Home / Browse projects / Raigarh, Maharashtra / THE MIST - PHASE III

Registered No litigation declared Others project

THE MIST - PHASE III

By GeeCee Ventures Limited

RG-MH-18306 · RERA P52000077097 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 7 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 97%
134 of 139Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

THE MIST - PHASE III is a Others project by GeeCee Ventures Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000077097 on 23 Jul 2024. Possession is promised by 30 Jun 2028. 5 of the 139 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameTHE MIST - PHASE III
  • TypeOthers
  • Location
    • Konadavane Road
    • Dahiwali T Waredi
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000077097
  • ReraGenie IDRG-MH-18306

Builder

  • NameGeeCee Ventures Limited
  • Entity typeCompany
  • CINL24249MH1984PLC032170
  • GSTIN27AAACG3914A1Z7
  • Non- Executive DirectorRohit Ashwin Kothari
  • Whole - time DirectorsSureshkumar Vasudevan Vazhathara Pillai, Gaurav Shyamsukha
  • Independent DirectorsVallabh Prasad Biyani, Neha Bandyopadhyay, Rupal Vora
  • Other registrations10 more →
  • Completed7 of 11
  • Declared earlier projects7 →

Key dates

this monthRegisteredJul 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Current status

4%5 of 139 units booked
52.9%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING FNA8728735
WING GNA14131040104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 97%.

WING F64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
WING G53%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises56%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed191

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots191
Closed/Covered29
Open Space162
BuildingClosed/CoveredOpen SpaceTotal
WING F54752
WING G24115139

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,911 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on31 May 2025

Approvals and building plan

Sanctioning authorityKARJAT MUNICIPAL COUNCIL
Permissible FSI11000.0
Proposed, not sanctioned8,855 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Limited, Ground Floor, Jehangir Building M G Road, Fort, Mumbai
Estimated costRs 24.00 cr
Cost incurredRs 12.69 cr
Work done52.88%
BuildingWingEstimatedIncurred
WING GNARs 13.44 crRs 8.87 cr
WING FNARs 5.76 crRs 3.80 cr
-NARs 4.80 crRs 2.35 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDevayani Musale
EngineerMr Girish Daiya
EngineerSwapnil Longale
Chartered AccountantSARDA & PAREEK LLP
Chartered AccountantM R B & ASSOCIATES
PartnerRole in project
GeeCee Ventures Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Mist_Form 2A_signed.pdf13 May 2026
Withdrawal Update Form 1File: Form 1 Signed.pdf20 Apr 2026
Withdrawal Update Form 2File: Signed_Form 2 Mist.pdf20 Apr 2026
Withdrawal Update Form 3File: Signed_Form3_Mist.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Mist III Signed.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineering CertificateThe Mist Ph III dtd14012026.pdf20 Jan 2026
Withdrawal Update Form 3File: Signed_MIST-III_Withdrawal Application Form3.pdf20 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1_MIST-III_signed.pdf19 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1_MIST-III_signed.pdf19 Oct 2025
Withdrawal Update Form 2File: Form2_THE MIST PH-III_Withdrawal Application.pdf19 Oct 2025
Withdrawal Update Form 2File: Form2_THE MIST PH-III_Withdrawal Application.pdf19 Oct 2025
Withdrawal Update Form 3File: MIST-III_Withdrawal Application Form3_signed.pdf19 Oct 2025
Withdrawal Update Form 3File: MIST-III_Withdrawal Application Form3_signed.pdf19 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5-MIST-III_SIGNED.pdf25 Sep 2025
Withdrawal Update Form 1File: RERA Form-1 The Mist_signed.pdf18 Jul 2025
Withdrawal Update Form 2File: Form2_MIST-III_Signed.pdf18 Jul 2025
Withdrawal Update Form 3File: RERA Form-3 The MIst Phase III_.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1 Mar-25_The Mist Ph III.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 054_GEECEE_Form-3_The Mist_Final.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_The Mist Ph III_Signed.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory RERA Mar25 Mist PH 3.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3_RERA _GeeCee The Mist, Phase III.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Form 2 Engineering Certificate-The Mist Ph III.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mist Ph III_RERA CERTIFICATE 31122024-Signed.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory_Dec_24_The Mist Ph III.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 of The Mist Ph III.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA - Mist III.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate - The Mist Phase III.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold report_The Mist Ph3.pdf19 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosures - The Mist - Phase III.pdf9 Jul 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT- THE MIST - PHASE - III.pdf26 Jun 2024
Proforma of Agreement for saleFile: Proforma Agreement_for_Sale - The Mist - Phase III - Final.pdf26 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report - AFS_SIGNED.pdf26 Jun 2024
Other - LegalFile: Deed of conveyance 1_1.pdf26 Jun 2024
Other - LegalFile: Deed of conveyance 1_2.pdf26 Jun 2024
Other - LegalFile: Deed of Conveyance 2.pdf26 Jun 2024
Other - LegalFile: FORM 7_12.pdf26 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Email of KMC.pdf21 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Approval_Email.pdf21 Jun 2024
Other - TechnicalFile: 19)DECLARATION CUM UNDERTAKING_SVV.pdf19 Jun 2024
Details of encumbrances concerned to FinanceFile: 3b)ENCUMRANCE CERTIFICATE - Finance_Legal.pdf13 Jun 2024
Details of encumbrances concerned to LegalFile: 3b)ENCUMRANCE CERTIFICATE - Finance_Legal.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 CA CERTIFICATE.pdf13 Jun 2024
Layout approvalFile: Drawing_2.pdf12 Jun 2024
Layout approvalFile: Drawing_3.pdf12 Jun 2024
Layout approvalFile: Drawing_4.pdf12 Jun 2024
Building plan approvalFile: 9)IOD.pdf12 Jun 2024
Layout approvalFile: Drawing_1.pdf12 Jun 2024
PAN CardFile: GeeCee Ventures Pan.pdf12 Jun 2024
Copy of Layout Approval (in case of layout)File: Drawing_1.pdf12 Jun 2024
Copy of Layout Approval (in case of layout)File: Drawing_2.pdf12 Jun 2024
Copy of Layout Approval (in case of layout)File: Drawing_3.pdf12 Jun 2024
Copy of Layout Approval (in case of layout)File: Drawing_4.pdf12 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 9)IOD.pdf12 Jun 2024
Declaration about Commencement CertificateFile: 12)FORMAT D - DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf12 Jun 2024
Declaration in FORM BFile: 5)FORM B.pdf12 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1AC Mist Phase III_Updated.pdf12 Jun 2024
CERSAI detailsFile: 11b)CERSAI ENCUMRANCE CERTIFICATE.pdf12 Jun 2024
Proforma of Allotment letterFile: Draft Allotment Letter.pdf12 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 15)FORMAT A decl on separate bank acc.pdf12 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf12 Jun 2024
Other - LegalFile: 20)DECALARTION towards utilisation of plot area.pdf12 Jun 2024

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PROXIMUSP51800027318CHEMBUR, Mumbai Suburban37Dec 2020CompletedJun 2025Mar 2024
Laxmi KunjP51800046721JUHU, Mumbai Suburban-Sep 2022CompletedDec 2024Nov 2024
GeeCee Aspira 206P52000019788Navi Mumbai, Raigarh149Mar 2019CompletedAug 2024Registered original: Aug 2023Sep 2023
The Mist Phase IIP52000024728Dahiwali T. Waredi, Raigarh-Mar 2020CompletedDec 2022Aug 2022
The Mist -Phase IP52000007101Dahiwali T. Waredi, Raigarh-Aug 2017CompletedSep 2020Sep 2020
Cloud 36-Phase IIP51700004872Ghansoli, Thane-Aug 2017CompletedDec 2018Jul 2018
Cloud 36 -Phase IPlot No. 6 Sector 11. Ghansoli Node252-CompletedDec 2018Feb 2018

How this compares with Raigarh

4%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE MIST - PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahiwali T Waredi5,900+ in Raigarh

2 kmTHE MIST - PHASE IIICompleted 56Lapsed / revoked 42Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 144 registered projects within 2 km.

Builder: GeeCee Ventures Limited

GeeCee Ventures Limited has 11 registrations on MahaRERA, including Cloud 36 -Phase I and Cloud 36-Phase II. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if THE MIST - PHASE III is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE MIST - PHASE III?

The registered promoter entity is GeeCee Ventures Limited, a company as per the filing. Its CIN L24249MH1984PLC032170 and GSTIN 27AAACG3914A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE MIST - PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE MIST - PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE MIST - PHASE III?

The professionals named in the filing: Architect: Devayani Musale; Engineer: Mr Girish Daiya; Engineer: Swapnil Longale; Chartered Accountant: SARDA & PAREEK LLP; Chartered Accountant: M R B & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE MIST - PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE MIST - PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE MIST - PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.