Home / Browse projects / Palghar, Maharashtra / OSTWAL IMPERIAL

Registered Litigation declared Residential / Group Housing project

OSTWAL IMPERIAL

By SHREE OSTWAL BUILDERS LTD

RG-MH-79068 · RERA P99000049283 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
358 of 370Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

OSTWAL IMPERIAL is a Residential / Group Housing project by SHREE OSTWAL BUILDERS LTD in Palghar, Maharashtra, registered with MahaRERA as P99000049283 on 7 Feb 2023. Possession is promised by 31 Dec 2028. 12 of the 370 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.

At a glance

Project

  • NameOSTWAL IMPERIAL
  • TypeResidential / Group Housing
  • Location
    • OFF DEVISHA ROAD
    • PALGHAR
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000049283
  • ReraGenie IDRG-MH-79068

Builder

  • NameSHREE OSTWAL BUILDERS LTD
  • Entity typeCompany
  • CINU45200MH1989PLC050872
  • GSTIN27AAFCS2523N1Z4
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorUMRAOSINGH PRITHVIRAJ OSTWAL
  • Other registrations19 more →
  • Completed7 of 20
  • Past their filed date1
  • Declared earlier projects6 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed122 files

Current status

3%12 of 370 units booked
32.5%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OSTWAL IMPERIAL BLDG NO 1 WING A AND BNA17161540154
OSTWAL IMPERIAL BLDG NO 2 WING A AND BNA171717640216

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

OSTWAL IMPERIAL BLDG NO 1 WING A AND B24%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
OSTWAL IMPERIAL BLDG NO 2 WING A AND B42%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks47%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed367

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots367
Closed/Covered101
Open Space266
BuildingClosed/CoveredOpen SpaceTotal
OSTWAL IMPERIAL BLDG NO 1 WING A AND B5488142
OSTWAL IMPERIAL BLDG NO 2 WING A AND B47178225

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,262 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2026
LandownerVillageDistrict
RAJKISHOR MISHRAPalghar Palghar
RUPALI MISHRAPalghar Palghar
MANSI TIWARIPalghar Palghar
NALINI MISHRAPalghar Palghar

Approvals and building plan

Sanctioning authorityPALGHAR MUNICIPAL COUNCIL
Permissible FSI35671.06
Proposed, not sanctioned28,534 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIRA BHAYANDER
Estimated costRs 110.03 cr
Cost incurredRs 35.76 cr
Work done32.5%
BuildingWingEstimatedIncurred
OSTWAL IMPERIAL BLDG NO 1 WING A AND BNARs 54.06 crRs 13.52 cr
OSTWAL IMPERIAL BLDG NO 2 WING A AND BNARs 46.97 crRs 21.14 cr
-NARs 9.00 crRs 1.10 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTU SHILP
EngineerRAJESH B DUBEY
EngineerBHAVESH TODANKAR
EngineerSUNIL PAWAR
EngineerPRO TECHCONSULTANTS
Chartered AccountantABHISHEK SURANA & CO
Chartered AccountantKHURDIA JAIN AND CO
Chartered AccountantABHISHEK SURANA & CO.
Chartered AccountantMadhubala Jain
PartnerRole in project
SHREE OSTWAL BUILDERS LTD-

Litigation declared2

CaseCourtStatus
77/2024CIVIL COURT PALGHARPENDING FOR HEARING
77/2024CIVIL COURT PALGHARPENDING FOR HEARING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Imperial_31032026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2_Imperial_31032026.pdf24 Jun 2026
Withdrawal Update Form 3File: Withdrawal Application Form3_Mar26_Imperial_.pdf24 Jun 2026
Withdrawal Update Form 1File: FORM-1_OSTWAL IMPERIAL_31122025.pdf28 May 2026
Withdrawal Update Form 1File: FORM-1_OSTWAL IMPERIAL_30092025.pdf28 May 2026
Withdrawal Update Form 1File: FORM-1_OSTWAL IMPERIAL_31122025.pdf28 May 2026
Withdrawal Update Form 2File: FORM 2_IMPERIAL_31122025.pdf28 May 2026
Withdrawal Update Form 2File: FORM 2_IMPERIAL_30092025.pdf28 May 2026
Withdrawal Update Form 2File: FORM 2_IMPERIAL_31122025.pdf28 May 2026
Withdrawal Update Form 3File: FORM 3_IMPERIAL_31122025.pdf28 May 2026
Withdrawal Update Form 3File: FORM 3_IMPERIAL_30092025.pdf28 May 2026
Withdrawal Update Form 3File: FORM 3_IMPERIAL_31122025.pdf28 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30062025_Imperial.pdf24 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 RERA IMPERIAL.pdf24 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062025_Imperial.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_ 30062025_Imperial.pdf24 Jul 2025
Other - FinanceFile: Imperial_Self Declaration 30062025.pdf24 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Ostwal Imperial Form-05 2023-24.pdf24 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Ostwal Imperial Form-05 2024-25.pdf24 Jul 2025
Form 1File: Form 1 31032025 .pdf24 Jul 2025
Form 2File: Form 2 31032025.pdf24 Jul 2025
Form 3File: Form 3 31032025.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold_ booked inventory 31032025.pdf24 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Certification.pdf24 Jul 2025
Form 1File: Form 1 31122025.pdf24 Jul 2025
Form 2File: FORM 2 31122025.pdf24 Jul 2025
Form 3File: 6 CA Certificate on Project Cost & Fund withdrawal (Form 3) (1).pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: 8 Disclosure of sold_ booked inventory (1).pdf24 Jul 2025
Form 1File: Form 1_30062025_Imperial.pdf20 Jul 2025
Form 2File: Form 2 30062025_Imperial.pdf20 Jul 2025
Form 3File: FORM - 3 RERA IMPERIAL 30062025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_ 30062025_Imperial.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Imperial_Self Declaration 30062025.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 REVISED.pdf27 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Imperial_.pdf13 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Certification Form-3 _31032025 _Imperial .pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _31122024_imperial.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _31032025_imperial.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31122024-IMPERIAL.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_31032025-Imperial_.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_March-25_Imperial.pdf17 Apr 2025
Copy of the legal title reportFile: Title Certificate-06032025.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Imperial Self Certification 31122024.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_ 31032025-IMPERIAL.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - IMPERIAL.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - IMPERIAL_11zon.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - IMPERIAL.pdf10 Mar 2025
CERSAI detailsFile: CERSAI_Search_Report_.pdf10 Mar 2025
Copy of the legal title reportFile: TITLE CERTIFICATE_IMPERIAL.pdf25 Feb 2025
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCRUMBRANCE CERT.pdf25 Feb 2025
Details of encumbrances concerned to FinanceFile: LEGAL AND LITIGATION ENCRUMBRANCE.pdf25 Feb 2025
Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf25 Feb 2025
Declaration in FORM BFile: FORM-B-PROMOTER.pdf25 Feb 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERT.pdf25 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A-DECLARATION SEPARATE BANK ACCOUNT.pdf25 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A-SEPARATE BANK ACCNT.pdf25 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A-PROMOTER LETTER HEAD.pdf25 Feb 2025
Deviation Report with respect to Allotment letterFile: DEVIATION-ALLOTMENT LETTER.pdf25 Feb 2025
Details of encumbrances concerned to LegalFile: FINANCIAL ENCRUMBRANCE CERT.pdf25 Feb 2025
Details of encumbrances concerned to LegalFile: LEGAL AND LITIGATION ENCRUMBRANCE.pdf25 Feb 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION-AGR FOR SALE.pdf25 Feb 2025
Proforma of Agreement for saleFile: AGR FOR SALE.pdf25 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real state.pdf25 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORM-B-BANK LETTERHEAD.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD_OSTWAL IMPERIAL_31122024.pdf14 Jan 2025
Other - FinanceFile: SELF CERTIFICATION_OSTWAL IMPERIAL_31122024.pdf14 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_OSTWAL IMPERIAL_31122024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_OSTWAL IMPERIAL.pdf20 Oct 2024
Other - FinanceFile: Ostwal ImperialSelf Certification_30092024.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate of Ostwal Imperial.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Imperial Quality Assurance Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Imperial Sold Unsold 30062024.pdf20 Jul 2024
Other - FinanceFile: Imperial Self Declaration as on 30062024.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance_Ostwal_Imperial-2024.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold_ Imperial.pdf16 Apr 2024
Other - FinanceFile: Self Declaration_ Imperial.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate_ Ostwal Imperial.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: 3 - Imperial - Discloser Sold Unsold Inventory.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PRO TECH CONSULTANT FORM 2.pdf10 Jan 2024
Layout approvalFile: IMPERIAL REVISED APPROVED PLAN_11zon.pdf2 Jan 2024

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
OSTWAL WOODSP99000019832OPP. UNION PARK, Palghar-Mar 2019CompletedDec 2024Jun 2023
OSTWAL DARSHANP51700004905BHAYANDER EAST, Thane-Aug 2017CompletedDec 2024Registered original: Dec 2023Jun 2024
OSTWAL GARDENKANAKIA ROAD MIRA ROAD EAST69-CompletedDec 2015Jun 2015
OSTWAL OASISMIRA ROAD EAST33-CompletedApr 2015Jan 2015
OSTWAL PRIDE IKANAKIA ROAD MIRA ROAD EAST63-CompletedMar 2015Mar 2015
OSTWAL HEIGHT BLDG 1 TO 4KANAKIA ROAD MIRA ROAD EAST195-CompletedDec 2013Dec 2013

How this compares with Palghar

3%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OSTWAL IMPERIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALGHAR3,200+ in Palghar

2 kmOSTWAL IMPERIALCompleted 127Lapsed / revoked 59Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 318 registered projects within 2 km.

Builder: SHREE OSTWAL BUILDERS LTD

SHREE OSTWAL BUILDERS LTD has 20 registrations on MahaRERA, including OSTWAL DARSHAN and OSTWAL POINT. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if OSTWAL IMPERIAL is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OSTWAL IMPERIAL?

The registered promoter entity is SHREE OSTWAL BUILDERS LTD, a company as per the filing. Its CIN U45200MH1989PLC050872 and GSTIN 27AAFCS2523N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OSTWAL IMPERIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OSTWAL IMPERIAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OSTWAL IMPERIAL?

The professionals named in the filing: Architect: VASTU SHILP; Engineer: RAJESH B DUBEY; Engineer: BHAVESH TODANKAR; Engineer: SUNIL PAWAR; Engineer: PRO TECHCONSULTANTS; Chartered Accountant: ABHISHEK SURANA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OSTWAL IMPERIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OSTWAL IMPERIAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OSTWAL IMPERIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.