Home / Browse projects / Raigarh, Maharashtra / Foothills of Matheran P - 3

Completed No litigation declared Plotted project

Foothills of Matheran P - 3

By HOABL Impactum Land Private Limited

RG-MH-62816 · RERA P52000046022 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
116 of 174Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Foothills of Matheran P - 3 is a Plotted project by HOABL Impactum Land Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000046022 on 15 Jun 2022. The registration is recorded completed; possession was promised by 30 Jun 2025. 58 of the 174 units on this registration are recorded sold or booked. 2 complaints are on record with the regulator.

At a glance

Project

  • NameFoothills of Matheran P - 3
  • TypePlotted
  • Location
    • MDR Road
    • Near Shilar River
    • pimploli bk
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000046022
  • ReraGenie IDRG-MH-62816

Builder

  • NameHOABL Impactum Land Private Limited
  • Entity typeCompany
  • CINU70109MH2022PTC374991
  • DirectorsRakesh Gupta, Sagar Gawde, Rakesh Gupta
  • Other registrations7 more →
  • Completed4 of 8
  • Declared earlier projects16 →

Key dates

this monthRegisteredJun 2022PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jun 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed85 files

Current status

33%58 of 174 units booked
38.4%Work done, per cost certificate

Figures as on 30 Sep 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes98%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes75%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
COMPOUND WALLYes40%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area114,458 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024

Approvals and building plan

Permissible FSI112638.0
Proposed, not sanctioned75,092 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVeer Mahal CHS Ltd, shop 9,10 and 11 ground floor,Dr Babasaheb mabedkar road, lalbaug, Mumbai, 400012
Estimated costRs 19.22 cr
Cost incurredRs 7.38 cr
Work done38.42%
BuildingWingEstimatedIncurred
-NARs 19.22 crRs 7.38 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Jain
EngineerSwapnil Jadhav
EngineerAkil Ahmad
Chartered AccountantChirag Sarvaiya
Chartered AccountantU S MISHRA AND ASSOCIATES
PartnerRole in project
HOABL Impactum Land Private Limited-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12601794Nikesh ShrivastavaHOABL Impactum Land Private Limited27/03/2026
SM12600437Bhakti AchrekarHOABL Impactum Land Private Limited28/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jun 2024

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5_FHOM P3 - 2024-25.pdf30 Sep 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 13 Foothills of Matheran P3_Form 5_promoter signed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 13 Foothills of Matheran P3_Form 5_promoter signed.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Neral -MLP Completion Letter.pdf28 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Foothills of Matheran_P3.pdf28 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Foothills of Matheran_P3.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Foothills of Matheran P - 3.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Neral FHOM P3 OND23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Neral FHOM P3 OND23.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Foothills of Matheran P3.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: H_Impactum_P3.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FHOM P3.pdf22 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 3 Impactum Lands Neral.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FHOM P3.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 3 Impactum Lands Neral.pdf17 Oct 2023
OtherFile: Letter_P3.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5_FHOMph3.pdf1 Oct 2023
Disclosure of sold/ booked inventoryFile: Neral Phase 3.pdf14 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_3.pdf18 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3_compressed.pdf9 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_03_compressed.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_P3.pdf21 Jul 2023
Details of encumbrancesFile: HI Financial Encumbrances - P-3.pdf1 Jun 2023
PAN CardFile: PAN_HOABL IMPACTUM.pdf30 May 2023
OtherFile: Name change letter_Hoabl Impactum.pdf4 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC P3.pdf31 Jan 2023
Proforma of Agreement for saleFile: uploaded AFS_neral (1).pdf20 Jan 2023
OtherFile: Declaration and COI.pdf27 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate P-3.pdf26 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_P3_compressed.pdf26 Dec 2022
Layout approvalFile: NeralLayoutsMerged.pdf21 Sep 2022
Copy of Layout Approval (in case of layout)File: NeralLayoutsMerged.pdf21 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-1-2.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-3-4.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-3-6.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-7-8.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-9-10.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-11-12.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-12-14.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-15-16.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-17-18.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-19-20.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-21-22.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-23-24.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-25-26.pdf19 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 20220825 PIMPLOLI NA ORDER_NERAL_compressed-27-28.pdf19 Sep 2022
Layout approvalFile: Provisional Plan P3 07072022.pdf8 Jul 2022
Details of encumbrancesFile: encumbrance certificate_ 07072022-3.pdf8 Jul 2022
Copy of Layout Approval (in case of layout)File: Provisional Plan P3 07072022.pdf8 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: NA Order Compressed part 1.pdf3 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: NA Order Compressed part 2.pdf3 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: NA Order Compressed Part 3.pdf3 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: NA Declaration.pdf3 Jun 2022
Layout approvalFile: NA Declaration.pdf1 Jun 2022
Layout approvalFile: NA Plan Compressed 1.pdf1 Jun 2022
Building plan approval or NA orderFile: NA Order Compressed part 1.pdf1 Jun 2022
Building plan approval or NA orderFile: NA Order Compressed part 2.pdf1 Jun 2022
Building plan approval or NA orderFile: NA Order Compressed Part 3.pdf1 Jun 2022
Layout approvalFile: 2022 06 01_NE_Phase-3.pdf1 Jun 2022
PAN CardFile: Impactum PAN.pdf1 Jun 2022
Copy of the legal title reportFile: Title P1.pdf1 Jun 2022
Copy of the legal title reportFile: Title P2.pdf1 Jun 2022
Copy of the legal title reportFile: Title P3.pdf1 Jun 2022
Details of encumbrancesFile: Encumbrance P3.pdf1 Jun 2022
Copy of Layout Approval (in case of layout)File: NA Plan Compressed 1.pdf1 Jun 2022
Copy of Layout Approval (in case of layout)File: 2022 06 01_NE_Phase-3.pdf1 Jun 2022
Copy of Layout Approval (in case of layout)File: NA Declaration.pdf1 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order Compressed part 1.pdf1 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order Compressed part 2.pdf1 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order Compressed Part 3.pdf1 Jun 2022
Declaration about Commencement CertificateFile: CC Decalaration.pdf1 Jun 2022
Declaration in FORM BFile: Form B P3.pdf1 Jun 2022
CERSAI detailsFile: 133 1 2.pdf1 Jun 2022
CERSAI detailsFile: 133 3 to 40.pdf1 Jun 2022
CERSAI detailsFile: 133 41 to 80.pdf1 Jun 2022
CERSAI detailsFile: 133 81 to 120.pdf1 Jun 2022
CERSAI detailsFile: 133 121 to 150.pdf1 Jun 2022

How this compares with Raigarh

33%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Foothills of Matheran P - 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Shilar River5,900+ in Raigarh

2 kmFoothills of Matheran P Completed 5Lapsed / revoked 28Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: HOABL Impactum Land Private Limited

HOABL Impactum Land Private Limited has 8 registrations on MahaRERA, including Foothills of Matheran P - 1 and Foothills of Matheran P - 2. Its filings disclose 16 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Foothills of Matheran P - 3 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Foothills of Matheran P - 3?

The registered promoter entity is HOABL Impactum Land Private Limited, a company as per the filing. Its CIN U70109MH2022PTC374991 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Foothills of Matheran P - 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Foothills of Matheran P - 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Foothills of Matheran P - 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Foothills of Matheran P - 3?

The professionals named in the filing: Architect: Sanjay Jain; Engineer: Swapnil Jadhav; Engineer: Akil Ahmad; Chartered Accountant: Chirag Sarvaiya; Chartered Accountant: U S MISHRA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Foothills of Matheran P - 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Foothills of Matheran P - 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Foothills of Matheran P - 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.