Home / Browse projects / Mumbai Suburban, Maharashtra / Kalpataru Magnus
Kalpataru Magnus
By Kalpataru Properties Pvt. Ltd.
RG-MH-11889 · RERA P51800004029 · Last updated on MahaRERA portal: 2 Jan 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 11 cases
- 47 complaints at MahaRERA
- Completion date moved by 21 months
- 2 extensions taken
- Rs 252.84 crore secured on the land, in favour of HDFC Bank Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kalpataru Magnus is a Residential / Group Housing project by Kalpataru Properties Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004029 on 7 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 21 months from the original filing. 201 of the 364 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 47 complaints are on record with the regulator.
At a glance
Project
- NameKalpataru Magnus
- TypeResidential / Group Housing
- Location
- Nanasaheb Dharmadhikari Road
- Bandra Kurla Complex
- Andheri
- Mumbai Suburban
- 400051
- Pincode400051
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800004029
- ReraGenie IDRG-MH-11889
Builder
- NameKalpataru Properties Pvt. Ltd.
- Entity typeCompany
- CINU41000MH1975PTC018371
- GSTIN27AAACK1975H1ZG
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorImtiaz Kanga
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Aug 2017
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Jun 2024)
- Buildings1 building record
- Documents filed175 files
Current status
Figures as on 2 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A, B and C | NA | 34 | 30 | 364 | 0 | 364 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
Wing A, B and C: 84% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 82% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 86% |
Progress on shared amenities15
As on 2 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 76% |
| Landscaping & Tree Planting | Yes | 43% |
| Street Lighting | Yes | 40% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 75% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 96% |
| Aggregate area of recreational Open Space | Yes | 55% |
| Open Parking | Yes | 0% |
Parking filed1037
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A, B and C | NA | Rs 336.20 cr | Rs 301.19 cr |
| - | NA | Rs 96.24 cr | Rs 81.23 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jethe & Associates |
| Architect | Sanjay Puri Architects |
| Architect | Atul Gulati |
| Engineer | Pravin Gala Consultants Pvt Ltd |
| Engineer | Kaustubh Kalkar |
| Engineer | Dhanwanti Baikar |
| Engineer | Rupesh Jagtap |
| Chartered Accountant | C.R Mohnot & Co. |
| Chartered Accountant | kkc & associates llp |
| Partner | Role in project |
|---|---|
| Kalpataru Properties Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterApplication for Extension of Project Completion Date under Section 6 of the Real Estate (Regulation and Development) Act, 2016 (RERA Act 2016) At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 30th June, 2023 In the meantime, MahaRERA vide Order Nos. 13/2020 read with 14/2020 dated 2nd April 2020 and 18th May 2020 respectively, has already revised project validity for all the projects whose completion dates expire on or after 15th March 2020, by a period of twelve (12) months. The Orders further specify that the aforesaid extension will b
Reason as filed by the promoterIt may be noted that the Promoter is developing a redevelopment project in the name and style of ‘Kalpataru Magnus’, situated at Bandra, Mumbai (“said Project”). The said project comprises of three (3) buildings/wings viz. wings A to C along with various common amenities and facilities which is being constructed on a piece of land bearing Survey No. 341 (Part) and CTS No. 629 (pt) at Village Bandra, MIG Colony, Gandhi Nagar, Bandra East, Mumbai - 400 051 (“said Property”). The Maharashtra Housing and Area Development Authority (“MHADA”) is the owner and the lessor of the said Property, which h
Litigation declared11
| Case | Court | Status |
|---|---|---|
| 1110/2015 | Bombay High Court | Pending |
| 22/2016 | National Green Tribunal Pune | Disposed of |
| 23/2016 | National Green Tribunal Pune | Pending |
| 710 Lodging No 2100/2016/2017 | Bombay High Court | Pending |
| 2262/2016 | Lokayukta | Pending |
| 2292/2016 | Lokayukta | Pending |
| 2266/2016 | Lokayukta | Pending |
| 1679 of 2017 Lodging No 818 of 2017/2017 | Bombay High Court | Pending |
| 1433/2016 | Lokayukta | Pending |
| 2292/2016 | Lokayukta | Pending |
| 11/2018 | Deputy Collector Appeals MSD | Pending |
Complaints filed with MahaRERA47
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000199114 | Sandipan Bhattacharyya | Kalpataru Properties Private Limited | 22/11/2021 |
| CC006000000292707 | Ajay Singhal | Kalpataru Properties Private Limited | 18/09/2022 |
| CC006000000396190 | Pratap Madhavrao Phad | Kalpataru Properties Pvt. Ltd. | 06/07/2023 |
| CC006000000397600 | Biswajeet Mohanty | KALPATARU PROPERIES PVT LIMITED | 27/09/2023 |
| CC006000000397611 | Shilpa Bhan | Kalpataru Properties Private Limited | 03/10/2023 |
| CC006000000408264 | Ashish Rai | Kalpataru Properties Private Limited | 27/11/2023 |
| CC006000000408374 | Ketki Bapat | Kalpataru Properties Private Limited | 06/12/2023 |
| CC006000000408411 | Jairam Krishnamurthy | Kalpataru Properties Private Limited | 14/12/2023 |
| CC006000000428769 | Prashant Dhanraj Kothari | Kalpataru Properties Pvt. Ltd. | 08/01/2024 |
| CC006000000428777 | Ramdoss Seetharaman | Kalpataru Properties Private Limited | 15/01/2024 |
| CC006000000429118 | Dhruv Shetty | Kalpatru Properties Private Limited | 05/02/2024 |
| CC006000000429223 | Jayesh Visaria | Kalpataru Properties Private Limited | 13/02/2024 |
| CC006000000429304 | Mayank Kabra | Kalpataru Properties Pvt. Ltd. | 19/02/2024 |
| CC006000000479890 | Sanjay Mukadam | Kalpataru Properties Private Limited | 10/04/2024 |
| CC006000000480040 | Kusum Agrawal | Kalpataru Properties Private Limited | 13/04/2024 |
| CC006000000480051 | Vishal Chavan | Kalpataru Properties Private Limited | 12/04/2024 |
| CC006000000480283 | Atul Nargund | Kalpataru Properties Private Limited | 08/05/2024 |
| CC006000000590994 | Amit Pradeep Agarwal | Kalpataru Properties Private Limited | 02/07/2024 |
| CC006000000590996 | Nisheeth Khare | Kalpataru Properties Private Limited | 02/07/2024 |
| CC006000000591251 | Ankur Bhajanka | Kalpataru Properties Private Limited | 20/07/2024 |
| CC006000000591252 | Ankur Bhajanka | Kalpataru Properties Private Limited | 20/07/2024 |
| CC12400245 | Gulzar Govewalla | Kalpataru Properties Pvt. Ltd. | 27/09/2024 |
| CC12400422 | JIMMY JAIN | Kalpataru Properties Pvt. Ltd. | 16/10/2024 |
| CC12500354 | MOHIT OMPRAKASH AGARWAL | Kalpataru Properties Pvt. Ltd. | 01/02/2025 |
| CC12500789 | Rounak Dhirajlal Shah | Kalpataru Properties Pvt. Ltd. | 08/03/2025 |
| CC12501044 | Piyush Agrawal | Kalpataru Properties Pvt. Ltd. | 28/03/2025 |
| CC12501047 | Vinod Agrawal | Kalpataru Properties Pvt. Ltd. | 28/03/2025 |
| CC12501377 | Sonia Gandhi | Kalpataru Properties Pvt. Ltd. | 25/04/2025 |
| CC12501504 | Nedamangalam Vasudevan Chandramouli | Kalpataru Properties Pvt. Ltd. | 06/05/2025 |
| CC12501886 | Manish Sarda | Kalpataru Properties Pvt. Ltd. | 10/06/2025 |
| CC12501858 | Kalpataru Properties Pvt. Ltd. | JAYESH VISARIA | 06/06/2025 |
| CC12502123 | Swapnil Kant Neeraj | Kalpataru Properties Pvt. Ltd. | 28/06/2025 |
| CC12502299 | Riddhi Vinod Shah | Kalpataru Properties Pvt. Ltd. | 07/07/2025 |
| CC12502302 | Kalpataru Properties Pvt. Ltd. | Mr Biswajeet Mohanty and Mrs Rekha Mohanty | 08/07/2025 |
| CC12502854 | Suruchi Mundhra | Kalpataru Properties Pvt. Ltd. | 14/08/2025 |
| CC12503755 | Sandeep Shastri | Kalpataru Properties Pvt. Ltd. | 27/10/2025 |
| CC12503560 | Biswajeet Mohanty | Kalpataru Properties Pvt. Ltd. | 07/10/2025 |
| CC12503674 | Rajaram Narayanan | Kalpataru Properties Pvt. Ltd. | 15/10/2025 |
| CC12503750 | Rajesh Sethuraman | Kalpataru Properties Pvt. Ltd. | 27/10/2025 |
| CC12503966 | Ankit Sonkhiya | Kalpataru Properties Pvt. Ltd. | 12/11/2025 |
| CC12600379 | Kalpataru Properties Pvt. Ltd. | Sonia Gandhi | 20/01/2026 |
| CC12600738 | Peeyush Pallav | Kalpataru Properties Pvt. Ltd. | 09/02/2026 |
| CC12601482 | Priya Bhutra | Kalpataru Properties Pvt. Ltd. | 17/03/2026 |
| CC12601784 | Shankar Chandrasekaran | Kalpataru Properties Pvt. Ltd. | 27/03/2026 |
| CC12602462 | Nilima Parmar | Kalpataru Properties Pvt. Ltd. | 27/04/2026 |
| CC12602760 | Kalpataru Properties Pvt. Ltd. | Swapnil Kant Neeraj | 12/05/2026 |
| CC12603776 | Kalpataru Properties Limited | payal jayanti parmar | 18/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jan 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed175
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 175 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: FULL OCC (1).pdf | 2 Jan 2026 |
| Occupational CertificateFile: Drawing 1.pdf | 2 Jan 2026 |
| Occupational CertificateFile: Drawing 2.pdf | 2 Jan 2026 |
| Occupational CertificateFile: Drawing 3.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: Magnus AC.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: Magnus AC.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: Magnus EC.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: Magnus EC.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate Magnus Sept 2025.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate Magnus Sept 2025.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: Magnus AC.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Magnus EC.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Magnus Final.pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: Kalpataru Magnus.pdf | 22 Sep 2025 |
| Form 2A (FY 2024-2025) | 30 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf | 21 Apr 2025 |
| Certificates of CA (Form 3)File: CA Certificate Magnus Mar 2025.pdf | 21 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus.pdf | 21 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus AC.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Magnus.pdf | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus EC.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Magnus.pdf | 20 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: MIG V Full CC DT.pdf | 11 Nov 2024 |
| Declaration about Commencement CertificateFile: Magnus 11112024.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Magnus.pdf | 30 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf | 21 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: CA Certificate Magnus Sept 2024.pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Magnus.pdf | 11 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Magnus.pdf | 6 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf | 20 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: CA Certificate Magnus June 24.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: K Magnus.pdf | 14 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Magnus.pdf | 3 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kalpataru Magnus.pdf | 20 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kalpataru Magnus.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: Magnus -Ca Certificate - 31 March 2024.pdf | 20 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: MIG CC.pdf | 14 Feb 2024 |
| Declaration about Commencement CertificateFile: Kalpataru Magnus 3.pdf | 14 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus (Final).pdf | 13 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATEFEB2021 Mag.pdf | 13 Feb 2024 |
| Certificates of CA (Form 3)File: Mag Ca.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: K Magnus.pdf | 30 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: K Magnus.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: K Magnus.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: magnus dec23ca certificate.pdf | 19 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_MIG V Dec 2017.pdf | 28 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE MIG V (MAGNUS) dec 2017.pdf | 28 Dec 2023 |
| Certificates of CA (Form 3)File: Kalpataru Magnus Dec 2017.pdf | 28 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: K Magnus Mar22.pdf | 26 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: K Magnus June22.pdf | 26 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: K Magnus Sept22.pdf | 26 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: K Magnus Dec22.pdf | 26 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus Jan 2019.pdf | 13 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus april 2019.pdf | 13 Dec 2023 |
| Certificates of CA (Form 3)File: Kalpataru Magnus March 22.pdf | 13 Dec 2023 |
| Certificates of CA (Form 3)File: Kalpataru Magnus June 2022.pdf | 13 Dec 2023 |
| Certificates of CA (Form 3)File: CA Certificate -Kalpataru Magnus sep 22.pdf | 13 Dec 2023 |
| Certificates of CA (Form 3)File: Kalpataru Magnus Dec21.pdf | 13 Dec 2023 |
| Declaration about Commencement CertificateFile: Magnus 3.pdf | 12 Dec 2023 |
| Certificates of CA (Form 3)File: CA certificate - Kalpataru Magnus - Feb to July 2020.pdf | 12 Dec 2023 |
| Certificates of CA (Form 3)File: CA Certificate - Kalpataru Magnus - Nov 2020.pdf | 12 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG Sept 2017.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ENGCERTIFICATE MIG V (MAGNUS).pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ENGCERTIFICATE MIG V (MAGNUS).pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificateMIG V.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: migv.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_MIG-V.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: migv311018.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: magnus.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG V.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus FEB 2020.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus Jan 2020.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG -V ( Final) Nov 2020.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG V May 2021.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG-V June 2021.pdf | 11 Dec 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Kalpataru Splendour Wing A, B, C, D, E, F, G, H, I | Village Wakad Tal Mulshi Near Datta Mandir Dist Pune 411057 | 297 | Completed | Dec 2015 | Late, Jul 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 175 filed documents as one ZIP, foldered, with a manifest
Keep Kalpataru Magnus on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bandra Kurla Complex6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 137 registered projects within 2 km.
12 PEGASUS
Jayant Enterprises S N Project
Plotted Development Scheme at Sindhudurhnagari
MAHARASHTRA HOUSING AND AREA DEVELOPMENT A
SAJAY AVENUE 18
Vinca Realtors Private Limited
Sahakar excel Acropolis - I
EXCEL ENTERPRISES REALTY LLP
ADDRESS 51
V LAXMI EKTA DEVELOPERS LLP
Agrawals Phoenix
Rosate Estates Pvt Ltd
See every Mumbai Suburban project, with the district possession charts
Builder: Kalpataru Properties Pvt. Ltd.
Kalpataru Properties Pvt. Ltd. has 1 registration on MahaRERA, including Kalpataru Magnus. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Kalpataru Magnus is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kalpataru Magnus?
The registered promoter entity is Kalpataru Properties Pvt. Ltd., a company as per the filing. Its CIN U41000MH1975PTC018371 and GSTIN 27AAACK1975H1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kalpataru Magnus?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Kalpataru Magnus?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Kalpataru Magnus?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kalpataru Magnus?
The professionals named in the filing: Architect: Jethe & Associates; Architect: Sanjay Puri Architects; Architect: Atul Gulati; Engineer: Pravin Gala Consultants Pvt Ltd; Engineer: Kaustubh Kalkar; Engineer: Dhanwanti Baikar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kalpataru Magnus?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback