Home / Browse projects / Tower of Ascend

Registered No litigation declared Commercial project

Tower of Ascend

By Vascon Engineers Ltd

RG-MH-78404 · RERA P52100051705 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Mar 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 87%
13 of 45Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

Tower of Ascend is a Commercial project by Vascon Engineers Ltd in kharadi, 411014, registered with MahaRERA as P52100051705 on 27 Jun 2023. Possession is promised by 31 Mar 2028. 32 of the 45 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameTower of Ascend
  • TypeCommercial
  • Location
    • kharadi
    • 411014
  • Pincode411014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051705
  • ReraGenie IDRG-MH-78404

Builder

  • NameVascon Engineers Ltd
  • Entity typeCompany
  • CINL70100PN1986PLC175750
  • GSTIN27AAACV1249F1ZI
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorSiddharth Vasudevan Moorthy
  • DirectorsSantosh Pursram Sundararajan, Santosh Sundararajan, Santosh Sundararajan
  • Other registrations11 more →
  • Completed6 of 12
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed106 files

Current status

71%32 of 45 units booked
61.2%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower of AscendNA141204545

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 87%.

Tower of Ascend: 62% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure87%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingYes60%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Rainbow AssociatesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI14658.93
Proposed, not sanctioned12,526 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKoregaon Park, Pune-411001
Estimated costRs 64.56 cr
Cost incurredRs 39.51 cr
Work done61.21%
BuildingWingEstimatedIncurred
Tower of AscendNARs 58.13 crRs 36.51 cr
-NARs 6.43 crRs 3.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Yogesh Patil
EngineerMalhar Dubule
Chartered AccountantManish Surana
Chartered AccountantSharp & Tannan Associates Chartered Accontants
PartnerRole in project
Vascon Engineers Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 TOA 2025-26.pdf2 Jul 2026
Withdrawal Update Form 1File: Form 1 TOA March 2026.pdf22 Jun 2026
Withdrawal Update Form 1File: Form 1 TOA March 2026.pdf22 Jun 2026
Withdrawal Update Form 2File: Form 2 TOA March 2026.pdf22 Jun 2026
Withdrawal Update Form 2File: Form 2 TOA March 2026.pdf22 Jun 2026
Withdrawal Update Form 3File: TOA Form 3 December 2025 Signed.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 TOA March 2026a.pdf22 Jun 2026
Withdrawal Update Form 1File: Form 1 TOA RERA Dec 2025 signed.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 TOA Dec 2025 signed.pdf24 Apr 2026
Withdrawal Update Form 3File: TOA Form 3 December 2025 Signed.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 TOA Sep 2025 R1.pdf29 Dec 2025
Withdrawal Update Form 2File: Form 2 TOA Sep 2025.pdf29 Dec 2025
Withdrawal Update Form 3File: Form 3 TOA Sep 2025 R1.pdf29 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 TOA FY 24-25.pdf17 Nov 2025
Form 1File: Form 1 TOA April 2025.pdf5 Oct 2025
Form 2File: Form 2 TOA March 2025.pdf5 Oct 2025
Form 3File: Form 3 TOA March 2025.pdf5 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory R1.pdf5 Oct 2025
Form 1File: Form 1 TOA June 2025.pdf5 Oct 2025
Form 2File: Form 2 TOA June 2025.pdf5 Oct 2025
Form 3File: Form 3 TOA June 2025.pdf5 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory R1.pdf5 Oct 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory R1.pdf22 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 TOA Dec 2024.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Dec 24 TOA.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TOA Dec 2024.pdf7 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 TOA 2024.pdf5 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory TOA.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOA Form 3 June 2024.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOA Form 3 Sep 2024.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOA Form 1 June 2024.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOA Form 1 Sept 2024.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TOA Form 2 June 2024.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TOA Form 2 Sept 2024.pdf7 Nov 2024
Building plan approvalFile: 1.pdf7 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOA Form 1 March 2024.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TOA Form 2 March 2024.pdf7 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: TOA form 2A 2024.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: TOA Sold Unsold Inventory.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TOA revised sanction.pdf7 May 2024
Building plan approvalFile: 1.pdf23 Apr 2024
Building plan approvalFile: 8.pdf23 Apr 2024
Building plan approvalFile: 9.pdf23 Apr 2024
Building plan approvalFile: 10.pdf23 Apr 2024
Building plan approvalFile: 11.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf23 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2024 TOA.pdf23 Apr 2024
Declaration about Commencement CertificateFile: TOA Declaration of Commencement.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOA Form 3 Dec 2023.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOA-Form-01-Architects Certificate October 2023.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOA-Form-01-Architects Certificate January 2024.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TOA Form 2 Sept 2023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TOA Form 2 Dec 2023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOA Form 3 Sept 2023.pdf22 Jan 2024
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200275518288_For_Registration_Of_Security_Interest_26_07_202328 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Declaration of Commencement TOA revised sanction.pdf15 Jun 2023
Other - TechnicalFile: TOA-SITE LAYOUT.pdf15 Jun 2023
Other - TechnicalFile: TOA-Ground floor Layout.pdf15 Jun 2023
Other - TechnicalFile: TOA-1st floor Layout.pdf15 Jun 2023
Other - TechnicalFile: TOA-2nd floor Layout.pdf15 Jun 2023
Other - TechnicalFile: TOA-3rd floor Layout.pdf15 Jun 2023
Other - TechnicalFile: TOA-4th floor Layout.pdf15 Jun 2023
Other - TechnicalFile: TOA-Basement-01.pdf15 Jun 2023
Other - TechnicalFile: TOA-Basement-02.pdf15 Jun 2023
Other - TechnicalFile: TOA-Basement-03.pdf15 Jun 2023
Building plan approvalFile: 2.pdf14 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf14 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert 2023.pdf14 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOA Form01 Architects Certificate June 2023.pdf14 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate Form 3 of Tower of Ascend 050523.pdf14 Jun 2023
Other - TechnicalFile: DECLARATION FOR SHOWROOM.pdf14 Jun 2023
Building plan approvalFile: 1.pdf13 Jun 2023
Building plan approvalFile: 3.pdf13 Jun 2023
Building plan approvalFile: 4.pdf13 Jun 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Forest CountyKharadi809CompletedDec 2017Apr 2017
Forest CountyKharadi809CompletedDec 2017Apr 2017
ELA HadapsarHadapsar94CompletedDec 2014Late, Jul 2017
EcoTowerBaner19CompletedAug 2014Late, Nov 2016
WillowsBaner160CompletedNov 2013Late, Apr 2015

Keep Tower of Ascend on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near kharadi

2 kmTower of AscendCompleted 47Lapsed / revoked 24Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: Vascon Engineers Ltd

Vascon Engineers Ltd has 12 registrations on MahaRERA, including Vista II and Windermere Phase 1. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Tower of Ascend is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tower of Ascend?

The registered promoter entity is Vascon Engineers Ltd, a company as per the filing. Its CIN L70100PN1986PLC175750 and GSTIN 27AAACV1249F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tower of Ascend?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tower of Ascend?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tower of Ascend?

The professionals named in the filing: Architect: Ar Yogesh Patil; Engineer: Malhar Dubule; Chartered Accountant: Manish Surana; Chartered Accountant: Sharp & Tannan Associates Chartered Accontants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tower of Ascend?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tower of Ascend. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tower of Ascend to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.