Rivali Park - Sunburst
By CCI PROJECTS PRIVATE LIMITED
RG-MH-86825 · RERA P51800050351 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 550.00 crore secured on the land, in favour of Vistra ITCL (India) Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Rivali Park - Sunburst is a Residential / Group Housing project by CCI PROJECTS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050351 on 5 Apr 2023. Possession is promised by 31 Aug 2028. 259 of the 277 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameRivali Park - Sunburst
- TypeResidential / Group Housing
- Location
- Western Express Highway
- CCI Compound
- Magathane
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800050351
- ReraGenie IDRG-MH-86825
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2023
- Promised completion31 Aug 2028
- Revised completionNone
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sunburst - Tower 1 as per approved plan | NA | 48 | 38 | 277 | 0 | 277 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 55%.
Sunburst - Tower 1 as per approved plan: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed305
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sunburst - Tower 1 as per approved plan | NA | Rs 157.42 cr | Rs 141.90 cr |
| - | NA | Rs 38.27 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vipulkumar Natwarlal Mistry |
| Engineer | SUBRAT KUMAR BANSIDHAR PRADHAN |
| Chartered Accountant | H Paurana and Associates |
| Chartered Accountant | Sorab S. Engineer & Co. |
| Partner | Role in project |
|---|---|
| CCI PROJECTS PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Aug 2028
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A-Sunburst-FY25-26.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: Form I_AC_Sunburst_Mar26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: Form II_EC_Sunburst Mar26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: Form III_CA_Sunburst Mar26 Comp.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1-AC-Sunburst.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2-EC-Sunburst.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3-Sunburst_Comp.pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: Form 1-AC Sunburst Sep 25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: Form 2-EC Sunburst Sep 25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: Form 3-CA Sunburst Sept25.pdf | 29 Oct 2025 |
| Form 5 (FY 2024-2025)File: Final_Sunburst_Form 5_24-25.pdf | 10 Oct 2025 |
| Form 5 (FY 2023-2024)File: Form 5_Sunburst_23-24.pdf | 24 Sep 2025 |
| Withdrawal Update Form 1File: Form 1-ARCH CERTI- SUNBURST JUN 25.pdf | 24 Jul 2025 |
| Withdrawal Update Form 2File: Form 2-ENGG CERTI SUNBURST JUN 25.pdf | 24 Jul 2025 |
| Withdrawal Update Form 3File: Form 3_CA CERTI-Sunburst-JUN 25-Compressed.pdf | 24 Jul 2025 |
| Form 2A (FY 2024-2025) | 25 Jun 2025 |
| Form 1File: Architect's Certificate-Sunburst.pdf | 21 May 2025 |
| Form 2File: Engineer's Certificate -Sunburst.pdf | 21 May 2025 |
| Form 3File: Form 3 Sunburst_compressed.pdf | 21 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate-Sunburst.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sunburst_compressed.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate -Sunburst.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certi_Form 1_Sunburst_Dec 24.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACerti_Form 3_Sunburst_Dec 24.PDF | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certi_Form 2_Sunburst_Dec 24.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Sunburst_23-24.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certi_Form 1_Sunburst_Sep 24.pdf | 17 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certi_Form 3_Sunburst_Sept 24_compressed.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certi_Form2_SUNBURST_OCT 24.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certi_Sunburst_300624.pdf | 6 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engg Certi_Sunburst_300624.pdf | 6 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certi_Sunburst_300624_c.pdf | 6 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_Sunburst_March 2024.pdf | 12 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Sunburst_March 2024.pdf | 12 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance_Sunburst_23-24.pdf | 12 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Sunburst_March 2024.pdf | 12 Jun 2024 |
| Other - TechnicalFile: Intimation Inst Facility MCGM_Sunburst Final.pdf | 11 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC upto 39 floors_221223.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Sunburst - 31 Dec 2023.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Sunbrust-31 Dec 2023.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sunburst- 31 Dec 2023_compressed.pdf | 31 Jan 2024 |
| Copy of the legal title reportFile: Legal Title Report 290923 Part 1_Rvs.pdf | 27 Nov 2023 |
| Copy of the legal title reportFile: Legal Title Report 290923 Part 2.pdf | 27 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Sunburst 30092023.pdf | 4 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunburst 30092023.pdf | 30 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Sunburst 30092023.pdf | 30 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sunburst 30092023 compressed.pdf | 30 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Architects Certificate-July 2023.pdf | 23 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Engineers Certificate-July 2023.pdf | 23 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3CA Certificate-July 2023_compressed.pdf | 23 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate_17-2-23_Form 1.pdf | 2 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate 17-2-23_Form 2.pdf | 2 Jun 2023 |
| Other - TechnicalFile: NEW Additional Disclosure with PLP.pdf | 2 Jun 2023 |
| Other - LegalFile: Rera Letter.pdf | 29 Mar 2023 |
| Other - LegalFile: POA.pdf | 29 Mar 2023 |
| Other - LegalFile: Agreement.pdf | 29 Mar 2023 |
| Building plan approvalFile: 1.pdf | 9 Mar 2023 |
| Building plan approvalFile: 2.pdf | 9 Mar 2023 |
| Building plan approvalFile: 3.pdf | 9 Mar 2023 |
| Building plan approvalFile: 4.pdf | 9 Mar 2023 |
| Building plan approvalFile: 5.pdf | 9 Mar 2023 |
| Building plan approvalFile: 6.pdf | 9 Mar 2023 |
| Building plan approvalFile: 7.pdf | 9 Mar 2023 |
| Building plan approvalFile: 8.pdf | 9 Mar 2023 |
| Building plan approvalFile: 9.pdf | 9 Mar 2023 |
| Building plan approvalFile: 10.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 8.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 9.pdf | 9 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 10.pdf | 9 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 9 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure RHK.pdf | 9 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure HAK.pdf | 9 Mar 2023 |
| Proforma of Agreement for saleFile: RERA AFS.pdf | 9 Mar 2023 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Rivali Park - SkyleapPR1183032501382 | Magathane, Mumbai Suburban | 178 | Nov 2025 | Ongoing | Jul 2032 | Not due yet |
| Rivali Park - MoonriseP51800055489 | CCI Compound, Mumbai Suburban | 354 | Apr 2024 | Ongoing | Jun 2030 | Not due yet |
| Rivali Park - StargazeP51800053578 | CCI Compound, Mumbai Suburban | 198 | Nov 2023 | Ongoing | Oct 2029 | Not due yet |
| The ArcadeP51800018662 | Magathane Telephone Exchange, Mumbai Suburban | 5 | Nov 2018 | Completed | Jun 2025Registered original: Dec 2021 | Feb 2025 |
| Wintergreen | Rivali Park Western Express Highway Borivali East Mumbai 400066 | 708 | - | Completed | Dec 2019 | Late, Apr 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Rivali Park - Sunburst on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CCI Compound6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 298 registered projects within 2 km.
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: CCI PROJECTS PRIVATE LIMITED
CCI PROJECTS PRIVATE LIMITED has 8 registrations on MahaRERA, including Whitespring and Wintergreen. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Rivali Park - Sunburst is delayed beyond 31 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Rivali Park - Sunburst?
The registered promoter entity is CCI PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2000PTC128732 and GSTIN 27AABCT4694B1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Rivali Park - Sunburst?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Rivali Park - Sunburst?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Rivali Park - Sunburst?
The professionals named in the filing: Architect: Vipulkumar Natwarlal Mistry; Engineer: SUBRAT KUMAR BANSIDHAR PRADHAN; Chartered Accountant: H Paurana and Associates; Chartered Accountant: Sorab S. Engineer & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Rivali Park - Sunburst?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.