Jan 2024 |
| Certificates of CA (Form 3)File: CA Certificate Arcade- 31 Dec 2023.pdf | 31 Jan 2024 |
| Copy of the legal title reportFile: Legal Title Report 290923 Part 1_Rvs.pdf | 24 Nov 2023 |
| Copy of the legal title reportFile: Legal Title Report 290923 Part 2.pdf | 24 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Arcade_300923.pdf | 2 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Arcade_300923.pdf | 2 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual CA Certi Form 5 CCIPL Final.pdf | 2 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3-CA Certificate-Arcade_compressed.pdf | 26 Sep 2023 |
| Declaration in FORM BFile: Affidavit Cum Declartion-Form B.pdf | 29 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Engg Quality Assurance.pdf | 29 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Arcade Form 5 March 2022 Signed.pdf | 29 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Arcade Sold-Booked-060223.pdf | 6 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Final_ARCADE Sold_Booked Inventory_211222.pdf | 28 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: ARCADE Sold_Booked Inventory.pdf | 7 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200231801955_For_Asset_Based_Search_07_03_2022_16_31_21_107.pdf | 7 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Arcade.pdf | 9 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Arcade.pdf | 9 Feb 2022 |
| Certificates of CA (Form 3)File: CA Certificate - Arcade.pdf | 9 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC revalidation.pdf | 7 Feb 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 7 Feb 2022 |
| CERSAI detailsFile: undertaking CRESAI.pdf | 7 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Sold_Booked Inventory.pdf | 7 Feb 2022 |
| OtherFile: Declaration of allottees consent.pdf | 7 Feb 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Arcade - Form 5.pdf | 31 Dec 2021 |
| Certificates of CA (Form 3)File: CA certificate - Arcade_compressed.pdf | 12 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arcade - Architect Certificate.pdf | 30 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arcade - Engineer Certificate.pdf | 30 Oct 2021 |
| Certificates of CA (Form 3)File: CA certificate - Arcade - June 2021.pdf | 4 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Arcade - June 2021.pdf | 3 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Arcade - June 2021.pdf | 3 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - THE ARCADE_RETAIL_31-03-2021.pdf | 25 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering certificate - Arcade-compressed.pdf | 25 Apr 2021 |
| Certificates of CA (Form 3)File: Form 3 Arcade-22-04-2021_compressed.pdf | 25 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - THE ARCADE-min-compressed.pdf | 28 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER CERTIFICATE DECEMBER 2020 RETAIL-min.pdf | 28 Jan 2021 |
| Certificates of CA (Form 3)File: CA - THE ARCADE-min.pdf | 28 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Arcade.pdf | 29 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - The Arcade.pdf | 29 Oct 2020 |
| Certificates of CA (Form 3)File: FORM-3 THE ARCADE.pdf | 29 Oct 2020 |
| Annual Audit Report of Statutory CA (Form 5)File: CCIPL Form 5 Arcade March 2020.pdf | 30 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CCIPL Form 5 Arcade March 2020.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: CA Certificate June 2020 Arcade.pdf | 9 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Arcade June2020.pdf | 12 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Retail June 2020 Comp.pdf | 12 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Arcade - Mar2020.pdf | 30 Jun 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - Arcade - March 2020_compressed.pdf | 30 Jun 2020 |
| Certificates of CA (Form 3)File: CA Certificate Arcade.pdf | 30 Jun 2020 |
| Certificates of CA (Form 3)File: CA Certificate The Arcade.pdf | 22 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Arcade.pdf | 21 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Arcade.pdf | 21 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Arcade sept19.pdf | 25 Oct 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Engineer certificate Arcade sept19.pdf | 25 Oct 2019 |
| Certificates of CA (Form 3)File: FORM 3A ARCADE compressed.pdf | 25 Oct 2019 |
| OtherFile: Affidavit.pdf | 3 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: Form 5 The Arcade.pdf | 30 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate of The arcade June 2019.pdf | 22 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER CERTIFICATE The Arcade 2019.pdf | 22 Jul 2019 |
| Certificates of CA (Form 3)File: The Arcade CA Certificate June 2019.pdf | 22 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Arcade Apr 2019.pdf | 23 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Arcade Retail.pdf | 23 Apr 2019 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Rivali Park - SkyleapPR1183032501382 | Magathane, Mumbai Suburban | 178 | Nov 2025 | Ongoing | Jul 2032 | Not due yet |
| Rivali Park - MoonriseP51800055489 | CCI Compound, Mumbai Suburban | 354 | Apr 2024 | Ongoing | Jun 2030 | Not due yet |
| Rivali Park - StargazeP51800053578 | CCI Compound, Mumbai Suburban | 198 | Nov 2023 | Ongoing | Oct 2029 | Not due yet |
| Rivali Park - SunburstP51800050351 | CCI Compound, Mumbai Suburban | 277 | Apr 2023 | Ongoing | Aug 2028 | Not due yet |
| Wintergreen | Rivali Park Western Express Highway Borivali East Mumbai 400066 | 708 | - | Completed | Dec 2019 | Late, Apr 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep The Arcade on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Magathane Telephone Exchange6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 243 registered projects within 2 km.
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: CCI PROJECTS PRIVATE LIMITED
CCI PROJECTS PRIVATE LIMITED has 8 registrations on MahaRERA, including Whitespring and Wintergreen. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that The Arcade shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if The Arcade is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of The Arcade?
The registered promoter entity is CCI PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2000PTC128732 and GSTIN 27AABCT4694B1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in The Arcade?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for The Arcade?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at The Arcade?
The professionals named in the filing: Architect: R DESIGN ARCHITECTS; Architect: Vipul Mistry & Associates; Engineer: Shanghvi and Associates Consultants Private Limited; Engineer: MILIND NAIK; Engineer: Madhu Sudhanan M P V; Engineer: Subrat Kumar Bansidhar Pradhan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in The Arcade?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback