Home / Browse projects / LODHA PARK
LODHA PARK
By MACROTECH DEVELOPERS LIMITED
RG-MH-11852 · RERA P51900001339 · Last updated on MahaRERA portal: 14 Jun 2024
Source: official MahaRERA filing
Red flags
- 67 complaints at MahaRERA
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LODHA PARK is a Residential / Group Housing project by MACROTECH DEVELOPERS LIMITED in ., 400013, registered with MahaRERA as P51900001339 on 27 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. The completion date has moved by 24 months from the original filing. 67 complaints are on record with the regulator.
At a glance
Project
- NameLODHA PARK
- TypeResidential / Group Housing
- Location
- .
- 400013
- Pincode400013
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900001339
- ReraGenie IDRG-MH-11852
Builder
- NameMACROTECH DEVELOPERS LIMITED
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- ChairpersonsRAJENDRA NARPATMAL LODHA, RAJENDRA NARPATMAL LODHA
- Other registrations140 more →
- Completed126 of 141
- No longer live13 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Jul 2017
- Promised completion30 Dec 2023
- Revised completionRevised to 30 Dec 2023 (originally 31 Dec 2021)
- Buildings1 building record
- Documents filed181 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING 1 TO 5 | NA | 88 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.
WING 1 TO 5: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 14 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 97% |
| Water Supply | Yes | 85% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 97% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 75% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 65% |
| Energy managemcnt | Yes | 65% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 75% |
| Closed Parkings | Yes | 75% |
Parking filed4389
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| LODHA DEVELOPERS LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterReasons as mentioned in the attached self certified copy.
Complaints filed with MahaRERA67
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000078496 | Kandar Parikh | Lodha Developers Limited | 15/03/2019 |
| CC006000000089625 | Katmandu Apparel Private Limited | Lodha Developers Limited | 08/06/2019 |
| CC006000000210229 | JOLLY MATHUR | MACROTECH DEVELOPERS LTD | 02/03/2022 |
| CC006000000001533 | Kishor P. Gada | Jawala Real Estate Pvt. Ltd. through its director Ramanandam Omprakash Pandey | 30/10/2017 |
| CC006000000022876 | Rajesh Padmasing Solanki | Jawala Real Estate Private Limited (Lodha Developers Private Limited) | 16/01/2018 |
| CC006000000055262 | Abhishek Gupta | Lodha DEveloper | 09/08/2018 |
| CC006000000057054 | Parikshit Ravindra Kshirsagar | Lodha Developers | 30/11/2018 |
| CC006000000078294 | TW Buildwell Pvt. Ltd. | Lodha Developers Pvt. Ltd. | 07/03/2019 |
| CC006000000058028 | Mr. Satish Dhondulal Parakh HUF | M/s. Jawala Real Estate Pvt Ltd (Lodha Developers) | 11/02/2019 |
| CC006000000058029 | Mrs. Asha Ashok Katariya | M/s. Jawala Real Estate Pvt Ltd | 12/02/2019 |
| CC006000000182065 | HEMANG JAGDISH ENGINEER | MACROTECH DEVELOPERS LTD | 09/01/2020 |
| CC006000000090182 | Irving Fred Desousa | Lodha Developers Limited | 17/07/2019 |
| CC006000000089763 | ANUBHAV JAIN | M/s Jawala Real Estate Pvt.Ltd. ( Lodha Developers Pvt.Ltd.) | 21/06/2019 |
| CC006000000195903 | ANUBHAV JAIN | Jawala Real Estate Pvt. Ltd. ( Lodha Developers Pvt Ltd. | 11/02/2021 |
| CC006000000100425 | BHAGWAN H CHANDNANI | MACROTECH DEVELOPERS LIMITED | 05/08/2019 |
| CC006000000193952 | Arvind Subramanian | Macrotech Developers Limited | 09/09/2020 |
| CC006000000100470 | Pratap Singh Bohra | Macrotech Developers Limited | 13/08/2019 |
| CC006000000100571 | Mrs. Krishna Deepak Wadhwani and Deepak Gobindram Wadhwani | Macrotech DevelopersLimited | 25/11/2019 |
| CC006000000110906 | Bhavesh Bafna | Macrotech Developers pvt ltd | 15/09/2019 |
| CC006000000120942 | SUDATTA PATIL | JAWALA REAL ESTATE PVT LTD | 18/09/2019 |
| CC006000000141146 | Ms. Shelly Agarwal | Jawala Real Estate Private Ltd. | 03/10/2019 |
| CC006000000141065 | Macrotech Developers Limited | Anita Hemraj Bora | 30/09/2019 |
| CC006000000141148 | SAURABH JAIN | MACROTECH DEVELOPERS PVT.LTD. ( LODHA DEVELOPERS PVT.LTD.) | 03/10/2019 |
| CC006000000171846 | Anita Hemraj Bora | Jawala Real Estate Private Limited | 13/12/2019 |
| CC006000000171886 | Shiv Autoriders Private LImited | MACRTOTECH DEVELOPERS PRIVATE LIMITED (JAWALA REAL ESTATE PRIVATE LIMITED) | 26/12/2019 |
| CC006000000192733 | Leela Buildcon & Infrastructure | Macrotech Developers Limited | 27/02/2020 |
| CC006000000192757 | Mr. Sunil Sood | Macrotech Developers Limited | 20/06/2020 |
| CC006000000193555 | Mr. Anirudh Lal & Mrs. Shailly Anirudh Lal | Macrotech Developers Limited | 24/07/2020 |
| CC006000000192966 | MANJUSHA SUHAS NIRGUDKAR | MACROTECH DEVELOPERS LIMITED | 12/09/2020 |
| CC006000000193296 | Ratan Kumar Kandoi | Jawala Real Estate Pvt. Ltd. | 16/06/2020 |
| CC006000000196547 | Savitri Devi Chowdhary | Macmotech Developers Limited | 30/03/2021 |
| CC006000000193337 | Bhavesh Bafna | Messers Macrotech Developers Ltd | 24/06/2020 |
| CC006000000193739 | Komalkant F Sharma | Macrotech Developers Limited | 16/08/2020 |
| CC006000000193791 | A Infrastructure Limited | Macrotech Developers Limited | 21/08/2020 |
| CC006000000193793 | A Infrastructure Limited | Macrotech Developers Limited | 21/08/2020 |
| CC006000000193830 | Ramakant V Pai | Macrotech Developers Limited | 01/09/2020 |
| CC006000000194865 | Axis Electrical Components (India) Pvt Ltd | Jawala Real Estate Pvt Ltd | 19/11/2020 |
| CC006000000195082 | Varshit Dinesh Jain, Dinesh M Jain and Hemlata D Jain | Macrotech Developers Limited | 01/12/2020 |
| CC006000000195676 | MANISHA TULSIANI | MACROTECH DEVELOPERS LIMITED | 18/01/2021 |
| CC006000000198232 | M/S VSK DISTRIBUTORS PRIVATE LTD | M/S MICROTECH DEVELOPERSLIMITED | 04/09/2021 |
| CC006000000195884 | Mahendra Kalyanji Ghelani And Mina Mahendra Ghelani | Macrotech Developers Pvt Ltd (formerly known as Jawala Real Estates Pvt. Ltd) | 05/02/2021 |
| CC006000000196082 | Ghamsham Lalwani andMeher Lalwani | Macrotech Developers Lts | 17/02/2021 |
| CC006000000196605 | Pankaj C Jhaveri and Jesal P Jhaveri | Macrotech Developers Ltd | 03/04/2021 |
| CC006000000196921 | Morries Realtors LLP (formerly Known as Morries Realtors Private Limited) | Macrotech Developers Limited | 10/05/2021 |
| CC006000000196932 | SURESH M RAMCHANDANI | LODHA DEVELOPERS | 08/05/2021 |
| CC006000000197476 | Mrs. Surekha Boda | Macrotech Developers Limited | 03/07/2021 |
| CC006000000197477 | Mugatlal Bhagwandas Boda and Co. Pvt. Ltd. | Macrotech Developers Limited | 03/07/2021 |
| CC006000000198490 | Vibha Ashokkumar Borkar | Macrotech Developers Ltd. | 28/09/2021 |
| CC006000000198698 | Amitava Majumdar | Macrotech Developers Limited | 18/10/2021 |
| CC006000000198960 | Sasikumar Katamreddy | MocrotechDevelopersLimited | 08/11/2021 |
| CC006000000199107 | Avish Tekwani and Vivish Tekwani | Macrotech Developers Ltd | 22/11/2021 |
| CC006000000209997 | Bharat Kheria and Suresh Kumar Kheria | Macrotech Developers Ltd. | 11/02/2022 |
| CC006000000220668 | Rasseek Jivraj Hariya | Macrotech Developers Limited | 02/04/2022 |
| CC006000000251556 | Divyakumar Sunilkumar Siraslewala | MACROTECH DEVELOPERS LIMITED | 27/06/2022 |
| CC006000000292442 | HEMANSHU CHOKHANI | M/S. MACROTECH DEVELOPERS LIMITED | 24/08/2022 |
| CC006000000292456 | SUNIL SHARMA | Macrotech Developers Ltd | 25/08/2022 |
| CC006000000303036 | ADVANCED MANAGEMENT SYSTEM P. LTD. | Macrotech Developers Limited | 17/10/2022 |
| CC006000000375212 | RONAKALI S DHOLKAWALA RONAK ROCKS PRIVATE LIMITED | MACROTECH DEVELOPERS LIMITED | 10/04/2023 |
| CC006000000396407 | Allied Financial Services Pvt Ltd | Macrotech Developers Limited | 26/06/2023 |
| CC006000000396431 | Allied Financial Services Pvt Ltd | Macrotech Developers Limited | 05/07/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jun 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Jul 2022
Documents filed181
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 181 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: LODHA PARK - P51900001339 - March 24.pdf | 14 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: LODHA Park - P51900001339 Dec 23.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Lodha Park - P51900001339 - Sep23.pdf | 27 Dec 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Allura.pdf | 13 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Marquise.pdf | 13 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Parkside.pdf | 13 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Soicety Registration Certificate-Trump Tower.pdf | 13 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 16 LODHA PARK.pdf | 14 Nov 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Lodha Park.pdf | 23 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Lodha Adrina.pdf | 3 Aug 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20190520 OC Wing 1,2,3- till 42nd fl.pdf | 25 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20190613 MTM OC Wing 1,2,3- from 43rd to 62nd fl.pdf | 25 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20190722- MTM -Part OC Letter of wing 1,2,3.pdf | 25 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20210921 Kiara 7th to 42nd and Parkside full OC 64th.pdf | 25 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20211215 OC Kiara (43 to 58 pt and 59 to 66).pdf | 25 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1.pdf | 25 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2.pdf | 25 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3.pdf | 25 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4.pdf | 25 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: LODHA PARK_compressed.pdf | 27 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 67 THE PARK.pdf | 17 Dec 2021 |
| Certificates of CA (Form 3)File: 16 LODHA PARK.pdf | 15 Dec 2021 |
| Form 2AFile: 113 THE PARK.pdf | 18 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 67 THE PARK.pdf | 3 Nov 2021 |
| Certificates of CA (Form 3)File: THE PARK - T1 to T5, RETAIL.pdf | 3 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 63_Lodha Park.pdf | 15 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: P51900001339_New.pdf | 15 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 110 THE PARK - T1 to T5, RETAIL.pdf | 15 Oct 2021 |
| Details of encumbrancesFile: The Park.pdf | 22 Sep 2021 |
| Details of encumbrancesFile: The Park.pdf | 16 Sep 2021 |
| Form 2AFile: Form 2ALodha Park-Santosh Gaikwad-4.pdf | 12 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 129 The Park T1 to T5 Retail.pdf | 27 Oct 2020 |
| Form 2AFile: The Park.pdf | 25 Aug 2020 |
| Proforma of Allotment letterFile: ATS_MDL.pdf | 5 May 2020 |
| Details of encumbrancesFile: The Park.pdf | 11 Nov 2019 |
| Certificates of CA (Form 5)File: The Park T1 to T5.pdf | 11 Oct 2019 |
| Form 2AFile: THe Park.pdf | 17 Jun 2019 |
| OtherFile: LDL to MDL.pdf | 29 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: 2019_04_11 MTM Approval letter.pdf | 12 Apr 2019 |
| Details of encumbrancesFile: THE PARK.pdf | 25 Feb 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: NR Allura.pdf | 18 Dec 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: NR Kiara.pdf | 18 Dec 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: NR Marquise.pdf | 18 Dec 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: NR Parkside.pdf | 18 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 2018 12 11 MTM CC Wing 5 till 63rd fl.pdf | 13 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: MTM CC dated 17 11 2018.pdf | 19 Nov 2018 |
| Details of encumbrancesFile: The Park.pdf | 16 Nov 2018 |
| Certificates of CA (Form 5)File: THE PARK.pdf | 1 Oct 2018 |
| Details of encumbrancesFile: The Park.pdf | 13 Aug 2018 |
| Layout approvalFile: Mumbai Mill - Environmental Clearance NOC 2.pdf | 14 Jun 2018 |
| Copy of Layout Approval (in case of layout)File: Mumbai Mill - Environmental Clearance NOC 2.pdf | 14 Jun 2018 |
| Copy of the legal title reportFile: The Park_All TR upto 28_03_18.pdf | 30 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: THE PARK.pdf | 6 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: THE PARK.pdf | 6 Apr 2018 |
| Certificates of CA (Form 3)File: The-Park-1-27.pdf | 29 Mar 2018 |
| Certificates of CA (Form 3)File: The-Park-28-54.pdf | 29 Mar 2018 |
| Details of encumbrancesFile: ENCUMBRANCES THE PARK_v2 as on Feb18.pdf | 26 Mar 2018 |
| Details of encumbrancesFile: ENCUMBRANCES THE PARK_v1.pdf | 20 Mar 2018 |
| Details of encumbrancesFile: ENCUMBRANCES THE PARK.pdf | 16 Mar 2018 |
| Certificates of CA (Form 3)File: park 1 to 5.pdf | 28 Feb 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 20180216 MTM CC.PDF | 19 Feb 2018 |
| Copy of the legal title reportFile: The Park Third Supplemental dated 22-12-2017.pdf | 22 Dec 2017 |
| Proforma of Allotment letterFile: ATS (The Park) - v3 - 8 November 2017Consol.pdf | 8 Nov 2017 |
| Proforma of Allotment letterFile: ATS (The Park) - v3 - 2 November 2017.pdf | 6 Nov 2017 |
| Certificates of CA (Form 3)File: RERA Bank Details.pdf | 31 Oct 2017 |
| Layout approvalFile: Layout Plan.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 25 Jul 2017 |
| Declaration in FORM BFile: The Park Form B.pdf | 25 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: the park.pdf | 25 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: The Park - Form 2_Reduced.pdf | 25 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 The Park A.pdf | 25 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 The Park B.pdf | 25 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 The Park C.pdf | 25 Jul 2017 |
| Building plan approvalFile: 9.pdf | 24 Jul 2017 |
| Building plan approvalFile: 10.pdf | 24 Jul 2017 |
| Building plan approvalFile: 1.pdf | 24 Jul 2017 |
| Building plan approvalFile: 2.pdf | 24 Jul 2017 |
| Building plan approvalFile: 5.pdf | 24 Jul 2017 |
| Building plan approvalFile: 6.pdf | 24 Jul 2017 |
| Building plan approvalFile: 3.pdf | 24 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 140 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 181 filed documents as one ZIP, foldered, with a manifest
Keep LODHA PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near .
Filed coordinates, straight-line distance. 43 registered projects within 2 km.
Lodha Adrina
LODHA DEVELOPERS LIMITED
7 Mahalaxmi - Tower 3
Runwal Real Estates Private Limited
7 Mahalaxmi - Tower 1
Runwal Real Estates Private Limited
RUNWAL RAAYA - TOWER 2
AETHON DEVELOPERS PRIVATE LIMITED
RUNWAL RAAYA - TOWER 1
AETHON DEVELOPERS PRIVATE LIMITED
PLUS ART
CHINTAMANI CONSTRUCTION COMPANY
Builder: MACROTECH DEVELOPERS LIMITED
Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if LODHA PARK is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LODHA PARK?
The registered promoter entity is MACROTECH DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LODHA PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LODHA PARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LODHA PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in LODHA PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback