V UPTOWN F WING MHADA COMMERCIAL
By TATVAM CONSTRUCTIONS PRIVATE LIMITED
RG-MH-12819 · RERA P52100021198 · Last updated on MahaRERA portal: 24 Jan 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 47 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 17 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
V UPTOWN F WING MHADA COMMERCIAL is a Residential / Group Housing project by TATVAM CONSTRUCTIONS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100021198 on 14 Jun 2019. Possession was promised by 10 Nov 2022 and is now 47 months past that date. The completion date has moved by 17 months from the original filing. 3 complaints are on record with the regulator.
At a glance
Project
- NameV UPTOWN F WING MHADA COMMERCIAL
- TypeResidential / Group Housing
- Location
- KIWALE
- Mawal
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100021198
- ReraGenie IDRG-MH-12819
Builder
- NameTATVAM CONSTRUCTIONS PRIVATE LIMITED
- Entity typeCompany
- Managing DirectorDIPAK RAMNIKLAL SHAH
- DirectorsSAMEER RAMNIKLAL SHAH, MEHUL JADHAVJI SHAH, JAIDEEP RAMESH MEHTA, JENISH SANJAY DESAI
- Other registrations4 more →
- Completed1 of 5
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Jun 2019
- Promised completion10 Nov 2022
- Revised completionRevised to 10 Nov 2022 (originally 30 Jun 2021)
- Buildings2 building records
- Documents filed48 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| V UPTOWN F WING MHADA | NA | 14 | 0 | 0 | 0 | 0 |
| V UPTOWN COMMERCIAL WING | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
V UPTOWN F WING MHADA73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
V UPTOWN COMMERCIAL WING18%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| V UPTOWN F WING MHADA | 1 | 0 | 1 |
| V UPTOWN COMMERCIAL WING | 0 | 5 | 5 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UNUSUAL SPACES |
| Partner | Role in project |
|---|---|
| TATVAM CONSTRUCTIONS PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterLOCKDOWN ,LABOR AND RAW MATERIAL SHORTAGE
Reason as filed by the promoterwe, M/s. Tatvam Constructions Private Limited, hereby declare the following with respect to the project V Uptown F Wing Mhada Commercial bearing registration number. P52100021198 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, we received the Occupation Certificate (OC) on 10th November 2022 and we have initiated the process for the possession as well, hence we won't be required to upload consents. To provide assurance and facilitate a smooth completion process, we are closely monitorin
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000157320 | Vaibhav Prabhakar More | TATVAM CONSTRUCTIONS PRIVATE LIMITED | 11/07/2022 |
| CC005000000157324 | Shridhar Yuvaraj Dhaware | DEEPAK SHAH | 09/11/2022 |
| CC005000000198003 | Sachin Suryawanshi | TATVAM CONSTRUCTIONS PRIVATE LIMITED | 05/01/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jun 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Nov 2022
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Form B (Affidavit cum Declaration)_11zon.pdf | 24 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sept 2024.pdf | 24 Jan 2025 |
| Certificates of CA (Form 3)File: Revised Form 3.pdf | 24 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sept 2024.pdf | 24 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-F- 19-20.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Signed Form 5 2018-19.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Signed Form 5 2019-20.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5 2020-21.pdf | 24 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-F-20-21.pdf | 24 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Cir 29.pdf | 24 Jan 2025 |
| CERSAI detailsFile: Declaration of CERSAI.pdf | 24 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Form 5 2021-22.pdf | 24 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-F-21-22.pdf | 24 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - DRS.pdf | 24 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - SRS.pdf | 24 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A April 2022 to Nov 2022.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5 April 2022 - Nov 2022.pdf | 24 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: F WING COMPLETION CERTIFICATE.pdf | 19 Nov 2022 |
| Declaration about Commencement CertificateFile: FORMAT D.PDF | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: C 05.PDF | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: C 06.PDF | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: C 07.PDF | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: F 05.PDF | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: F 06.PDF | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: F 07.PDF | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: F 09.PDF | 18 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: F 09.PDF | 18 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: certificate F wing_18-19.pdf | 18 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CERTIFICATE_F_ WING_2019-2020.pdf | 18 Aug 2021 |
| Details of encumbrancesFile: HFCL1.PDF | 1 Jun 2021 |
| Details of encumbrancesFile: HFCL2.PDF | 1 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: F WING.pdf | 22 May 2021 |
| Proforma of Allotment letterFile: MHADA DRAFT AGR_compressed.pdf | 19 Sep 2020 |
| Building plan approvalFile: IOD_compressed (1)_compressed (1).pdf | 7 Jun 2019 |
| Layout approvalFile: LAYOUT_compressed (1).pdf | 7 Jun 2019 |
| Layout approvalFile: LAYOUT FLOOR PLAN_compressed.pdf | 7 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: LAYOUT_compressed (1).pdf | 7 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: LAYOUT FLOOR PLAN_compressed.pdf | 7 Jun 2019 |
| Building Plan Approval (IOD)File: IOD_compressed (1)_compressed (1).pdf | 7 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MHADA ARCHITECT CERTIFICATE_compressed.pdf | 7 Jun 2019 |
| Copy of the legal title reportFile: Title And serch Report 2018-ilovepdf-compressed-ilovepdf-compressed.pdf | 28 May 2019 |
| Details of encumbrancesFile: Encumbrance Letter.PDF | 28 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf | 28 May 2019 |
| Declaration in FORM BFile: Affidevit Cum Declaration-ilovepdf-compressed.pdf | 28 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: enginner_compressed.pdf | 28 May 2019 |
| Certificates of CA (Form 3)File: CA Certificate_compressed.pdf | 28 May 2019 |
| Proforma of Allotment letterFile: MHADA DRAFT-converted.pdf | 28 May 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VIVIANA | 18 PIMPLE NILAKH PUNE 411027 | 28 | Completed | Dec 2013 | Late, Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep V UPTOWN F WING MHADA COMMERCIAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KIWALE13,700+ in Pune
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: TATVAM CONSTRUCTIONS PRIVATE LIMITED
TATVAM CONSTRUCTIONS PRIVATE LIMITED has 5 registrations on MahaRERA, including V UPTOWN WING-B and V UPTOWN C WING. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that V UPTOWN F WING MHADA COMMERCIAL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if V UPTOWN F WING MHADA COMMERCIAL is delayed beyond 10 Nov 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of V UPTOWN F WING MHADA COMMERCIAL?
The registered promoter entity is TATVAM CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in V UPTOWN F WING MHADA COMMERCIAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against V UPTOWN F WING MHADA COMMERCIAL?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for V UPTOWN F WING MHADA COMMERCIAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at V UPTOWN F WING MHADA COMMERCIAL?
The professionals named in the filing: Architect: UNUSUAL SPACES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in V UPTOWN F WING MHADA COMMERCIAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback