Home / Browse projects / Pune, Maharashtra / Venkatesh Hillside Building B
Venkatesh Hillside Building B
RG-MH-41399 · RERA P52100045766 · Last updated on MahaRERA portal: 28 May 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Venkatesh Hillside Building B is a Residential / Group Housing project by VENKATESH ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100045766 on 9 Jun 2022. The registration is recorded completed; possession was promised by 31 May 2024.
At a glance
Project
- NameVenkatesh Hillside Building B
- TypeResidential / Group Housing
- Location
- DHAYARI ROAD
- DHAYARI
- Dhayari (Part)
- Haveli
- Pune
- 411041
- Pincode411041
- RERA no.P52100045766
- ReraGenie IDRG-MH-41399
Builder
- NameVENKATESH ASSOCIATES
- Entity typePartnership
- GSTIN27AADFV7559E1ZU
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersANIL GOPAL GANDHI, MILIND SHANTIKUMAR PANDIT, KALIDAS NIVRUTTI JAGADE
- Other registrations13 more →
- Completed7 of 14
- No longer live4 lapsed, de-registered or revoked
- Declared earlier projects12 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 Jun 2022
- Promised completion31 May 2024
- Revised completionNone
- Buildings1 building record
- Documents filed49 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Venkatesh Hillside Building B | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.
Venkatesh Hillside Building B: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MRS. SUREKHA SUDHAKAR JADHAVAR | Wadgaon Bk | Pune |
| MR. MAHESH NARAYANDAS AMBAVANI | Navi Mumbai (M Corp.) | Thane |
| MR. HARSH DEVANDAS LALWANI | Navi Mumbai (M Corp.) | Thane |
| MR. SACHIN JAIKUMAR BAJAJ | Ahmadnagar (M Corp.) | Ahmednagar |
| MR. SUSHIL RAMLAL BAJAJ | Ahmadnagar (M Corp.) | Ahmednagar |
| MR. SURENDER RAMLAL BAJAJ | Ahmadnagar (M Corp.) | Ahmednagar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Manohar Yerawar |
| Engineer | Structus Consultantss Pvt. Ltd. |
| Chartered Accountant | Jori & Co |
| Partner | Role in project |
|---|---|
| VENKATESH ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 May 2024
Documents filed49
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate ( Bldg B ).pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate ( Bldg B ).pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Certificate ( Bldg B )_compressed.pdf | 28 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate ( Bldg B ).pdf | 28 May 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Competion Certificate (Form - 4 ).pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Lettere (Venkatesh Hillside Bldg B ).pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginee Certificate ( Venkatesh Hillside Bldg B ).pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Certificate ( Venkatesh Hillside Bldg B )_compressed.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hillside Bldg B 766 - Form 1 - 23-24 Q2_compressed.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hillside Bldg B 766 - Form 2 - 23-24 Q2.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hillside Bldg B 766 - Form 3 - 23-24 Q2_compressed.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hillside Bldg B - Form 1 - 22-23 Q2_compressed.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hillside Bldg B - Form 2 - 22-23 Q2_compressed.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Hillside Bldg B - Sold Unsold - 22-23 Q2.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hillside Bldg B - Form 3 - 22-23 Q2_compressed.pdf | 17 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Bldg B.pdf | 10 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginee Certificate Bldg B.pdf | 10 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Ac Certificate Bldg B_compressed.pdf | 10 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Bldg B_compressed.pdf | 7 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Bldg B_compressed.pdf | 7 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Bldg B_compressed.pdf | 7 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Account Certificate Bldg B_compressed.pdf | 7 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (Venkatesh Hill side, Bldg - B ).pdf | 29 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineenr Certificate ( Venkatesh Hillside , Bldg -B,Plot No 4 )_compressed.pdf | 29 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Venkatesh Hill Side Bldg - B.pdf | 29 Nov 2022 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 20 May 2022 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Building plan approvalFile: 5 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| PAN CardFile: 1 PAN Card (1).pdf | 20 May 2022 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 20 May 2022 |
| Details of encumbrancesFile: 1 Details of encumbrances (1).pdf | 20 May 2022 |
| Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan Approval _ NA Order for plotted development.pdf | 20 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 20 May 2022 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 20 May 2022 |
| Declaration in FORM BFile: 1 Declaration in FORM B.pdf | 20 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 May 2022 |
| CERSAI detailsFile: 1 CERSAI details.pdf | 20 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost.pdf | 20 May 2022 |
| Proforma of Allotment letterFile: 1 Proforma of the allotment letter and agreement for sale.pdf | 20 May 2022 |
| Proforma of Allotment letterFile: 2 Proforma of the allotment letter and agreement for sale.pdf | 20 May 2022 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Venkatesh KamalaPR1260002502850 | Navi Peth, Pune | 11 | Mar 2026 | Ongoing | Dec 2028 | Not due yet |
| Venkatesh Hillside Building AP52100077270 | Dhayari, Pune | - | Aug 2024 | Completed | Apr 2026 | Late, May 2026 |
| LAKE TOWN D-6, WING - A and BP52100053248 | KATRAJ, Pune | 28 | Oct 2023 | Ongoing | Mar 2026Registered original: Dec 2025 | Not delivered |
| Venkatesh Hill Side, Plot No. 2, Building 1P52100045700 | DHAYARI, Pune | 1 | Jun 2022 | Completed | Nov 2025Registered original: May 2024 | Nov 2025 |
| CRYSTAL PARADISE BUILDING A, BP52100045774 | ., Pune | - | Jun 2022 | Ongoing | May 2024 | Not delivered |
| Venkatesh Galaxy | S. No. 44 2 Part Kondhwa Budurk | 40 | - | Completed | Feb 2016 | Dec 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 13 other registrations, which the RERA portal never shows together
- All 49 filed documents as one ZIP, foldered, with a manifest
Keep Venkatesh Hillside Building B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHAYARI13,700+ in Pune
VYANA PHASE-I -T5, T6, T7
KOLTE-PATIL DEVELOPERS LIMITED
Pratham Vihar Phase I
LJR Constructions LLP
VYANA PHASE-I-T2,T3 AT THE RESERVE
KOLTE-PATIL DEVELOPERS LIMITED
MAITREE MEGA CITY
MAITREE INFRA
RAMANA MYRA
SAI AND SHANTISHOBHA VENTURE
Apple Regency
Sri Sidhievinayak associetes
Builder: VENKATESH ASSOCIATES
VENKATESH ASSOCIATES has 14 registrations on MahaRERA, including OXY EVOLVE and OXY DESIRE. Its filings disclose 12 earlier MahaRERA projects: declares 6 of 9 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Venkatesh Hillside Building B is delayed beyond 31 May 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Venkatesh Hillside Building B?
The registered promoter entity is VENKATESH ASSOCIATES, a partnership as per the filing. Its GSTIN 27AADFV7559E1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Venkatesh Hillside Building B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Venkatesh Hillside Building B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Venkatesh Hillside Building B?
The professionals named in the filing: Architect: Manohar Yerawar; Engineer: Structus Consultantss Pvt. Ltd.; Chartered Accountant: Jori & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Venkatesh Hillside Building B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback