Home / Browse projects / Mumbai Suburban, Maharashtra / 12 PEGASUS

Registered No litigation declared Others project

12 PEGASUS

By Jayant Enterprises S N Project

RG-MH-07129 · RERA P51800054031 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 92%
439 of 539Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 168 documents Report an error

12 PEGASUS is a Others project by Jayant Enterprises S N Project in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054031 on 19 Dec 2023. Possession is promised by 31 Dec 2028. 100 of the 539 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • Name12 PEGASUS
  • TypeOthers
  • Location
    • Ramkrishna Paramhans Marg
    • Gandhi Nagar
    • H/E ward BANDRA EAST
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054031
  • ReraGenie IDRG-MH-07129

Builder

  • NameJayant Enterprises S N Project
  • Entity typePartnership
  • GSTIN27AAFFJ6037K1Z4
  • PartnersAmith Chandulal Punjabi, SHAILENDRA ASHUTOSH ABHYANKAR, Jitendra Ashokkumar Dhariwal, Abhishek Ashutosh Abhyankar, Jayantilal Bhanwarlal Lunkad, Kiran Ravindra Samant
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Dec 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed168 files

Current status

19%100 of 539 units booked
48.4%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Composite Building No 1NA262225058308
Sale Building no 2NA24210231231

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 92%.

Composite Building No 165%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sale Building no 253%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure73%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks73%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes5%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed247

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots247
Closed/Covered247
BuildingClosed/CoveredTotal
Composite Building No 12323
Sale Building no 2224224

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,282 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jul 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI24883.56
Proposed, not sanctioned24,884 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBuilding No M, Palm Court Building, Unit No 2C and 102C, Ground Floor, Mumbai - 400064
Estimated costRs 156.47 cr
Cost incurredRs 75.68 cr
Work done48.37%
BuildingWingEstimatedIncurred
Sale Building no 2NARs 65.95 crRs 40.24 cr
-NARs 46.94 crRs 3.04 cr
Composite Building No 1NARs 43.58 crRs 32.41 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManishkumar V. Bagsariya
EngineerMr. Chetan P Tambewagh
Chartered AccountantR A N K & Associates
Chartered AccountantRANK & Associates
Chartered AccountantD. Kothary & Co.
PartnerRole in project
Jayant Enterprises S N Project-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600114Bhakti AchrekarJayant Enterprises S N Project06/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed168

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 12 Pegasus Form1 Q4 FY 25-26.pdf28 Apr 2026
Withdrawal Update Form 2File: 12 PEGASUS-FY-2025-26-FORM-2-Q4.pdf28 Apr 2026
Withdrawal Update Form 3File: Signed 12 Pegasus Form 3 Q4 FY - 25-26_compress.pdf28 Apr 2026
Withdrawal Update Form 1File: Signed 12 PEGASUS-FY-2025-26-FORM-1-Q3.pdf16 Feb 2026
Withdrawal Update Form 2File: Signed 12 PEGASUS-FY-2025-26-FORM-2-Q3.pdf16 Feb 2026
Withdrawal Update Form 3File: Signed 12 PEGASUS-FY-2025-26-FORM-3-Q3.pdf16 Feb 2026
Building plan approvalFile: Sale Bldg No 2 Amended IOA Plan 22 04 2025 _compressed Sales-1-3.pdf8 Dec 2025
Building plan approvalFile: Sale Bldg No 2 Amended IOA Plan 22 04 2025 _compressed Sales-4-6.pdf8 Dec 2025
Building plan approvalFile: Sale Bldg No 2 Amended IOA Plan 22 04 2025 _compressed Sales-7-8.pdf8 Dec 2025
Building plan approvalFile: Sale Bldg No 2 Amended IOA Plan 22 04 2025 _compressed Sales-9.pdf8 Dec 2025
Building plan approvalFile: Sale Bldg No 2 Amended IOA Plan 22 04 2025 _compressed Sales-10-11.pdf8 Dec 2025
Building plan approvalFile: Ammended IOA Rehab Composit Bldg 27 03 2025_compressed-1-3.pdf8 Dec 2025
Building plan approvalFile: Ammended IOA Rehab Composit Bldg 27 03 2025_compressed-4-5.pdf8 Dec 2025
Building plan approvalFile: Ammended IOA Rehab Composit Bldg 27 03 2025_compressed-6-7.pdf8 Dec 2025
Building plan approvalFile: Ammended IOA Rehab Composit Bldg 27 03 2025_compressed-8-9.pdf8 Dec 2025
Building plan approvalFile: Ammended IOA Rehab Composit Bldg 27 03 2025_compressed-10-11.pdf8 Dec 2025
Building plan approvalFile: Ammended IOA Rehab Composit Bldg 27 03 2025_compressed-12-13.pdf8 Dec 2025
Building plan approvalFile: Ammended IOA Rehab Composit Bldg 27 03 2025_compressed-14-15.pdf8 Dec 2025
Withdrawal Update Form 1File: 12 PEGASUS-FY-2025-26-FORM-1-Q2 (1).pdf4 Dec 2025
Withdrawal Update Form 2File: 12 PEGASUS-FY-2025-26-FORM-2-Q2.pdf4 Dec 2025
Withdrawal Update Form 3File: Sign of Form 3 Certificate_12 Pegasus_Q2 sep 25.pdf4 Dec 2025
Form 5 (FY 2024-2025)File: JAYANT ENTERPRISES SN PROJECT FORM 5-2024-25 (1).pdf19 Nov 2025
Withdrawal Update Form 1File: 12 Pegasus Q1- FORM-2.pdf1 Oct 2025
Withdrawal Update Form 1File: Signed form 1 Jayant RERA Certifcate DT 22 09 2025.pdf1 Oct 2025
Withdrawal Update Form 2File: FORM-2-Engineer Certificate.pdf1 Oct 2025
Withdrawal Update Form 2File: 12 Pegasus Q1- FORM-2.pdf1 Oct 2025
Withdrawal Update Form 3File: Signed 12 pegasus Q1Withdrawal Application Form3.pdf1 Oct 2025
Withdrawal Update Form 3File: Signed 12 pegasus Q1Withdrawal Application Form3.pdf1 Oct 2025
Form 1File: 12 PEGASUS-FORM-1-Q4.pdf14 May 2025
Form 2File: 12 PEGASUS-FORM-2-Q4.pdf14 May 2025
Disclosure of Sold and Booked InventoryFile: DOS_11zon.pdf14 May 2025
Form 3File: Form 3_12 Pegasus_Q4 - Final_compressed.pdf14 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Sale Bldg no 2 dated 22-04-2025.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 PEGASUS-FORM-1-Q4.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_12 Pegasus_Q4 - Final_compressed.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 PEGASUS-FORM-2-Q4.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jayant Enterprises-compressed.pdf15 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Declaration About Seperate Account.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jayant Enterprises as on 31122024 Signed.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 PEGASUS-FORM-2-Q3 (1).pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 PEGASUS-FORM-1-Q3.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 PEGASUS-FORM-2-Q3.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: JAYANT ENTERPRISES SN PROJECT FORM 5-2023-24.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 12 Pegasus.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_12 Pegasus_Q2 FY 23-24_compressed.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_12 Pegasus_Q2 FY 23-24_compressed.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 12 Pegasus.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- 12 Pegasus.pdf14 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24_12 Pegasus.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Self Declaration_not obliged for quarterly update.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Self Declaration_not obliged for quarterly update.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration_not obliged for quarterly update.pdf20 Jul 2024
Building plan approvalFile: Pg 1 and 2 of 9_11zon (1).pdf28 May 2024
Building plan approvalFile: Pg 3 and 4 of 9.pdf28 May 2024
Building plan approvalFile: Pg 5 and 6 of 9.pdf28 May 2024
Building plan approvalFile: Pg 7 8 and 9 of 9.pdf28 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Pg 1 and 2 of 9_11zon (1).pdf28 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Pg 3 and 4 of 9.pdf28 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Pg 5 and 6 of 9.pdf28 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Pg 7 8 and 9 of 9.pdf28 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 2nd CC Sale Bldg 08052024.pdf28 May 2024
Layout approvalFile: Ammended IOA Composit Bldg 1 of 12_11zon (3).pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 1 of 12_11zon (2).pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 2 of 12_11zon.pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 3 of 12_11zon.pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 4 of 12_11zon.pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 5 of 12_11zon.pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 6 of 12_11zon (1).pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 7 of 12_11zon.pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 8 of 12_11zon.pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 10 of 12_11zon.pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 11 of 12_11zon.pdf27 May 2024
Building plan approvalFile: Ammended IOA Composit Bldg 12 of 12_11zon (1).pdf27 May 2024
Copy of Layout Approval (in case of layout)File: Ammended IOA Composit Bldg 1 of 12_11zon (3).pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ammended IOA Composit Bldg 1 of 12_11zon (2).pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ammended IOA Composit Bldg 2 of 12_11zon.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ammended IOA Composit Bldg 3 of 12_11zon.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ammended IOA Composit Bldg 4 of 12_11zon.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ammended IOA Composit Bldg 5 of 12_11zon.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ammended IOA Composit Bldg 6 of 12_11zon (1).pdf27 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Sky CrestP51800003517Malad West, Mumbai Suburban49Aug 2017OngoingJul 2022Registered original: Jan 2021Jul 2022

How this compares with Mumbai Suburban

19%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 12 PEGASUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near H/E ward BANDRA EAST6,700+ in Mumbai Suburban

2 km12 PEGASUSCompleted 108Lapsed / revoked 66Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 314 registered projects within 2 km.

Builder: Jayant Enterprises S N Project

Jayant Enterprises S N Project has 1 registration on MahaRERA, including 12 PEGASUS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if 12 PEGASUS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 12 PEGASUS?

The registered promoter entity is Jayant Enterprises S N Project, a partnership as per the filing. Its GSTIN 27AAFFJ6037K1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 12 PEGASUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 12 PEGASUS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 12 PEGASUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 12 PEGASUS?

The professionals named in the filing: Architect: Manishkumar V. Bagsariya; Engineer: Mr. Chetan P Tambewagh; Chartered Accountant: R A N K & Associates; Chartered Accountant: RANK & Associates; Chartered Accountant: D. Kothary & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 12 PEGASUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 12 PEGASUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 12 PEGASUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.