PRITHVI ANAND KUBER COMPLEX
By Prithvi Anand Housing and Land Developers
RG-MH-28343 · RERA P99000025647 · Last updated on MahaRERA portal: 31 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 3 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 13 months
- 1 extension taken
- Rs 5.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRITHVI ANAND KUBER COMPLEX is a Residential / Group Housing project by Prithvi Anand Housing and Land Developers in Palghar, Maharashtra, registered with MahaRERA as P99000025647 on 1 Jul 2020. Possession was promised by 31 Jul 2026 and is now 3 months past that date. The completion date has moved by 13 months from the original filing. 407 of the 408 units on this registration are recorded sold or booked, and 39 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NamePRITHVI ANAND KUBER COMPLEX
- TypeResidential / Group Housing
- Location
- Manor Palghar Road
- Near St. John College
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000025647
- ReraGenie IDRG-MH-28343
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Jul 2020
- Promised completion31 Jul 2026
- Revised completionRevised to 31 Jul 2026 (originally 30 Jun 2025)
- Buildings4 building records
- Documents filed191 files
Current status
Figures as on 31 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building no 1 Prithvi Anand Nav | NA | 12 | 12 | 130 | 16 | 146 |
| Building no 2 Prithvi Anand Hans | NA | 10 | 10 | 106 | 17 | 123 |
| Building no 3 Prithvi Anand PATI | NA | 8 | 8 | 91 | 6 | 97 |
| Building No 4 Type G | NA | 6 | 6 | 30 | 12 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
39 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
Building no 1 Prithvi Anand Nav91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 2 Prithvi Anand Hans91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building no 3 Prithvi Anand PATI91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 4 Type G82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building no 1 Prithvi Anand Nav | 1 | 1 |
| Building no 2 Prithvi Anand Hans | 1 | 1 |
| Building no 3 Prithvi Anand PATI | 1 | 1 |
| Building No 4 Type G | 1 | 1 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building no 1 Prithvi Anand Nav | NA | Rs 13.46 cr | Rs 13.46 cr |
| Building no 2 Prithvi Anand Hans | NA | Rs 11.44 cr | Rs 11.44 cr |
| Building no 3 Prithvi Anand PATI | NA | Rs 9.10 cr | Rs 9.10 cr |
| - | NA | Rs 8.04 cr | Rs 8.04 cr |
| Building No 4 Type G | NA | Rs 4.44 cr | Rs 4.44 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ambre Gangatullu and associates |
| Engineer | Shahuraj Sharad Sabale |
| Engineer | Yogesh Vaza |
| Chartered Accountant | Virendra Kishor Tare |
| Chartered Accountant | Sachin H Chordiya |
| Chartered Accountant | Mohammad Memon |
| Partner | Role in project |
|---|---|
| Prithvi Anand Housing and Land Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe respectfully request an extension of the RERA registration for our project, currently valid until 30/06/2025, to a revised completion date of 31/07/2026. We had already obtained a part Occupancy Certificate for fully completed Building No.3 on dated 15/12/2023, the copy of which is attached with this application. Further we are also in the submission process of an application for Occupancy Certificate to Palghar Municipal Council for our completed Building No.1 & 2, for time being we are attaching a copy of 100% Architect Completion certificate for both the building, please find the same. O
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600335 | Bhakti Achrekar | Prithvi Anand Housing and Land Developers | 20/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jun 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jun 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jun 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed191
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 191 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2020-2021)File: Form 2A FY 2020-21.pdf | 31 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf | 31 Jul 2026 |
| Form 5 (FY 2020-2021)File: Form 5 FY 2020-21 Annual Audit Report of Statutory CA.pdf | 31 Jul 2026 |
| Form 5 (FY 2021-2022)File: Form 5 FY 2021-22 Annual Audit Report of Statutory CA.pdf | 31 Jul 2026 |
| Form 1File: PAKC Phase 1 From 1 upto 30 09 2020.pdf | 30 Jul 2026 |
| Form 2File: PAKC Phase 1 From 2 upto 30 09 2020.pdf | 30 Jul 2026 |
| Form 3File: PAKC Phase 1 From 3 upto 30 09 2020.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 30 09 2020.pdf | 30 Jul 2026 |
| Form 1File: PAKC Phase 1 From 1 upto 31 12 2020.pdf | 30 Jul 2026 |
| Form 2File: PAKC Phase 1 From 2 upto 31 12 2020.pdf | 30 Jul 2026 |
| Form 3File: PAKC Phase 1 From 3 upto 31 12 2020.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 31 12 2020.pdf | 30 Jul 2026 |
| Form 1File: PAKC Phase 1 From 1 upto 31 03 2021.pdf | 30 Jul 2026 |
| Form 2File: PAKC Phase 1 From 2 upto 31 03 2021.pdf | 30 Jul 2026 |
| Form 3File: PAKC Phase 1 From 3 upto 31 03 2021.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 31 03 2021.pdf | 30 Jul 2026 |
| Form 1File: PAKC Phase 1 From 1 upto 31 03 2022.pdf | 30 Jul 2026 |
| Form 2File: PAKC Phase 1 From 2 upto 31 03 2022.pdf | 30 Jul 2026 |
| Form 3File: PAKC Phase 1 From 3 upto 31 03 2022.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure Q4 FY 2021-22.pdf | 30 Jul 2026 |
| Form 1File: PAKC Phase 1 From 1 upto 30 06 2023.pdf | 30 Jul 2026 |
| Form 2File: PAKC Phase 1 From 2 upto 30 06 2023.pdf | 30 Jul 2026 |
| Form 3File: PAKC Phase 1 From 3 upto 30 06 2023.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 30 06 2023.pdf | 30 Jul 2026 |
| Form 1File: PAKC Phase 1 From 1 upto 30 06 2021.pdf | 30 Jul 2026 |
| Form 2File: PAKC Phase 1 From 2 upto 30 06 2021.pdf | 30 Jul 2026 |
| Form 3File: PAKC Phase 1 From 3 upto 30 06 2021.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 30 06 2021.pdf | 30 Jul 2026 |
| Form 1File: PAKC Phase 1 From 1 upto 30 09 2021.pdf | 30 Jul 2026 |
| Form 3File: PAKC Phase 1 From 3 upto 30 09 2021.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 30 09 2021.pdf | 30 Jul 2026 |
| Form 2File: PAKC Phase 1 From 2 upto 30 09 2021.pdf | 30 Jul 2026 |
| Form 1File: RERA From 1 30 06 2022.pdf | 30 Jul 2026 |
| Form 2File: RERA From 2 30 06 2022.pdf | 30 Jul 2026 |
| Form 3File: RERA From 3 30 06 2022.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disclosure Q1 FY 2022-23.pdf | 30 Jul 2026 |
| Form 1File: RERA From 1 - 31 12 2022.pdf | 30 Jul 2026 |
| Form 2File: RERA From 2 - 31 12 2022.pdf | 30 Jul 2026 |
| Form 3File: RERA From 3 - 31 12 2022.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31 12 2022.pdf | 30 Jul 2026 |
| Form 1File: PAKC Phase 1 From 1 upto 31 12 2021.pdf | 30 Jul 2026 |
| Form 2File: PAKC Phase 1 From 2 upto 31 12 2021.pdf | 30 Jul 2026 |
| Form 3File: PAKC Phase 1 From 3 upto 31 12 2021.pdf | 30 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory upto 31 12 2021.pdf | 30 Jul 2026 |
| Withdrawal Update Form 1File: PAKC Phase 1 From 1 upto 30 06 2026.pdf | 27 Jul 2026 |
| Withdrawal Update Form 2File: PAKC Phase 1 From 2 upto 30 06 2026.pdf | 27 Jul 2026 |
| Withdrawal Update Form 3File: PAKC Phase 1 From 3 upto 30 06 2026.pdf | 27 Jul 2026 |
| Form 1File: rera form 1 30 09 2022 _11zon.pdf | 2 Jul 2026 |
| Form 2File: RERA From 2 30 09 2022 11zon.pdf | 2 Jul 2026 |
| Form 3File: Form 3 PAKC 30 09 2022 Final11zon.pdf | 2 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 30 09 2022.pdf | 2 Jul 2026 |
| Form 1File: phase 1 form 1 upto 30 6 2024.pdf | 2 Jul 2026 |
| Form 2File: phase 1 form 2 upto 30 6 2024.pdf | 2 Jul 2026 |
| Form 3File: phase 1 form 3 upto 30 6 2024 11zon.pdf | 2 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold Unsold Inventory 30 06 2024 (2).pdf | 2 Jul 2026 |
| Form 1File: Phase 1 Form 1 upto 31032024.pdf | 1 Jul 2026 |
| Form 2File: Phase 1 Form 2 upto 31032024.pdf | 1 Jul 2026 |
| Form 3File: Phase 1 Form 3 upto 31032024.pdf | 1 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 31 03 2024.pdf | 1 Jul 2026 |
| Form 1File: PAKC Phase 1 Form 1 30 09 2023.pdf | 30 Jun 2026 |
| Form 2File: PAKC Phase 1 Form 2 30 09 2023.pdf | 30 Jun 2026 |
| Form 3File: PAKC Phase 1 Form 3 30 09 2023.pdf | 30 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 30 09 2023.pdf | 30 Jun 2026 |
| Form 1File: PAKC 1 RERA Form 1 - 31-12-2023.pdf | 30 Jun 2026 |
| Form 2File: PAKC 1 RERA Form 2 - 31-12-2023.pdf | 30 Jun 2026 |
| Form 3File: PAKC 1 RERA Form 3 - 31-12-2023.pdf | 30 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory 31 12 2023.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: PAKC Phase 1 From 1 upto 31 12 2025.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: PAKC Phase 1 From 1 upto 31 03 2026.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: PAKC Phase 1 From 2 upto 31 12 2025.pdf | 30 Jun 2026 |
| Withdrawal Update Form 2File: PAKC Phase 1 From 2 upto 31 03 2026.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: PAKC Phase 1 From 3 upto 31 12 2025.pdf | 30 Jun 2026 |
| Withdrawal Update Form 3File: PAKC Phase 1 From 3 upto 31 03 2026.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: PAKC Phase 1 From 1 upto 30 09 2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: PAKC Phase 1 From 1 upto 30 09 2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: PAKC Phase 1 From 2 upto 30 09 2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: PAKC Phase 1 From 2 upto 30 09 2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: PAKC Phase 1 From 3 upto 30 09 2025.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: PAKC Phase 1 From 3 upto 30 09 2025.pdf | 25 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf | 21 Aug 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PRITHVI SRISHTIP99000018010 | TEMBHODE, Palghar | Oct 2018 | Certificate Signed | Jun 2022 | Jun 2022 |
| PRITHVI SRISHTIP99000014102 | Palghar, Palghar | Nov 2017 | Completed | Sep 2020 | Late, Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 7 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 191 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRITHVI ANAND KUBER COMPLEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near St. John College3,200+ in Palghar
Filed coordinates, straight-line distance. 182 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
Haware Nakshatra Phase 4
Haware Infotech Ltd
See every Palghar project, with the district possession charts
Builder: Prithvi Anand Housing and Land Developers
Prithvi Anand Housing and Land Developers has 4 registrations on MahaRERA, including PRITHVI SRISHTI and PRITHVI SRISHTI. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that PRITHVI ANAND KUBER COMPLEX shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PRITHVI ANAND KUBER COMPLEX is delayed beyond 31 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRITHVI ANAND KUBER COMPLEX?
The registered promoter entity is Prithvi Anand Housing and Land Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRITHVI ANAND KUBER COMPLEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PRITHVI ANAND KUBER COMPLEX?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PRITHVI ANAND KUBER COMPLEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRITHVI ANAND KUBER COMPLEX?
The professionals named in the filing: Architect: Ambre Gangatullu and associates; Engineer: Shahuraj Sharad Sabale; Engineer: Yogesh Vaza; Chartered Accountant: Virendra Kishor Tare; Chartered Accountant: Sachin H Chordiya; Chartered Accountant: Mohammad Memon. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRITHVI ANAND KUBER COMPLEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback