Home / Browse projects / Palghar, Maharashtra / Sunteck West World 2, Tivri, Naigaon East

Completed No litigation declared Others project

Sunteck West World 2, Tivri, Naigaon East

By Sunteck Realty Limited

RG-MH-64780 · RERA P99000017627 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
6Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Sunteck West World 2, Tivri, Naigaon East is a Others project by Sunteck Realty Limited in Palghar, Maharashtra, registered with MahaRERA as P99000017627 on 29 Aug 2018. The registration is recorded completed; possession was promised by 30 Dec 2023. 6 complaints are on record with the regulator.

At a glance

Project

  • NameSunteck West World 2, Tivri, Naigaon East
  • TypeOthers
  • Location
    • Tivri
    • Tivari
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000017627
  • ReraGenie IDRG-MH-64780

Builder

  • NameSunteck Realty Limited
  • Entity typeCompany
  • CINL32100MH1981PLC025346
  • GSTIN27AAACI0336E1Z3
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorKamal Shrigopal Khetan
  • Company SecretoryRachana Vipul Hingarajia
  • Company SecretariesRachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia
  • Other registrations24 more →
  • Completed10 of 25
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Aug 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 6NA240000
Building No 7NA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building No 691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,639 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DDPL GLOBAL INFRASTRUCTURE PRIVATE LIMITEDBorivaliMumbai Suburban
UNICORN INFRAPROJECTS AND ESTATES PRIVATE LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI30276.77
Proposed, not sanctioned30,277 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAxis Bank Ltd, Ground Floor, Senorita, Plot No 21, Gulmohar Road, Near Juhu circle, VileParle W Mumb

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVivek Bhole Architects Pvt. Ltd
PartnerRole in project
Sunteck Realty Limited-

Litigation declared1

CaseCourtStatus
127 of 2019/2019NCLTPending

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000395983Sunteck Realty LimitedAmar Khan31/05/2023
CC006000000395985Sunteck Realty LimitedMs. Nanda P. Mishra29/08/2023
CC006000000396602Sunteck Realty LimitedMs. Taimina Hasin Khan13/07/2023
CC006000000396603Sunteck Realty LimitedMr. Satyanarayna Gaddam13/07/2023
CC006000000396750Sunteck Realty LimitedMs. Rekha Vinod Singh25/07/2023
CC006000000429196Mr Santosh Kumar SinghSunteck Realty11/02/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Oct 2022

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SWW2.pdf30 Sep 2023
Details of encumbrancesFile: 2023 04 20_ Encumbrance Certificate SWW 2.pdf18 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SWW-2_Oct-22.pdf14 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation certificate20 05 22.pdf7 Oct 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate SWW2 Completion Certificate 08062022.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck WW2_2021-22.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2_July-22.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate SWW2_July-22.pdf19 Jul 2022
Certificates of CA (Form 3)File: Form 3-CA Certificate SWW1_2022 07 06 .pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2_Mar-22.pdf16 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate SWW2_Mar-22.pdf16 Apr 2022
Certificates of CA (Form 3)File: Form 3-CA Certificate SWW1_2022 04 07.pdf16 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate SWW2_Jan-22.pdf12 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2_Jan-22.pdf8 Jan 2022
Certificates of CA (Form 3)File: Form 3-CA Certificate SWW1_2022 01 07.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate SWW2_Oct-21.pdf19 Oct 2021
Certificates of CA (Form 3)File: Form 3-CA Certificate SWW2_2021 10 16.pdf19 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2_Oct-21.pdf12 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - WestWorld 2-2020-21.pdf30 Sep 2021
Details of encumbrancesFile: CERSAI Search Report Security.pdf30 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2 Aug 21 Final.pdf23 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter for society formation in process to upload on RERA SWW2.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2_June-21.pdf22 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Provisional OC RETAIL AREA 050820.pdf22 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2 Mar21.pdf23 Mar 2021
Layout approvalFile: 2019 07 08 Phase II Bldg No 6.pdf17 Mar 2021
Copy of Layout Approval (in case of layout)File: 2019 07 08 Phase II Bldg No 6.pdf17 Mar 2021
Details of encumbrancesFile: Encumbrance Certificate 1 2 020221.pdf17 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2 Dec 20.pdf22 Dec 2020
Certificates of CA (Form 3)File: CA Certificate FORM 3 SWW2_Oct-20.pdf20 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificates of CA (Form 5) Sunteck WW2 2019-20-final to upload.pdf6 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2 Sep20.pdf14 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate SWW2_Mar-20.pdf20 Mar 2020
Certificates of CA (Form 3)File: CA Certificate SWW2_Mar-20 to upload.pdf20 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2 Feb20.pdf21 Feb 2020
Details of encumbrancesFile: 2019 12 19 Encumbrance Certificate 1 and 2.pdf26 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2Nov19.pdf22 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SWW2 Sep19.pdf14 Oct 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate SWW2 Sep19.pdf14 Oct 2019
Certificates of CA (Form 3)File: CA Certificate SWW2 Sep19.pdf14 Oct 2019
Form 2AFile: 2019 09 FORM 2A Quality Assurance Certificate SWW 2.pdf1 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: RERA Certificate WW2 2019 (1).pdf30 Sep 2019
Details of encumbrancesFile: Encumbrance Certificate 1 and 2 310819 .pdf31 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: 2019 08 05 PCC Bldg No 6 D wing.pdf24 Aug 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate030719.pdf23 Aug 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate010719 sww2.pdf23 Aug 2019
Certificates of CA (Form 3)File: CA Certificate SWW2290619 final toupload.pdf23 Aug 2019
Form 2AFile: 2019 06 FORM 2A Quality Assurance Certificate SWW 2.pdf2 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: 2019 05 02 PCC .pdf23 May 2019
Commencement Certificates / NA Order for plotted developmentFile: 2019 02 13 pcc.pdf10 Apr 2019
Form 2AFile: 2019 03 FORM 2A Quality Assurance Certificate SWW 2.pdf10 Apr 2019
Form 2AFile: FORM 2A Quality Assurance Certificate SWW 2.pdf17 Jan 2019
Proforma of Allotment letterFile: allotment letter and agreement for sale.pdf11 Oct 2018
Copy of the legal title reportFile: Rajani Title Report 280818.pdf5 Sep 2018
Building plan approvalFile: 25 CC letter dtd 200818.pdf24 Aug 2018
Layout approvalFile: 25 CC letter dtd 200818.pdf24 Aug 2018
Copy of the legal title reportFile: 45 H 2A 5.pdf24 Aug 2018
Copy of the legal title reportFile: 45 H 3A 3B.pdf24 Aug 2018
Copy of the legal title reportFile: 45 H 4.pdf24 Aug 2018
Copy of the legal title reportFile: 45 H 6.pdf24 Aug 2018
Copy of the legal title reportFile: 46 H 4 7.pdf24 Aug 2018
Copy of the legal title reportFile: 46 H 5 8.pdf24 Aug 2018
Copy of the legal title reportFile: 46 H 6.pdf24 Aug 2018
Copy of the legal title reportFile: 47 H 5.pdf24 Aug 2018
Copy of the legal title reportFile: 47 H 8.pdf24 Aug 2018
Copy of the legal title reportFile: 47 H 9.pdf24 Aug 2018
Copy of the legal title reportFile: 47 H1A 3A.pdf24 Aug 2018
Copy of the legal title reportFile: 50 H 4.pdf24 Aug 2018
Copy of the legal title reportFile: 50 H 5.pdf24 Aug 2018
Copy of the legal title reportFile: 50 H 6.pdf24 Aug 2018
Copy of the legal title reportFile: 50 H 7.pdf24 Aug 2018
Copy of the legal title reportFile: 50 H 8.pdf24 Aug 2018
Copy of the legal title reportFile: 51 H2 47 H4A 3B.pdf24 Aug 2018
Details of encumbrancesFile: Encumbrance Certificate 2.pdf24 Aug 2018
Copy of Layout Approval (in case of layout)File: 25 CC letter dtd 200818.pdf24 Aug 2018
Building Plan Approval (IOD)File: 25 CC letter dtd 200818.pdf24 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: 25 CC letter dtd 200818.pdf24 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: 25 Bldg 6 Plan.pdf24 Aug 2018
Declaration in FORM BFile: Affidavit cum Declaration 2 24818.pdf24 Aug 2018
Certificates of CA (Form 3)File: CA certificate world 2 Upload.pdf24 Aug 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sunteck GrandeurSunteck Grandeur 42 S. V. Road near Andheri Subway Andheri West Mumbai 400 05720CompletedMar 2013Late, Jul 2014
Sunteck CentreSunteck Centre 37-40 Subhash Road Vile Parle East Mumbai 40005715CompletedSep 2009Late, Dec 2009

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck West World 2, Tivri, Naigaon East on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tivri3,200+ in Palghar

2 kmSunteck West World 2, TiCompleted 23Lapsed / revoked 11Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 68 registered projects within 2 km.

Builder: Sunteck Realty Limited

Sunteck Realty Limited has 25 registrations on MahaRERA, including Sunteck City Avenue 1 and Sunteck City Avenue 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Sunteck West World 2, Tivri, Naigaon East is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck West World 2, Tivri, Naigaon East?

The registered promoter entity is Sunteck Realty Limited, a company as per the filing. Its CIN L32100MH1981PLC025346 and GSTIN 27AAACI0336E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck West World 2, Tivri, Naigaon East?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sunteck West World 2, Tivri, Naigaon East?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sunteck West World 2, Tivri, Naigaon East?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck West World 2, Tivri, Naigaon East?

The professionals named in the filing: Architect: Vivek Bhole Architects Pvt. Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck West World 2, Tivri, Naigaon East?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck West World 2, Tivri, Naigaon East. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck West World 2, Tivri, Naigaon East to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.