The Address by GS Bandra Tower D

By TEN X Realty Limited

RG-MH-07499 · RERA P51800066457 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • Rs 780.00 crore secured on the land, in favour of Bank of Maharashtra, Standard Chartered Bank

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 60%
81 of 132Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

The Address by GS Bandra Tower D is a Residential / Group Housing project by TEN X Realty Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800066457 on 5 Jun 2024. Possession is promised by 31 Jan 2030. 51 of the 132 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Address by GS Bandra Tower D
  • TypeResidential / Group Housing
  • Location
    • Western Express Highway
    • Nirmal Nagar
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • RERA no.P51800066457
  • ReraGenie IDRG-MH-07499

Builder

  • NameTEN X Realty Limited
  • Entity typeCompany
  • DirectorHarmohan Harminder SAHNI
  • Other registrations12 more →
  • Declared earlier projects10 →

Key dates

this monthRegisteredJun 2024PromisedJan 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2024
  • Promised completion31 Jan 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed128 files

Current status

39%51 of 132 units booked
24.9%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Address by GS Bandra Tower D - As per IOA Plan Tower 4NA27231320132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 60%.

The Address by GS Bandra Tower D - As per IOA Plan Tower 4: 5% average across the applicable activities

ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered144

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area13,698 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofBank of Maharashtra, Standard Chartered Bank
Secured amountRs 780.00 crore
CERSAI search filedYes
Declared on24 Jun 2026
LandownerVillageDistrict
CRD Realtors Pvt LtdBandraMumbai Suburban
Nirmal Nagar 1 CHS Association LtdBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI12045.75
Proposed, not sanctioned12,046 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMahabank Building Plot No-37,Wagle Industrial Estate Thane 400604
Estimated costRs 119.82 cr
Cost incurredRs 29.83 cr
Work done24.89%
BuildingWingEstimatedIncurred
The Address by GS Bandra Tower D - As per IOA Plan Tower 4NARs 91.57 crRs 20.67 cr
-NARs 28.25 crRs 9.15 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMitie Designers and Planners Pvt Ltd
EngineerEngineering Creations Consultancy I Pvt Ltd
EngineerVijay Narayan Joshi
Chartered AccountantNiraj Sanghavi & Associates
Chartered AccountantChaturvedi & Shah LLP
PartnerRole in project
TEN X Realty Limited-

Litigation declared4

CaseCourtStatus
1369/2022City Civil Court DindoshiClosed
1184/2022City Civil Court DindoshiClosed
3204/2023City Civil Court DindoshiClosed
3205/2023City Civil Court DindoshiClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2030

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: TOWER D.pdf26 Jun 2026
Withdrawal Update Form 1File: THE Address by GS Bandra Tower D.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 Tower D Mar 26.pdf11 May 2026
Withdrawal Update Form 3File: Form 3 RERA - The Address By GS Bandra Tower D Mar 26.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 Tower D Dec 25.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 Tower D Dec 25.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Tower D Dec 25.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Tower D Dec 25.pdf23 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 Tower E Dec 25 Certificate Number 386 signed.pdf23 Jan 2026
Withdrawal Update Form 3File: RERA Form 3 Tower E Dec 25 Certificate Number 386 signed.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 Tower D.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 Tower D.pdf29 Oct 2025
Withdrawal Update Form 3File: Tower D - Certificate Number 238.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: Signed Form 5 Tower D RERA Upload.pdf29 Sep 2025
Form 1File: FORM 1 RERA TD.pdf21 Jul 2025
Form 2File: form 2.pdf21 Jul 2025
Form 3File: form 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf21 Jul 2025
Form 2A (FY 2024-2025)File: TOWER D.pdf17 Jul 2025
Form 1File: Form 1 Tower D.pdf1 Jul 2025
Form 2File: Form 2 Bandra - Tower D.pdf1 Jul 2025
Form 3File: RERA Form 3 - Queens Court Tower D - Certificate Number 8 signed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Bandra Tower D.pdf1 Jul 2025
Disclosure of sold/ booked inventoryFile: Bandra Tower D.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Queens Court Tower D - Certificate Number 8 signed.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower D.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bandra - Tower D.pdf17 Apr 2025
Building plan approvalFile: TOWER D TYPICAL FLOOR- 1 OF 2.pdf27 Jan 2025
Building plan approvalFile: TOWER D TYPICAL FLOOR- 2 OF 2 (1).pdf27 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: TOWER D TYPICAL FLOOR- 1 OF 2.pdf27 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: TOWER D TYPICAL FLOOR- 2 OF 2 (1).pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: The Address by GS Bandra Tower D.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 The Address By GS Bandra Tower D.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Address By GS Bandra Tower D.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Address By GS Bandra Tower D.pdf15 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: Bandra Tower D.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower D.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RERA - Tower D.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 TOWER -D.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Queens Court Tower D - Certificate Number 101.pdf13 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration of separate bank.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD TOWER D BANDRA.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA - Bandra Tower D.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1_Tower D.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2_Tower D.pdf12 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Resolution Prashant Rathod.pdf28 May 2024
Other - FinanceFile: DECLARATION.pdf28 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1.pdf22 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2.pdf22 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3.pdf22 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 4.pdf22 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 5.pdf22 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - Queens Court Tower D - Certificate Number 44.pdf14 May 2024
Details of encumbrances concerned to FinanceFile: financial encumbrances.pdf13 May 2024
Details of encumbrances concerned to LegalFile: financial encumbrances.pdf13 May 2024
CERSAI detailsFile: cersai.pdf13 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank account declaration.pdf13 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 10078_furthercc_signed.pdf10 May 2024
Declaration about Commencement CertificateFile: CC DECLARATION.pdf10 May 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf10 May 2024
Proforma of Agreement for saleFile: BANDRA AFS FINAL.pdf10 May 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: 1.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: 2.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: 3.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: 4.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: 5.pdf10 May 2024
Deviation Report with respect to model copy of AgreementFile: 6.pdf10 May 2024
Other - TechnicalFile: DECLARATION.pdf10 May 2024
Building plan approvalFile: 2IOA MERGED.pdf18 Mar 2024
Building plan approvalFile: 3 1ST BASEMENT FLR PLAN compressed.pdf18 Mar 2024
Building plan approvalFile: 4 2ND BASEMENT FLR PLAN_compressed.pdf18 Mar 2024
Building plan approvalFile: 5 3RD BASEMENT FLR PLAN_compressed.pdf18 Mar 2024
Building plan approvalFile: 15- GRND FLOOR -SALE_compressed.pdf18 Mar 2024
Building plan approvalFile: Typical floor plan_compressed.pdf18 Mar 2024
Building plan approvalFile: 16- 1st FLOOR POCKET TERRACE -SALE_compressed.pdf18 Mar 2024
Building plan approvalFile: SECTION PLAN.pdf18 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 2IOA MERGED.pdf18 Mar 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
The Address by GS Bandra Tower CP51800054828Nirmal Nagar, Mumbai Suburban90Feb 2024OngoingJan 2030Not due yet
The Address by GS Bandra Tower BP51800054846Nirmal Nagar, Mumbai Suburban133Feb 2024OngoingJan 2030Not due yet
The Address by GS Bandra Tower AP51800054847Nirmal Nagar, Mumbai Suburban90Feb 2024OngoingJan 2030Not due yet

How this compares with Mumbai Suburban

39%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Address by GS Bandra Tower D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nirmal Nagar6,700+ in Mumbai Suburban

Builder: TEN X Realty Limited

TEN X REALTY LIMITED has 13 registrations on MahaRERA, including The Address by GS Bandra Tower A and The Address by GS Bandra Tower B. Its filings disclose 10 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if The Address by GS Bandra Tower D is delayed beyond 31 Jan 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Address by GS Bandra Tower D?

The registered promoter entity is TEN X Realty Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Address by GS Bandra Tower D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Address by GS Bandra Tower D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Address by GS Bandra Tower D?

The professionals named in the filing: Architect: Mitie Designers and Planners Pvt Ltd; Engineer: Engineering Creations Consultancy I Pvt Ltd; Engineer: Vijay Narayan Joshi; Chartered Accountant: Niraj Sanghavi & Associates; Chartered Accountant: Chaturvedi & Shah LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Address by GS Bandra Tower D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Address by GS Bandra Tower D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Address by GS Bandra Tower D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.