Home / Browse projects / Raigarh, Maharashtra / THE MIST - PHASE III
THE MIST - PHASE III
RG-MH-18306 · RERA P52000077097 · Last updated on MahaRERA portal: 13 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 7 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE MIST - PHASE III is a Others project by GeeCee Ventures Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000077097 on 23 Jul 2024. Possession is promised by 30 Jun 2028. 5 of the 139 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.
At a glance
Project
- NameTHE MIST - PHASE III
- TypeOthers
- Location
- Konadavane Road
- Dahiwali T Waredi
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000077097
- ReraGenie IDRG-MH-18306
Builder
- NameGeeCee Ventures Limited
- Entity typeCompany
- CINL24249MH1984PLC032170
- GSTIN27AAACG3914A1Z7
- Non- Executive DirectorRohit Ashwin Kothari
- Whole - time DirectorsSureshkumar Vasudevan Vazhathara Pillai, Gaurav Shyamsukha
- Independent DirectorsVallabh Prasad Biyani, Neha Bandyopadhyay, Rupal Vora
- Other registrations10 more →
- Completed7 of 11
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jul 2024
- Promised completion30 Jun 2028
- Revised completionNone
- Buildings2 building records
- Documents filed63 files
Current status
Figures as on 13 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING F | NA | 8 | 7 | 28 | 7 | 35 |
| WING G | NA | 14 | 13 | 104 | 0 | 104 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 97%.
WING F64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
WING G53%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 56% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 55% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 20% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed191
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING F | 5 | 47 | 52 |
| WING G | 24 | 115 | 139 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING G | NA | Rs 13.44 cr | Rs 8.87 cr |
| WING F | NA | Rs 5.76 cr | Rs 3.80 cr |
| - | NA | Rs 4.80 cr | Rs 2.35 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Devayani Musale |
| Engineer | Mr Girish Daiya |
| Engineer | Swapnil Longale |
| Chartered Accountant | SARDA & PAREEK LLP |
| Chartered Accountant | M R B & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GeeCee Ventures Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2028
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Mist_Form 2A_signed.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: Form 1 Signed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Signed_Form 2 Mist.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Signed_Form3_Mist.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Mist III Signed.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineering CertificateThe Mist Ph III dtd14012026.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Signed_MIST-III_Withdrawal Application Form3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1_MIST-III_signed.pdf | 19 Oct 2025 |
| Withdrawal Update Form 1File: Withdrawal Application Form1_MIST-III_signed.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: Form2_THE MIST PH-III_Withdrawal Application.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: Form2_THE MIST PH-III_Withdrawal Application.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: MIST-III_Withdrawal Application Form3_signed.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: MIST-III_Withdrawal Application Form3_signed.pdf | 19 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5-MIST-III_SIGNED.pdf | 25 Sep 2025 |
| Withdrawal Update Form 1File: RERA Form-1 The Mist_signed.pdf | 18 Jul 2025 |
| Withdrawal Update Form 2File: Form2_MIST-III_Signed.pdf | 18 Jul 2025 |
| Withdrawal Update Form 3File: RERA Form-3 The MIst Phase III_.pdf | 18 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1 Mar-25_The Mist Ph III.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 054_GEECEE_Form-3_The Mist_Final.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_The Mist Ph III_Signed.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory RERA Mar25 Mist PH 3.pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3_RERA _GeeCee The Mist, Phase III.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Form 2 Engineering Certificate-The Mist Ph III.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mist Ph III_RERA CERTIFICATE 31122024-Signed.pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory_Dec_24_The Mist Ph III.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 of The Mist Ph III.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA - Mist III.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate - The Mist Phase III.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold report_The Mist Ph3.pdf | 19 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosures - The Mist - Phase III.pdf | 9 Jul 2024 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT- THE MIST - PHASE - III.pdf | 26 Jun 2024 |
| Proforma of Agreement for saleFile: Proforma Agreement_for_Sale - The Mist - Phase III - Final.pdf | 26 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - AFS_SIGNED.pdf | 26 Jun 2024 |
| Other - LegalFile: Deed of conveyance 1_1.pdf | 26 Jun 2024 |
| Other - LegalFile: Deed of conveyance 1_2.pdf | 26 Jun 2024 |
| Other - LegalFile: Deed of Conveyance 2.pdf | 26 Jun 2024 |
| Other - LegalFile: FORM 7_12.pdf | 26 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Email of KMC.pdf | 21 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Approval_Email.pdf | 21 Jun 2024 |
| Other - TechnicalFile: 19)DECLARATION CUM UNDERTAKING_SVV.pdf | 19 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: 3b)ENCUMRANCE CERTIFICATE - Finance_Legal.pdf | 13 Jun 2024 |
| Details of encumbrances concerned to LegalFile: 3b)ENCUMRANCE CERTIFICATE - Finance_Legal.pdf | 13 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 CA CERTIFICATE.pdf | 13 Jun 2024 |
| Layout approvalFile: Drawing_2.pdf | 12 Jun 2024 |
| Layout approvalFile: Drawing_3.pdf | 12 Jun 2024 |
| Layout approvalFile: Drawing_4.pdf | 12 Jun 2024 |
| Building plan approvalFile: 9)IOD.pdf | 12 Jun 2024 |
| Layout approvalFile: Drawing_1.pdf | 12 Jun 2024 |
| PAN CardFile: GeeCee Ventures Pan.pdf | 12 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Drawing_1.pdf | 12 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Drawing_2.pdf | 12 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Drawing_3.pdf | 12 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Drawing_4.pdf | 12 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 9)IOD.pdf | 12 Jun 2024 |
| Declaration about Commencement CertificateFile: 12)FORMAT D - DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 12 Jun 2024 |
| Declaration in FORM BFile: 5)FORM B.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1AC Mist Phase III_Updated.pdf | 12 Jun 2024 |
| CERSAI detailsFile: 11b)CERSAI ENCUMRANCE CERTIFICATE.pdf | 12 Jun 2024 |
| Proforma of Allotment letterFile: Draft Allotment Letter.pdf | 12 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 15)FORMAT A decl on separate bank acc.pdf | 12 Jun 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf | 12 Jun 2024 |
| Other - LegalFile: 20)DECALARTION towards utilisation of plot area.pdf | 12 Jun 2024 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PROXIMUSP51800027318 | CHEMBUR, Mumbai Suburban | 37 | Dec 2020 | Completed | Jun 2025 | Mar 2024 |
| Laxmi KunjP51800046721 | JUHU, Mumbai Suburban | - | Sep 2022 | Completed | Dec 2024 | Nov 2024 |
| GeeCee Aspira 206P52000019788 | Navi Mumbai, Raigarh | 149 | Mar 2019 | Completed | Aug 2024Registered original: Aug 2023 | Sep 2023 |
| The Mist Phase IIP52000024728 | Dahiwali T. Waredi, Raigarh | - | Mar 2020 | Completed | Dec 2022 | Aug 2022 |
| The Mist -Phase IP52000007101 | Dahiwali T. Waredi, Raigarh | - | Aug 2017 | Completed | Sep 2020 | Sep 2020 |
| Cloud 36-Phase IIP51700004872 | Ghansoli, Thane | - | Aug 2017 | Completed | Dec 2018 | Jul 2018 |
| Cloud 36 -Phase I | Plot No. 6 Sector 11. Ghansoli Node | 252 | - | Completed | Dec 2018 | Feb 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE MIST - PHASE III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dahiwali T Waredi5,900+ in Raigarh
Filed coordinates, straight-line distance. 144 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: GeeCee Ventures Limited
GeeCee Ventures Limited has 11 registrations on MahaRERA, including Cloud 36 -Phase I and Cloud 36-Phase II. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if THE MIST - PHASE III is delayed beyond 30 Jun 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE MIST - PHASE III?
The registered promoter entity is GeeCee Ventures Limited, a company as per the filing. Its CIN L24249MH1984PLC032170 and GSTIN 27AAACG3914A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE MIST - PHASE III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE MIST - PHASE III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE MIST - PHASE III?
The professionals named in the filing: Architect: Devayani Musale; Engineer: Mr Girish Daiya; Engineer: Swapnil Longale; Chartered Accountant: SARDA & PAREEK LLP; Chartered Accountant: M R B & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE MIST - PHASE III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback