Home / Browse projects / Thane, Maharashtra / Violet G, H and I

Completed No litigation declared Residential / Group Housing project

Violet G, H and I

By LODHA DEVELOPERS LIMITED

RG-MH-78583 · RERA P51700033960 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 178 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2026Possession promisedregistration recorded completed
15 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 90%
124 of 385Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Violet G, H and I is a Residential / Group Housing project by LODHA DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700033960 on 14 Mar 2022. The registration is recorded completed; possession was promised by 30 Apr 2026. 261 of the 385 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameViolet G, H and I
  • TypeResidential / Group Housing
  • Location
    • Kalyan Shilphata Road
    • Taloja
    • Khoni
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700033960
  • ReraGenie IDRG-MH-78583

Builder

  • NameLODHA DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonsRAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA, RAJENDRA LODHA
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredMar 2022PromisedApr 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Mar 2022
  • Promised completion30 Apr 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed104 files

Current status

68%261 of 385 units booked
80.9%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Violet GNA13131400140
Violet HNA13131390139
Violet INA13131060106

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Violet G82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Violet H39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Violet I29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes65%
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes65%
Landscaping & Tree PlantingYes65%
Street LightingYes65%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes65%
Solid Waste Management And DisposalYes65%
Water conservation /Rain water harvestingYes65%
Energy managemcntYes65%
Fire protection and fire safety requirementsYes65%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceYes65%
Open ParkingYes65%

Parking filed389

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots389
Closed/Covered389
BuildingClosed/CoveredTotal
Violet G144144
Violet H139139
Violet I106106

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,642 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Apr 2026

Approvals and building plan

Sanctioning authorityDirectorate of Town Planning & Valuation, Thane
Permissible FSI15483.57
Proposed, not sanctioned15,484 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort
Estimated costRs 92.26 cr
Cost incurredRs 74.65 cr
Work done80.91%
BuildingWingEstimatedIncurred
-NARs 32.29 crRs 26.13 cr
Violet HNARs 19.99 crRs 16.17 cr
Violet INARs 19.99 crRs 16.17 cr
Violet GNARs 19.99 crRs 16.17 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectPradeep Kamble
EngineerK C Shah Consultants
EngineerFrancis Jose
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A & Associates
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Dec 2024

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 -Violet GHI - P51700033960 -Mar26.pdf2 Jul 2026
Withdrawal Update Form 2File: Violet GHI Mar 2026 - Form 02 Signed.pdf2 Jul 2026
Withdrawal Update Form 3File: Form 3 - Violet G, H and I - P51700033960 - March 24.pdf2 Jul 2026
Form 2A (FY 2025-2026)File: Violet G H and I - P51700033960 - Form 2A.pdf2 Jul 2026
Occupational CertificateFile: Violet G H I all Full OCs_compressed.pdf2 Jul 2026
Withdrawal Update Form 1File: Form1 -Violet GHI - P51700033960 -Mar26.pdf27 Apr 2026
Withdrawal Update Form 2File: Violet GHI Mar 2026 - Form 02 Signed.pdf27 Apr 2026
Withdrawal Update Form 3File: Violet GHI Mar 2026 - Form 03 Signed.pdf27 Apr 2026
Layout approvalFile: Layout G.pdf3 Apr 2026
Building plan approvalFile: 2024 06 21 - Palava 2 - OC Sector I 2 O( Sheet No - 02) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2024 06 21 - Palava 2 - OC Sector I 2 O( Sheet No - 03) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2024 12 30 - Palava 2 - OC -24 - Sec - D I 2 O (Sheet No - 03) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2024 12 30 - Palava 2 - OC -24 - Sec - D I 2 O (Sheet No - 04) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2024 12 30 - Palava 2 - OC -24 - Sec - D I 2 O (Sheet No - 05) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2024 12 30 - Palava 2 - OC -24 - Sec - D I 2 O (Sheet No - 06) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -24) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -25) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -26) - Compress.pdf3 Apr 2026
Building plan approvalFile: 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -27) - Compress.pdf3 Apr 2026
Withdrawal Update Form 1File: Form-1 Violet GHI Dec-25.pdf3 Apr 2026
Withdrawal Update Form 2File: Violet GHI Form 02 Signed Dec 25.pdf3 Apr 2026
Withdrawal Update Form 3File: Form 3 - Violet G, H and I - P51700033960 - March 24.pdf3 Apr 2026
Form 1File: Form-1 Violet GHI Dec-25.pdf27 Jan 2026
Form 2File: Violet GHI Form 02 Signed Dec 25.pdf27 Jan 2026
Form 3File: Violet GHI Form 03 Signed Dec 25.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Violet GHI Sold Unsold Signed Dec 25.pdf27 Jan 2026
Form 1File: Form 1-Violet G, H& I -Sep 25.pdf31 Oct 2025
Form 2File: Form 02 - Violet GHI - Sep 25 signed.pdf31 Oct 2025
Form 3File: Form 03 - Violet GHI - Sep 25 signed.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - Violet GHI - Sep 25 signed.pdf31 Oct 2025
Form 5 (FY 2024-2025)File: Violet G H I.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: Violet G, H and I - P51700033960 - Form 2A.pdf25 Jul 2025
Form 1File: Violet G H I - Form1 - June 25 - P51700033960-okk.pdf18 Jul 2025
Form 2File: Form 2 - Violet GHI - June-25.pdf18 Jul 2025
Form 3File: Form 3_ Violet GHI_June-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Violet G, H and I Sold Unsold - June-25.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: CC Updated.pdf18 Jul 2025
OthersFile: Layout Violet - Cluster 10 01Wing G H I.pdf18 Jul 2025
Form 1File: Form 1 -Violet GHI - March 25.pdf20 Jun 2025
Form 2File: Signed Form 2 Violet G, H and I March 2025.pdf20 Jun 2025
Form 3File: Signed Form 3 Violet G, H and I March 2025.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Signed Sold-Unsold_Violet G, H and I March 2025.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (VioletGHI).pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Violet GHI Dec 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Violet GHI Dec 2024.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold_Violet G, H and I Dec 2024.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Violet G H I.pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Violet G - OC - 2293.pdf31 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Violet H - Full OC.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Violet GHI Sep 2024.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Violet GHI Sep 2024.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Signed Sold Unsold Violet GHI Sep 2024.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Violet G H I.pdf4 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700033960 - Violet G, H and I.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Violet G, H and I - P51700033960.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Violet G, H and I - P51700033960 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Violet G, H and I - P51700033960 - June24.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Violet G, H and I - P51700033960 - March 24.pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Violet G, H and I - P51700033960 - March 24.pdf17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Violet GHI- Mar-24.pdf17 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Violet G, H and I - P51700033960 - March 24.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form2 - Violet G H I - March 24 - P51700033960.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Violet G, H and I - P51700033960 - Dec23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Violet G, H and I - P51700033960 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Violet G, H and I - P51700033960.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Violet G H I - Form1 - Sep23.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Violet G, H and I.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Violet g,H,I.pdf31 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Violet G, H and I.pdf7 Dec 2022
Details of encumbrancesFile: Voilet GHI.pdf1 Dec 2022
CERSAI detailsFile: Cersai Report SI ID.pdf21 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 127 Violet G, H and I.pdf14 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 128 Violet G, H and I.pdf13 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Violet G, H and I.pdf13 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 128 Violet G, H and I.pdf30 Jun 2022
Building plan approvalFile: Sheet 15 OC.pdf29 Jun 2022
Building plan approvalFile: Sheet 16 OC.pdf29 Jun 2022
Building plan approvalFile: Sheet 17 OC.pdf29 Jun 2022
Building plan approvalFile: Sheet 18 OC.pdf29 Jun 2022
Building plan approvalFile: Sheet 19 OC.pdf29 Jun 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LODHA PARKP51900001339.2,210Jul 2017CompletedDec 2023Registered original: Dec 2021Feb 2022

How this compares with Thane

68%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Violet G, H and I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Taloja7,600+ in Thane

Builder: LODHA DEVELOPERS LIMITED

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Violet G, H and I is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Violet G, H and I?

The registered promoter entity is LODHA DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Violet G, H and I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Violet G, H and I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Violet G, H and I?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: Pradeep Kamble; Engineer: K C Shah Consultants; Engineer: Francis Jose; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Violet G, H and I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Violet G, H and I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Violet G, H and I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.