FLORENCE TOWN
RG-MH-10429 · RERA P52000006799 · Last updated on MahaRERA portal: 13 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 72 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
FLORENCE TOWN is a Residential / Group Housing project by BRIGHT DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000006799 on 16 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 72 months from the original filing. 119 of the 360 units on this registration are recorded sold or booked, and 106 of 154 construction stages are filed complete.
At a glance
Project
- NameFLORENCE TOWN
- TypeResidential / Group Housing
- Location
- Diksal
- Karjat
- Raigarh
- 410201
- Pincode410201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000006799
- ReraGenie IDRG-MH-10429
Builder
- NameBRIGHT DEVELOPERS
- Entity typePartnership
- PartnersPARVEZ AHMED FAROOQUI, GOVIND NARSHI KAROTRA
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Aug 2017
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2022)
- Buildings14 building records
- Documents filed101 files
Current status
Figures as on 13 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TYPE 1 WING A | NA | 6 | 6 | 32 | 0 | 32 |
| TYPE 1 WING B | NA | 6 | 4 | 32 | 0 | 32 |
| TYPE 1 WING C | NA | 6 | 4 | 32 | 0 | 32 |
| TYPE 2 WING D | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 2 WING H | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 2 WING I | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 3 WING J | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 3 WING K | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 2 WING L | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 2 WING E | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 2 WING M | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 3 WING N | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 2 WING F | NA | 6 | 4 | 24 | 0 | 24 |
| TYPE 3 WING G | NA | 6 | 4 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building14
As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
106 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Installation of Lifts, at 80%.
TYPE 1 WING A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TYPE 1 WING B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TYPE 1 WING C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TYPE 2 WING D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TYPE 2 WING H91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TYPE 2 WING I91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TYPE 3 WING J91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TYPE 3 WING K89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
TYPE 2 WING L89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
TYPE 2 WING E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TYPE 2 WING M89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
TYPE 3 WING N89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
TYPE 2 WING F91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TYPE 3 WING G91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 75% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed178
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TYPE 1 WING A | 16 | 16 |
| TYPE 1 WING B | 16 | 16 |
| TYPE 1 WING C | 16 | 16 |
| TYPE 2 WING D | 12 | 12 |
| TYPE 2 WING H | 12 | 12 |
| TYPE 2 WING I | 12 | 12 |
| TYPE 3 WING J | 11 | 11 |
| TYPE 3 WING K | 11 | 11 |
| TYPE 2 WING L | 12 | 12 |
| TYPE 2 WING E | 13 | 13 |
| TYPE 2 WING M | 12 | 12 |
| TYPE 3 WING N | 11 | 11 |
| TYPE 2 WING F | 13 | 13 |
| TYPE 3 WING G | 11 | 11 |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MAHADEO BAPU SHELKE | Ambivali T. Wankhal (CT) | Raigarh |
| MARUTI BALU SHELKE | Diksal | Raigarh |
| MAHENDRA SHIVAJI SHELKE | Diksal | Raigarh |
| SAWANT HARICHAND GOURU | Diksal | Raigarh |
| Mahendra Shelke | Diksal | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 3.48 cr | Rs 2.26 cr |
| TYPE 1 WING A | NA | Rs 1.86 cr | - |
| TYPE 1 WING B | NA | Rs 1.86 cr | - |
| TYPE 1 WING C | NA | Rs 1.86 cr | - |
| TYPE 2 WING D | NA | Rs 1.57 cr | Rs 1.57 cr |
| TYPE 2 WING H | NA | Rs 1.57 cr | Rs 1.57 cr |
| TYPE 2 WING I | NA | Rs 1.57 cr | Rs 1.57 cr |
| TYPE 2 WING L | NA | Rs 1.57 cr | Rs 1.57 cr |
| TYPE 2 WING E | NA | Rs 1.57 cr | Rs 1.57 cr |
| TYPE 2 WING M | NA | Rs 1.57 cr | Rs 1.57 cr |
| TYPE 2 WING F | NA | Rs 1.57 cr | Rs 1.57 cr |
| TYPE 3 WING J | NA | Rs 1.51 cr | Rs 1.51 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dharmesh |
| Engineer | Samarth Agarwal |
| Engineer | SHAHAJI TANPURE |
| Engineer | Impact Designerr |
| Chartered Accountant | MANISH |
| Chartered Accountant | CA Rishabh Lodaya |
| Partner | Role in project |
|---|---|
| BRIGHT DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, Maharashtra Real Estate Regulatory Authority (MAHARERA), BKC, Housefin Bhavan, near RBI, E Block, Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra 400051 Subject: - Extension of Project Completion Date for Project “FLORENCE TOWN” (RERA Registration No. P52000006799) Dear Sir/ Madam, We have registered our Project “FLORENCE TOWN” located at Plot bearing / CTS / survey no- 35pt Village -Kanjur, Mumbai Suburban District pin 400078, vide Registration No. P52000006799 With RERA authority in the month of August 2017, we have committed 30 December 2022 as the possession date. Unfortunately,
Reason as filed by the promoterWe are seeking an extension for our project as the development comprises multiple wings. While a major portion of the project specifically Wings D, E, F, G, H, I, and J have been completed and Part Occupation Certificates (Part OCs) have already been obtained for these seven wings, certain remaining wings, namely Wings L, M, N, and K, require additional time to complete the balance construction work in a safe and compliant manner. Furthermore, Wings A, B, and C are still at an early stage of construction and will require a longer duration to reach completion. Due to the slow progress in constr
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2A - AY 25-26.pdf | 13 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1 - MARCH 2026.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: FORM 2 - MARCH 2026.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Florence Town FORM 3 - MARCH 2026.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1 _compressed.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: FLORENCE TOWN - Q3 - FORM 3_compressed.pdf | 6 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A signed.pdf | 15 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Nov25.pdf | 25 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Nov25.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sept 2025.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sept 2025.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: Form 3_Florence Town_June 2025_2.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: Form 3_Florence Town sept.pdf | 25 Nov 2025 |
| Withdrawal Update Form 1File: Form -1 jun 2025.pdf | 24 Nov 2025 |
| Withdrawal Update Form 2File: form 2.pdf | 24 Nov 2025 |
| Withdrawal Update Form 3File: Form 3_Florence Town_June 2025_2.pdf | 24 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Bright Developers_FY2024-25.pdf | 31 Oct 2025 |
| Certificates of CA (Form 3)File: FORM 3_compressed.pdf | 21 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BD Form 1 27-01-25 compressed.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BD Form 1 March 25_compressed.pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BD Form 2 March 25_compressed.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: sold book_compressed.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2a 07012025.pdf | 27 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 signed.pdf | 22 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 signed by Manish Sir_page-0001_page-0001.pdf | 21 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf | 30 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf | 30 Dec 2024 |
| Certificates of CA (Form 3)File: FINAL FORM 3 SIGNEDbright dev.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Bright Dev Form 5 23.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Bright Dev Form 5 22.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Bright Dev Form 5 23.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: Form 3 declaration 1.pdf | 30 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 architect certificate_compressed.pdf | 18 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGG CERTIFICATE_compressed.pdf | 18 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold, unsold_compressed.pdf | 18 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SKMBT samol size.pdf | 12 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: BD encumbrances to legal declaration (1).pdf | 3 Jan 2023 |
| Details of encumbrances concerned to LegalFile: BD encumbrances to legal declaration (1).pdf | 3 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bd form 1 july 22_compressed.pdf | 3 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BD form 2 july 22_compressed.pdf | 3 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bd form 2 dec 2022_compressed.pdf | 3 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BD format A bank acciunt.pdf | 3 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: BD deviated report for allotment.pdf | 3 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: BD deviation report for sake agreement.pdf | 3 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 13 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 13 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14-01-2022 1-3 Form 1 Bright Developers.pdf | 23 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14-01-2022 4-6 Form 1 Bright Developers.pdf | 23 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14-01-2022 7-8 Form 1 Bright Developers.pdf | 23 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14-01-2022 9-10 Form 1 Bright Developers.pdf | 23 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14-01-2022 1-3 Form 2 Bright Developers.pdf | 23 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14-01-2022 4-6 Form 2 Bright Developers.pdf | 23 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14-01-2022 7-11 Form 2 Bright Developers.pdf | 23 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img09034 (2).pdf | 7 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ilovepdf_merged (1) (1).pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Bright Developers FY19 Scan.pdf | 27 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Bright Developers FY20 Scan.pdf | 27 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FLORENCE TOWN Form 1 5 Oct 2020.pdf | 31 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 9th quarter DESTI 04-11-19-min.pdf | 19 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 9th quarter BDFT RCC 4-11-19-min.pdf | 19 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 4th quarter DESTI 11-8-18-min.pdf | 21 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 4th quarter RCC 11-08-2018-min.pdf | 21 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 8th quarter Desti 4-6-19_compressed.pdf | 11 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 for 2nd quarter DESTI 20-11-17_compressed.pdf | 11 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 for 6th quarter DESTI 7-12-18_compressed.pdf | 11 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 8th quarter BDFT RCC 4-6-19.pdf | 11 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 for 2nd quarter RCC 20-11-17.pdf | 11 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 for 6th quarter RCC 7-12-18.pdf | 11 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 11 Jan 2019 |
| Certificates of CA (Form 5)File: Form 5 Sign Bright Developers.pdf | 11 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bright arc cer 1.pdf | 29 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: bright arc cer 2.pdf | 29 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate-ilovepdf-compressed 1_1.pdf | 23 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 6 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architech certificate - Final.pdf | 4 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng certificate - Final.pdf | 4 Jan 2018 |
| Certificates of CA (Form 3)File: C A Certificate 07312017 part 1.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: C A Certificate 07312017 part2.pdf | 31 Jul 2017 |
| Building plan approvalFile: BG_CC.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep FLORENCE TOWN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Diksal5,900+ in Raigarh
Filed coordinates, straight-line distance. 48 registered projects within 2 km.
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
The Destination
DOVE BUILDMART PRIVATE LIMITED
Foothills of Matheran P - 1
HOABL Impactum Land Private Limited
See every Raigarh project, with the district possession charts
Builder: BRIGHT DEVELOPERS
BRIGHT DEVELOPERS has 2 registrations on MahaRERA, including FLORENCE TOWN and PLATINUM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if FLORENCE TOWN is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of FLORENCE TOWN?
The registered promoter entity is BRIGHT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in FLORENCE TOWN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for FLORENCE TOWN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at FLORENCE TOWN?
The professionals named in the filing: Architect: Dharmesh; Engineer: Samarth Agarwal; Engineer: SHAHAJI TANPURE; Engineer: Impact Designerr; Chartered Accountant: MANISH; Chartered Accountant: CA Rishabh Lodaya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FLORENCE TOWN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback