Completed No litigation declared Residential / Group Housing project

LAKE TOWN D-6, WING - A and B

By VENKATESH ASSOCIATES

RG-MH-58459 · RERA P52100053248 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 96%
16 of 28Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

LAKE TOWN D-6, WING - A and B is a Residential / Group Housing project by VENKATESH ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100053248 on 23 Oct 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 3 months from the original filing. 12 of the 28 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLAKE TOWN D-6, WING - A and B
  • TypeResidential / Group Housing
  • Location
    • KATRAJ ROAD
    • KATRAJ
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053248
  • ReraGenie IDRG-MH-58459

Builder

  • NameVENKATESH ASSOCIATES
  • Entity typePartnership
  • PartnersDNYANESHWAR VITTHAL GHATE, ANIL GOPAL GANDHI, MILIND SHANTIKUMAR PANDIT, KALIDAS NIVARUTI JAGADE
  • Other registrations13 more →
  • Completed7 of 14
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredOct 2023First promiseDec 2025Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Oct 2023
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed63 files

Current status

43%12 of 28 units booked
100.0%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAKE TOWN D-6, WING - A and BNA8828028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 96%.

LAKE TOWN D-6, WING - A and B: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed98

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots98
Closed/Covered40
Open Space58

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Dec 2025
LandownerVillageDistrict
CHANDRASHEKHAR DEVCHAND SETHPune (M Corp.)Pune
SUSHMA SATISH SETHPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI2928.92
Proposed, not sanctioned2,044 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTILAK ROAD, PUNE
Estimated costRs 10.72 cr
Cost incurredRs 10.72 cr
Work done100.0%
BuildingWingEstimatedIncurred
LAKE TOWN D-6, WING - A and BNARs 10.42 crRs 10.42 cr
-NARs 29.26 lakhRs 29.26 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR RAHUL SHAH
EngineerADITYA RAJIV MOHITE
EngineerAKSHAY WANI
Chartered AccountantJORI & CO
Chartered AccountantAnil Gandhi
PartnerRole in project
VENKATESH ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29122519109Dec 2025 → Mar 2026

Reason as filed by the promoterDeclaration/ Explanatory note setting out the grounds and reasons for delay in completion of project and need for grant of extension for registered project : LAKE TOWN D6, WING A and B (P52100053248)

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500260Ram GawaliVENKATESH ASSOCIATES29/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FORM - 5 Lake Town ( CA).pdf30 May 2026
Withdrawal Update Form 1File: Q4 Architect Letter Lake Town Form 1.pdf6 May 2026
Withdrawal Update Form 2File: Q4 FORM 2 Engineer Certificate Lake Town D6.pdf6 May 2026
Withdrawal Update Form 3File: Q4 FORM 3 Chartered Accountants ( Lake Town D6)_compressed.pdf6 May 2026
Occupational CertificateFile: Gmail - Verification Of Occupancy Certificate To RERA OCC_1293_25 Dated 27_02_2026.pdf6 May 2026
Occupational CertificateFile: Completion Certificate(CC163924).pdf6 May 2026
Form 2A (FY 2023-2024)File: Form FY 23-24.pdf26 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Q3.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q3.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 Chartered Account Certificate Q3 Lake Town_compressed.pdf6 Feb 2026
Form 5 (FY 2024-2025)File: FORM -5 Anual Report ( FY 2024-25 ).pdf30 Dec 2025
Withdrawal Update Form 1File: Archiect Certificate ( Form -1).pdf29 Dec 2025
Withdrawal Update Form 1File: Archiect Certificate ( Form -1).pdf29 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate FORM -2.pdf29 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate FORM -2.pdf29 Dec 2025
Withdrawal Update Form 3File: CA Certificate.pdf29 Dec 2025
Withdrawal Update Form 3File: CA Certificate.pdf29 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Letter ( Lake town D6 ).pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Engineer Certificate ( Lake Town D6 ).pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate ( Lake Town D6 ).pdf24 Jan 2025
Layout approvalFile: Plan Copy 1-3_compressed.pdf4 Dec 2024
Building plan approvalFile: Plan Copy 2-3_compressed.pdf4 Dec 2024
Building plan approvalFile: Plan Copy 3-3_compressed.pdf4 Dec 2024
Copy of Layout Approval (in case of layout)File: Plan Copy 1-3_compressed.pdf4 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf4 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan Copy 2-3_compressed.pdf4 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan Copy 3-3_compressed.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure LakeTown 03122024.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archiect Letter ( Lake town )_compressed.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate ( Lake town ).pdf28 May 2024
Proforma of Agreement for saleFile: Proforma of the agreement for sale.pdf13 Oct 2023
Layout approvalFile: Plan of 1 - 3-Recovered_compressed.pdf7 Oct 2023
Layout approvalFile: Plan of 2 - 3-Recovered_compressed.pdf7 Oct 2023
Layout approvalFile: Plan of 3 - 3-Recovered_compressed.pdf7 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan of 1 - 3-Recovered_compressed.pdf7 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan of 2 - 3-Recovered_compressed.pdf7 Oct 2023
Copy of Layout Approval (in case of layout)File: Plan of 3 - 3-Recovered_compressed.pdf7 Oct 2023
CERSAI detailsFile: No Cersai report.pdf22 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of lnterest in Other Real Estate Organizations ( A G Gandhi).pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of lnterest in Other Real Estate Organizations ( D V Ghate ).pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of lnterest in Other Real Estate Organizations ( KNJagade ).pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of lnterest in Other Real Estate Organizations ( SMPandit ).pdf15 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 36 Bank Ac Detalea_compressed.pdf15 Sep 2023
Deviation Report with respect to Allotment letterFile: 40 Deviation Allotment Letter.pdf15 Sep 2023
Declaration in FORM BFile: organized (1)_compressed.pdf14 Sep 2023
Building plan approvalFile: 5 Copy of 2 - 3_compressed.pdf13 Sep 2023
Building plan approvalFile: 6 Copy of 3- 3_compressed.pdf13 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 Copy of 2 - 3_compressed.pdf13 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Copy of 3- 3_compressed.pdf13 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf13 Sep 2023
PAN CardFile: 1 Company Pancard.pdf11 Sep 2023
Copy of the legal title reportFile: 2 Legal Title_compressed.pdf11 Sep 2023
Details of encumbrances concerned to FinanceFile: 3 Encumbrance Finance.pdf11 Sep 2023
Details of encumbrances concerned to FinanceFile: 4 Encumbrance legal.pdf11 Sep 2023
Details of encumbrances concerned to LegalFile: 3 Encumbrance Finance.pdf11 Sep 2023
Details of encumbrances concerned to LegalFile: 4 Encumbrance legal.pdf11 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 Commecement Certificate (1).pdf11 Sep 2023
Declaration about Commencement CertificateFile: 8 Declaration Commencemant Certificate.pdf11 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect Letter_compressed.pdf11 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 ENGNEER CERTIFICATE_compressed.pdf11 Sep 2023
Proforma of Allotment letterFile: 26 Allotment Letter_compressed.pdf11 Sep 2023
Deviation Report with respect to model copy of AgreementFile: 40 Deviation Agreement Sale.pdf11 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VENKATESH GALAXYSr No 44-2 Part Kondhwa Budurk40CompletedFeb 2016Dec 2015

How this compares with Pune

43%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 3 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAKE TOWN D-6, WING - A and B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATRAJ13,700+ in Pune

2 kmLAKE TOWN D-6, WING - A Completed 69Lapsed / revoked 42Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 180 registered projects within 2 km.

Builder: VENKATESH ASSOCIATES

VENKATESH ASSOCIATES has 14 registrations on MahaRERA, including OXY EVOLVE and OXY DESIRE. Its filings disclose 12 earlier MahaRERA projects: declares 6 of 9 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LAKE TOWN D-6, WING - A and B is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAKE TOWN D-6, WING - A and B?

The registered promoter entity is VENKATESH ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAKE TOWN D-6, WING - A and B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LAKE TOWN D-6, WING - A and B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LAKE TOWN D-6, WING - A and B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAKE TOWN D-6, WING - A and B?

The professionals named in the filing: Architect: AR RAHUL SHAH; Engineer: ADITYA RAJIV MOHITE; Engineer: AKSHAY WANI; Chartered Accountant: JORI & CO; Chartered Accountant: Anil Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKE TOWN D-6, WING - A and B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKE TOWN D-6, WING - A and B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKE TOWN D-6, WING - A and B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.