ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / GREENAIRY

Registered No litigation declared Others project

GREENAIRY

By SAROJ LANDMARK REALTY LLP

RG-MH-76895 · RERA P51800035093 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA
  • Rs 240.00 crore secured on the land, in favour of Piramal Finance Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
194 of 1,052Units unsoldnot recorded sold or booked
8Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

GREENAIRY is a Others project by SAROJ LANDMARK REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800035093 on 10 May 2022. Possession is promised by 30 Jun 2028. 858 of the 1,052 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete. 8 complaints are on record with the regulator.

At a glance

Project

  • NameGREENAIRY
  • TypeOthers
  • Location
    • GANESH NAGAR
    • BORIVALI EAST
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • RERA no.P51800035093
  • ReraGenie IDRG-MH-76895

Builder

  • NameSAROJ LANDMARK REALTY LLP
  • Entity typePartnership
  • Named personSurya Builders and Developers
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2022PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2022
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed93 files

Current status

82%858 of 1,052 units booked

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA685542997526
WING BNA685542997526

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
FITNESS CENTREYes0%

Parking filed680

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots680
Closed/Covered680
BuildingClosed/CoveredTotal
WING A340340
WING B340340

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofPiramal Finance Limited
Secured amountRs 240.00 crore
CERSAI search filedYes
Declared on8 Jan 2026
LandownerVillageDistrict
SAROJ LANDMARK REALTY LLPAndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI85747.0
Proposed, not sanctioned48,853 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHAL SHOPPING CENTER ANDHERI EAST SIR M V ROAD, OPPOSITE GYM KHANA ANDHERI EAST MUMBAI

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectINGRAIN
EngineerGopal Madugula
EngineerChirag Shah
Chartered AccountantV.A.SHIMPI AND ASSOCIATES
Chartered AccountantPIYUSH D ACHARYA AND CO
Chartered AccountantKedia Singhania and Co
PartnerRole in project
SAROJ LANDMARK REALTY LLP-

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000375379Dashrath RajputM/s Surya Builder & Developers24/04/2023
CC006000000397655MRS PRABHA SHARAD PATHAKMESSERS SURYA BUILDERS AND DEVELOPERS THROUGH ITS PROPRIETOR MR RAJEEV KUMAR03/10/2023
CC006000000428846Teena Mukesh ParmarDhanshree Developers15/01/2024
CC006000000550777Saroj Landmark Realty LLPAshok Agarwal13/07/2024
CC006000000590987Saroj Landmark Realty LLPNeeta D Dhakan13/07/2024
CC006000000590988Saroj Landmark Realty LLPTusar Vinayak Kesarkar13/07/2024
CC006000000590989Saroj Landmark Realty LLPVarun Agarwal13/07/2024
CC12503881Saroj Landmark Realty LLPMANISHA LAXMINARAYAN KHETAN05/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Greenairy - Form 1.pdf25 Apr 2026
Form 2File: Form-2 -Greenairy.pdf25 Apr 2026
Form 3File: Form 3-March 2026.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold-Greenairy -31032026.pdf25 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A-Greenairy-2025-26.pdf24 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A- Engineer Certificate- Saroj Landmark Realty.pdf6 Mar 2026
Form 1File: Form 1-Greenairy-31-12-2025.pdf14 Jan 2026
Form 2File: Form 2 Greenairy Project-Dec 25.pdf14 Jan 2026
Disclosure of Sold and Booked InventoryFile: Greenairy-sold-unsold-31-12-2025.pdf14 Jan 2026
Form 3File: Greenairy Form 3-31-12-2025.pdf14 Jan 2026
Form 5 (FY 2024-2025)File: Greenairy Form 5 FY 2024-25.pdf2 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 Greenariy FY 2023-24.pdf25 Dec 2025
Form 1File: Greenairy-Form 1.pdf17 Oct 2025
Form 2File: Greenairy-Form 3-30092025.pdf17 Oct 2025
Form 3File: Greenairy-Form 3-30092025.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Greenairy-sold and unsold-30092025.pdf17 Oct 2025
Form 1File: Form-1 Greenairy 30062025.pdf20 Jul 2025
Form 2File: Form-2 Greenairy 30062025.pdf20 Jul 2025
Form 3File: Form 3 Greenairy June 2025 Final.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Greenairy.pdf20 Jul 2025
Form 1File: Form 1.pdf9 Jun 2025
Form 2File: Form-2 Greenairy.pdf9 Jun 2025
Form 3File: Form 3 Greenairy Mar 2025.pdf9 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold-31032025.pdf9 Jun 2025
Self-declaration of Quarterly ProgressFile: Form 1.pdf9 Jun 2025
Disclosure of sold/ booked inventoryFile: Greenairy-sold unsold-31122024.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-Magathane-31122024.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Greenairy -31122024.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Greenairy-Sold Unsold-30062024.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: Greenairy-Sold Unsold-30092024.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-30062024.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-30092024.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised-Form 2-Greenairy-30062024.pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised-Form 2-Greenairy-30092024.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Greenairy Sep 2024 Final.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Greenairy June 2024 Final.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Greenairy 30062024.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Greenairy 30092024.pdf19 Dec 2024
Declaration in FORM BFile: Form - B - Affidavit of Saroj Landmark Realty LLP.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Greenairy.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 GReenairy.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Greenairy march 24.pdf21 Nov 2024
Copy of the legal title reportFile: Greenairy-RERA Title Certificate- 06022024.pdf21 Nov 2024
Copy of the legal title reportFile: Greenairy-RERA Title Certificate- 06022024.pdf21 Nov 2024
Declaration in FORM BFile: Form - B - Affidavit of Saroj Landmark Realty LLP.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Greenairy.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Greenairy march 24.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 GReenairy.pdf21 Nov 2024
PAN CardFile: Saroj Landmark LLP Pan Card.pdf11 Oct 2024
Proforma of Agreement for saleFile: Saroj Greenairy AFS Balcony Amenities (27032024) Clean draft 280324.pdf10 May 2024
Building plan approvalFile: Amended IOA 21 Feb 2024-1.pdf8 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA 21 Feb 2024-1.pdf8 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Greenairy 31032024.pdf8 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - FY 2022-23.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Greenairy Dec 23.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Greenairy Dec 23.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold Greenairy.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Greenairy Dec 23.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Greenairy Sep-23.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Greenairy Mar-23.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Greenairy Jun-23.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Greenairy Sep-23.pdf25 Nov 2023
Details of encumbrances concerned to FinanceFile: Greenairy Encumbrance Certificate-Legal.pdf1 Nov 2023
Details of encumbrances concerned to LegalFile: Greenairy Encumbrance Certificate-Legal.pdf1 Nov 2023
Proforma of Agreement for saleFile: Greenairy Final_Clean_RERA UPLOAD AFS-.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Surya March 23.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Surya June 23.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 Surya March 23.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 Surya June 23.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SBD - Form 2A -Sept 2023.pdf14 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Greenairy Dec-22.pdf6 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Greenairy Wing A B Architect Certificate upto 31st December 2022.pdf2 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GREENAIRY.pdf2 Jun 2023
Building plan approvalFile: LOI_ganesh nagar.pdf6 May 2022
Copy of the legal title reportFile: RERA Title Certificate.pdf6 May 2022
Building Plan Approval / NA Order for plotted developmentFile: LOI_ganesh nagar.pdf6 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate with sign_compressed.pdf5 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200236204036_For_Asset_Based_Search_28_04_2022_17_02_00_611.pdf29 Apr 2022
OtherFile: Additional Declaration -Surya_compressed.pdf26 Apr 2022
Layout approvalFile: IOA_PLAN_SURYA_compressed.pdf19 Apr 2022

How this compares with Mumbai Suburban

82%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GREENAIRY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI EAST6,700+ in Mumbai Suburban

Builder: SAROJ LANDMARK REALTY LLP

SAROJ LANDMARK REALTY LLP has 3 registrations on MahaRERA, including CHANDAK STELLA and UNICORN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GREENAIRY is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GREENAIRY?

The registered promoter entity is SAROJ LANDMARK REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GREENAIRY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GREENAIRY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GREENAIRY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GREENAIRY?

The professionals named in the filing: Architect: INGRAIN; Engineer: Gopal Madugula; Engineer: Chirag Shah; Chartered Accountant: V.A.SHIMPI AND ASSOCIATES; Chartered Accountant: PIYUSH D ACHARYA AND CO; Chartered Accountant: Kedia Singhania and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GREENAIRY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GREENAIRY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GREENAIRY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.