ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Kalpataru Magnus

Completed Litigation declared Residential / Group Housing project

Kalpataru Magnus

By Kalpataru Properties Pvt. Ltd.

RG-MH-11889 · RERA P51800004029 · Last updated on MahaRERA portal: 2 Jan 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 11 cases
  • 47 complaints at MahaRERA
  • Completion date moved by 21 months
  • 2 extensions taken
  • Rs 252.84 crore secured on the land, in favour of HDFC Bank Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 90%
163 of 364Units unsoldnot recorded sold or booked
47Complaints at MahaRERAon this registration
Jump to the 175 documents Report an error

Kalpataru Magnus is a Residential / Group Housing project by Kalpataru Properties Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004029 on 7 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 21 months from the original filing. 201 of the 364 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 47 complaints are on record with the regulator.

At a glance

Project

  • NameKalpataru Magnus
  • TypeResidential / Group Housing
  • Location
    • Nanasaheb Dharmadhikari Road
    • Bandra Kurla Complex
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004029
  • ReraGenie IDRG-MH-11889

Builder

  • NameKalpataru Properties Pvt. Ltd.
  • Entity typeCompany
  • CINU41000MH1975PTC018371
  • GSTIN27AAACK1975H1ZG
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorImtiaz Kanga
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJun 2024Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2017
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed175 files

Current status

55%201 of 364 units booked
88.4%Work done, per cost certificate

Figures as on 2 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A, B and CNA34303640364

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Wing A, B and C: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.86%

Progress on shared amenities15

As on 2 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes76%
Landscaping & Tree PlantingYes43%
Street LightingYes40%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes96%
Aggregate area of recreational Open SpaceYes55%
Open ParkingYes0%

Parking filed1037

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,037
Closed/Covered1,000
Open Space37

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area9,054 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHDFC Bank Limited
Secured amountRs 252.84 crore
CERSAI search filedYes
Declared on29 May 2025

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI51796.82
Proposed, not sanctioned49,247 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManeckji Wadia Bldg, Ground Floor, Nanik Motwani Marg, Fort, Mumbai - 400001
Estimated costRs 432.44 cr
Cost incurredRs 382.42 cr
Work done88.43%
BuildingWingEstimatedIncurred
Wing A, B and CNARs 336.20 crRs 301.19 cr
-NARs 96.24 crRs 81.23 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJethe & Associates
ArchitectSanjay Puri Architects
ArchitectAtul Gulati
EngineerPravin Gala Consultants Pvt Ltd
EngineerKaustubh Kalkar
EngineerDhanwanti Baikar
EngineerRupesh Jagtap
Chartered AccountantC.R Mohnot & Co.
Chartered Accountantkkc & associates llp
PartnerRole in project
Kalpataru Properties Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800016792Jun 2024 → Jun 2025

Reason as filed by the promoterApplication for Extension of Project Completion Date under Section 6 of the Real Estate (Regulation and Development) Act, 2016 (RERA Act 2016) At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 30th June, 2023 In the meantime, MahaRERA vide Order Nos. 13/2020 read with 14/2020 dated 2nd April 2020 and 18th May 2020 respectively, has already revised project validity for all the projects whose completion dates expire on or after 15th March 2020, by a period of twelve (12) months. The Orders further specify that the aforesaid extension will b

EA12062501550Jun 2024 → Mar 2026

Reason as filed by the promoterIt may be noted that the Promoter is developing a redevelopment project in the name and style of ‘Kalpataru Magnus’, situated at Bandra, Mumbai (“said Project”). The said project comprises of three (3) buildings/wings viz. wings A to C along with various common amenities and facilities which is being constructed on a piece of land bearing Survey No. 341 (Part) and CTS No. 629 (pt) at Village Bandra, MIG Colony, Gandhi Nagar, Bandra East, Mumbai - 400 051 (“said Property”). The Maharashtra Housing and Area Development Authority (“MHADA”) is the owner and the lessor of the said Property, which h

Litigation declared11

CaseCourtStatus
1110/2015Bombay High CourtPending
22/2016National Green Tribunal PuneDisposed of
23/2016National Green Tribunal PunePending
710 Lodging No 2100/2016/2017Bombay High CourtPending
2262/2016LokayuktaPending
2292/2016LokayuktaPending
2266/2016LokayuktaPending
1679 of 2017 Lodging No 818 of 2017/2017Bombay High CourtPending
1433/2016LokayuktaPending
2292/2016LokayuktaPending
11/2018Deputy Collector Appeals MSDPending

Complaints filed with MahaRERA47

Case no.ComplainantRespondentFiled
CC006000000199114Sandipan BhattacharyyaKalpataru Properties Private Limited22/11/2021
CC006000000292707Ajay SinghalKalpataru Properties Private Limited18/09/2022
CC006000000396190Pratap Madhavrao PhadKalpataru Properties Pvt. Ltd.06/07/2023
CC006000000397600Biswajeet MohantyKALPATARU PROPERIES PVT LIMITED27/09/2023
CC006000000397611Shilpa BhanKalpataru Properties Private Limited03/10/2023
CC006000000408264Ashish RaiKalpataru Properties Private Limited27/11/2023
CC006000000408374Ketki BapatKalpataru Properties Private Limited06/12/2023
CC006000000408411Jairam KrishnamurthyKalpataru Properties Private Limited14/12/2023
CC006000000428769Prashant Dhanraj KothariKalpataru Properties Pvt. Ltd.08/01/2024
CC006000000428777Ramdoss SeetharamanKalpataru Properties Private Limited15/01/2024
CC006000000429118Dhruv ShettyKalpatru Properties Private Limited05/02/2024
CC006000000429223Jayesh VisariaKalpataru Properties Private Limited13/02/2024
CC006000000429304Mayank KabraKalpataru Properties Pvt. Ltd.19/02/2024
CC006000000479890Sanjay MukadamKalpataru Properties Private Limited10/04/2024
CC006000000480040Kusum AgrawalKalpataru Properties Private Limited13/04/2024
CC006000000480051Vishal ChavanKalpataru Properties Private Limited12/04/2024
CC006000000480283Atul NargundKalpataru Properties Private Limited08/05/2024
CC006000000590994Amit Pradeep AgarwalKalpataru Properties Private Limited02/07/2024
CC006000000590996Nisheeth KhareKalpataru Properties Private Limited02/07/2024
CC006000000591251Ankur BhajankaKalpataru Properties Private Limited20/07/2024
CC006000000591252Ankur BhajankaKalpataru Properties Private Limited20/07/2024
CC12400245Gulzar GovewallaKalpataru Properties Pvt. Ltd.27/09/2024
CC12400422JIMMY JAINKalpataru Properties Pvt. Ltd.16/10/2024
CC12500354MOHIT OMPRAKASH AGARWALKalpataru Properties Pvt. Ltd.01/02/2025
CC12500789Rounak Dhirajlal ShahKalpataru Properties Pvt. Ltd.08/03/2025
CC12501044Piyush AgrawalKalpataru Properties Pvt. Ltd.28/03/2025
CC12501047Vinod AgrawalKalpataru Properties Pvt. Ltd.28/03/2025
CC12501377Sonia GandhiKalpataru Properties Pvt. Ltd.25/04/2025
CC12501504Nedamangalam Vasudevan ChandramouliKalpataru Properties Pvt. Ltd.06/05/2025
CC12501886Manish SardaKalpataru Properties Pvt. Ltd.10/06/2025
CC12501858Kalpataru Properties Pvt. Ltd.JAYESH VISARIA06/06/2025
CC12502123Swapnil Kant NeerajKalpataru Properties Pvt. Ltd.28/06/2025
CC12502299Riddhi Vinod ShahKalpataru Properties Pvt. Ltd.07/07/2025
CC12502302Kalpataru Properties Pvt. Ltd.Mr Biswajeet Mohanty and Mrs Rekha Mohanty08/07/2025
CC12502854Suruchi MundhraKalpataru Properties Pvt. Ltd.14/08/2025
CC12503755Sandeep ShastriKalpataru Properties Pvt. Ltd.27/10/2025
CC12503560Biswajeet MohantyKalpataru Properties Pvt. Ltd.07/10/2025
CC12503674Rajaram NarayananKalpataru Properties Pvt. Ltd.15/10/2025
CC12503750Rajesh SethuramanKalpataru Properties Pvt. Ltd.27/10/2025
CC12503966Ankit SonkhiyaKalpataru Properties Pvt. Ltd.12/11/2025
CC12600379Kalpataru Properties Pvt. Ltd.Sonia Gandhi20/01/2026
CC12600738Peeyush PallavKalpataru Properties Pvt. Ltd.09/02/2026
CC12601482Priya BhutraKalpataru Properties Pvt. Ltd.17/03/2026
CC12601784Shankar ChandrasekaranKalpataru Properties Pvt. Ltd.27/03/2026
CC12602462Nilima ParmarKalpataru Properties Pvt. Ltd.27/04/2026
CC12602760Kalpataru Properties Pvt. Ltd.Swapnil Kant Neeraj12/05/2026
CC12603776Kalpataru Properties Limitedpayal jayanti parmar18/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed175

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 175 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: FULL OCC (1).pdf2 Jan 2026
Occupational CertificateFile: Drawing 1.pdf2 Jan 2026
Occupational CertificateFile: Drawing 2.pdf2 Jan 2026
Occupational CertificateFile: Drawing 3.pdf2 Jan 2026
Withdrawal Update Form 1File: Magnus AC.pdf28 Oct 2025
Withdrawal Update Form 1File: Magnus AC.pdf28 Oct 2025
Withdrawal Update Form 2File: Magnus EC.pdf28 Oct 2025
Withdrawal Update Form 2File: Magnus EC.pdf28 Oct 2025
Withdrawal Update Form 3File: CA Certificate Magnus Sept 2025.pdf28 Oct 2025
Withdrawal Update Form 3File: CA Certificate Magnus Sept 2025.pdf28 Oct 2025
Withdrawal Update Form 1File: Magnus AC.pdf15 Oct 2025
Withdrawal Update Form 2File: Magnus EC.pdf15 Oct 2025
Withdrawal Update Form 3File: Magnus Final.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: Kalpataru Magnus.pdf22 Sep 2025
Form 2A (FY 2024-2025)30 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf21 Apr 2025
Certificates of CA (Form 3)File: CA Certificate Magnus Mar 2025.pdf21 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus.pdf21 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus AC.pdf20 Jan 2025
Certificates of CA (Form 3)File: Magnus.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus EC.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Magnus.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: MIG V Full CC DT.pdf11 Nov 2024
Declaration about Commencement CertificateFile: Magnus 11112024.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: Magnus.pdf30 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf21 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus.pdf21 Oct 2024
Certificates of CA (Form 3)File: CA Certificate Magnus Sept 2024.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Magnus.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Magnus.pdf6 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus.pdf20 Jul 2024
Certificates of CA (Form 3)File: CA Certificate Magnus June 24.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: K Magnus.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: Magnus.pdf3 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kalpataru Magnus.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kalpataru Magnus.pdf20 Apr 2024
Certificates of CA (Form 3)File: Magnus -Ca Certificate - 31 March 2024.pdf20 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: MIG CC.pdf14 Feb 2024
Declaration about Commencement CertificateFile: Kalpataru Magnus 3.pdf14 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus (Final).pdf13 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATEFEB2021 Mag.pdf13 Feb 2024
Certificates of CA (Form 3)File: Mag Ca.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: K Magnus.pdf30 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: K Magnus.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: K Magnus.pdf20 Jan 2024
Certificates of CA (Form 3)File: magnus dec23ca certificate.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_MIG V Dec 2017.pdf28 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE MIG V (MAGNUS) dec 2017.pdf28 Dec 2023
Certificates of CA (Form 3)File: Kalpataru Magnus Dec 2017.pdf28 Dec 2023
Disclosure of sold/ booked inventoryFile: K Magnus Mar22.pdf26 Dec 2023
Disclosure of sold/ booked inventoryFile: K Magnus June22.pdf26 Dec 2023
Disclosure of sold/ booked inventoryFile: K Magnus Sept22.pdf26 Dec 2023
Disclosure of sold/ booked inventoryFile: K Magnus Dec22.pdf26 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus Jan 2019.pdf13 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Magnus april 2019.pdf13 Dec 2023
Certificates of CA (Form 3)File: Kalpataru Magnus March 22.pdf13 Dec 2023
Certificates of CA (Form 3)File: Kalpataru Magnus June 2022.pdf13 Dec 2023
Certificates of CA (Form 3)File: CA Certificate -Kalpataru Magnus sep 22.pdf13 Dec 2023
Certificates of CA (Form 3)File: Kalpataru Magnus Dec21.pdf13 Dec 2023
Declaration about Commencement CertificateFile: Magnus 3.pdf12 Dec 2023
Certificates of CA (Form 3)File: CA certificate - Kalpataru Magnus - Feb to July 2020.pdf12 Dec 2023
Certificates of CA (Form 3)File: CA Certificate - Kalpataru Magnus - Nov 2020.pdf12 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG Sept 2017.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ENGCERTIFICATE MIG V (MAGNUS).pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ENGCERTIFICATE MIG V (MAGNUS).pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificateMIG V.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: migv.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_MIG-V.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: migv311018.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: magnus.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG V.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus FEB 2020.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Magnus Jan 2020.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG -V ( Final) Nov 2020.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG V May 2021.pdf11 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MIG-V June 2021.pdf11 Dec 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Kalpataru Splendour Wing A, B, C, D, E, F, G, H, IVillage Wakad Tal Mulshi Near Datta Mandir Dist Pune 411057297CompletedDec 2015Late, Jul 2016

How this compares with Mumbai Suburban

55%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 21 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Magnus on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra Kurla Complex6,700+ in Mumbai Suburban

2 kmKalpataru MagnusCompleted 41Lapsed / revoked 19Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 137 registered projects within 2 km.

Builder: Kalpataru Properties Pvt. Ltd.

Kalpataru Properties Pvt. Ltd. has 1 registration on MahaRERA, including Kalpataru Magnus. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Kalpataru Magnus is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Magnus?

The registered promoter entity is Kalpataru Properties Pvt. Ltd., a company as per the filing. Its CIN U41000MH1975PTC018371 and GSTIN 27AAACK1975H1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Magnus?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kalpataru Magnus?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kalpataru Magnus?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Magnus?

The professionals named in the filing: Architect: Jethe & Associates; Architect: Sanjay Puri Architects; Architect: Atul Gulati; Engineer: Pravin Gala Consultants Pvt Ltd; Engineer: Kaustubh Kalkar; Engineer: Dhanwanti Baikar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Magnus?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Magnus. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Magnus to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.