ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Tokyo Bay Phase - 1

Completed No litigation declared Residential / Group Housing project

Tokyo Bay Phase - 1

By Puranik Tokyo Bay Private Limited

RG-MH-09168 · RERA P51700000618 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 0%
6Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Tokyo Bay Phase - 1 is a Residential / Group Housing project by Puranik Tokyo Bay Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700000618 on 18 Jul 2017. The registration is recorded completed; possession was promised by 30 Oct 2023. 6 complaints are on record with the regulator.

At a glance

Project

  • NameTokyo Bay Phase - 1
  • TypeResidential / Group Housing
  • Location
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700000618
  • ReraGenie IDRG-MH-09168

Builder

  • NamePuranik Tokyo Bay Private Limited
  • Entity typeCompany
  • CINU41001MH2023PTC402600
  • GSTIN27AANCP7511K1ZZ
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersPuranik Builders Limited, SYNS Builders PvtLtd
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017PromisedOct 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion30 Oct 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A - YukiNA190000
Wing B - SakiNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.

Wing A - Yuki91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B - Saki91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Community BuildingNoNot applicable

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Closed/Covered162
BuildingClosed/CoveredTotal
Wing A - Yuki8888
Wing B - Saki7474

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,778 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Veerdhaval Sitaram Ghag & Sangeeta Veerdhaval GhagThane (M Corp.)Thane
Veerdhaval Sitaram GhagThane (M Corp.)Thane
ADFBDThane (M Corp.)Thane

Approvals and building plan

Permissible FSI8777.32
Proposed, not sanctioned5,046 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank, Kapurbawadi Junction, Majiwade, Thane

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastushilpa Associates
ArchitectArchetype Consultants(I) Pvt . Ltd.
EngineerM/s Epicons Consultants Pvt Ltd.
PartnerRole in project
Puranik Tokyo Bay Private Limited-

Litigation declared3

CaseCourtStatus
Gaun khanij/SR/246/2018Tahsildar ThaneFor Order
4725/2021High CourtDispose off
CC006000000198091/2022Maharashtra Real Estate Regulatory AuthorityFor Hearing

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000090088Unnathi AssociatesM/s. Sai Pushp Enterprises12/07/2019
CC006000000171708Pranav Anil KelkarBhavesh Rasal29/11/2019
CC006000000194386Suresh Kishinmal DodejaPURANIK GOUP / SAI PUSHP ENTERPRISES / SHAILESH PURANIK12/10/2020
CC006000000198091SANDEEP NAIKPuranik Builders Private Limited21/12/2021
CC006000000210402Sanjeev Gopalkrishna GalgaliM/s Saipushp Enterprises15/03/2022
CC006000000396123Priti Amit BendeSai Pushp Enterprises26/06/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Jun 2022

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Tokyo Bay Phase 1 - sign.pdf30 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yuki and SaKi - T1.pdf21 Aug 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: TB I.pdf17 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 1 31122021.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1FORM 2A OLD f- TB I Oct 2018- Dec 2018.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2 FORM 2A OLD f- TB I Jan 2019- March 2019.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 3 FORM 2A OLD f- TB I April 2019- June 2019.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 4 FORM 2A OLD f- TB I July 2019 to Sept 2019).pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5 FORM 2A OLD f- TB I Oct2019 to Dec 2019).pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 6 FORM 2A OLD f- TB I Jan2020to March 2020.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 7 FORM 2A OLD f- TB I April2020to June 2020.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 8 FORM 2A OLD f- TB I July 2020to Sept 2020).pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 9 FORM 2A OLD f- TB I Oct2020to Dec 2020.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 10 FORM 2A OLD f- TB I Jan2021to March 2021).pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 11 FORM 2A OLD f- TB I April 2021to June 2021.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 12 FORM 2A OLD f- TB I July 2021to Sept2021.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 13 Form 2A- TB1 Oct 21-Dec 21.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 14 Form 2A- TB1 Jan22- March22.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 15 Form 2A- TB1 April22- June22.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 16 Form 2A- TB1 July22- Sept22.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 17 Form 2A- TB1 Oct 22- Dec 22.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 18 Form 2A- TB1 Jan23- March 23.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-TB I A B 31032021.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062021Architect certificate.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 30062022.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 30092022.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 31122022.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect certificate 30062022.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 130092021.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 130062021.pdf15 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062021Architect Certificate TB I AND B.pdf14 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092021Architect Certificate FORM 1 TB I A B.pdf14 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31122021 Architect Certificate-TB I A B.pdf14 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31032022 Architect Certificate-TB I A B.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 1 30032021.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 130062021.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 130092021.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 1 31122021.pdf14 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 1 30092022.pdf10 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 131122022.pdf10 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Architect Completion Certificate -TB-1 31012023.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-TB I A B 31032022.pdf3 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 1 31032022.pdf3 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate TB 130062022.pdf3 Apr 2023
Certificates of CA (Form 3)File: CA Certificates - TB I RERA till 31122020.pdf1 Apr 2023
Certificates of CA (Form 3)File: CA Certificates - TB I RERA till 31032021.pdf1 Apr 2023
Certificates of CA (Form 3)File: CA Certificates - TB I RERA till 30062021.pdf1 Apr 2023
Certificates of CA (Form 3)File: CA Certificates - TB I RERA till 30092021.pdf1 Apr 2023
Certificates of CA (Form 3)File: CA Certificates - TB I 31122021.pdf1 Apr 2023
Certificates of CA (Form 3)File: CA Certificates - TB I RERA till 31032022.pdf1 Apr 2023
Certificates of CA (Form 3)File: CA Certificates TB I A B RERA till 30062022.pdf1 Apr 2023
Certificates of CA (Form 3)File: TB-Ph-1 Sept 22.pdf1 Apr 2023
Certificates of CA (Form 3)File: Tokyo Bay Ph-1 Dec 22.pdf1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: TB-Ph-1.pdf1 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC TB 1.pdf9 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 TB 1 Sai Pushp.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Tokyo Phase 1.pdf31 Jul 2021
Details of Restarting of Construction work post lockdownFile: TB 1 - REPORT.pdf27 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 18-19 Tokyo Bay Ph 1.PDF3 Jan 2020
Details of encumbrancesFile: Details Of Encumbrances.PDF29 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf29 Mar 2019
Certificates of CA (Form 5)File: Tokyoa Bay 1 Form 5.pdf7 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: TB 1 CC 19032018.pdf13 Jun 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: TB 1.pdf30 Mar 2018
Proforma of Allotment letterFile: TOKYO BAY-1 RERA AGREEMENT.pdf8 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: SANCTION.PDF26 Feb 2018
Building plan approvalFile: SANCTION.PDF15 Jul 2017
Building Plan Approval (IOD)File: SANCTION.PDF15 Jul 2017
Declaration in FORM BFile: Declaration TB 1.PDF15 Jul 2017
OtherFile: Letter.PDF15 Jul 2017
OtherFile: PHASEWISE LAYOUT.pdf15 Jul 2017
Layout approvalFile: SANCTIONED LAYOUT.pdf14 Jul 2017
Copy of the legal title reportFile: Title Report Tokyo Bay1.PDF14 Jul 2017
Details of encumbrancesFile: Details of Encumbrances TB I.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: SANCTIONED LAYOUT.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Tokyo Bay 1.pdf14 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Tokyo Bay 1.PDF14 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Tokyo Bay 1.PDF14 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER TOKYO BAY I.pdf14 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tokyo Bay Phase - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane (M Corp.)7,600+ in Thane

2 kmTokyo Bay Phase - 1Completed 75Lapsed / revoked 25Other 50Dot size: filed unitsN

Filed coordinates, straight-line distance. 150 registered projects within 2 km.

Builder: Puranik Tokyo Bay Private Limited

Puranik Tokyo Bay Private Limited has 6 registrations on MahaRERA, including Tokyo Bay Phase - 2A and Tokyo Bay Phase - 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Tokyo Bay Phase - 1 is delayed beyond 30 Oct 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tokyo Bay Phase - 1?

The registered promoter entity is Puranik Tokyo Bay Private Limited, a company as per the filing. Its CIN U41001MH2023PTC402600 and GSTIN 27AANCP7511K1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tokyo Bay Phase - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Tokyo Bay Phase - 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Tokyo Bay Phase - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tokyo Bay Phase - 1?

The professionals named in the filing: Architect: Vastushilpa Associates; Architect: Archetype Consultants(I) Pvt . Ltd.; Engineer: M/s Epicons Consultants Pvt Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tokyo Bay Phase - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tokyo Bay Phase - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tokyo Bay Phase - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.