Sunteck ONEWorld 2, Tivri, Naigaon East

By Sunteck Realty Limited

RG-MH-85065 · RERA P99000032834 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 2 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken
  • Rs 300.00 crore secured on the land, in favour of Axis Bank

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 18 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
127 of 370Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Sunteck ONEWorld 2, Tivri, Naigaon East is a Others project by Sunteck Realty Limited in Palghar, Maharashtra, registered with MahaRERA as P99000032834 on 2 Feb 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 18 months from the original filing. 243 of the 370 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSunteck ONEWorld 2, Tivri, Naigaon East
  • TypeOthers
  • Location
    • Tivari
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000032834
  • ReraGenie IDRG-MH-85065

Builder

  • NameSunteck Realty Limited
  • Entity typeCompany
  • CINL32100MH1981PLC025346
  • GSTIN27AAACI0336E1Z3
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Company SecretaryRachana Vipul Hingarajia
  • Other registrations24 more →
  • Completed10 of 25
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredFeb 2022First promiseDec 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2022
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2025)
  • Buildings2 building records
  • Documents filed97 files

Current status

66%243 of 370 units booked
81.0%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 3NA242317112183
Tower 4NA242317116187

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

Tower 359%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises81%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.84%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.52%
Tower 456%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.84%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.43%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes40%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes85%
Solid Waste Management And DisposalYes85%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6
BuildingClosed/CoveredTotal
Tower 333
Tower 433

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,060 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofAxis Bank
Secured amountRs 300.00 crore
CERSAI search filedYes
Declared on21 Aug 2025
LandownerVillageDistrict
DDPL GLOBAL INFRASTRUCTURE PRIVATE LIMITEDBorivaliMumbai Suburban
UNICORN INFRAPROJECTS AND ESTATES PRIVATE LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation (VVCMC)
Permissible FSI23500.0
Proposed, not sanctioned23,381 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Senorita, Plot No 21, Gulmohar Road, Near Juhu circle, Vile Parle West, Mumbai 400056
Estimated costRs 78.03 cr
Cost incurredRs 63.21 cr
Work done81.01%
BuildingWingEstimatedIncurred
Tower 3NARs 30.64 crRs 28.50 cr
Tower 4NARs 30.64 crRs 28.50 cr
-NARs 16.76 crRs 6.21 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPractice Design Pvt. Ltd
EngineerRaju HJ
EngineerGul Ghanshyam Mirani
Chartered AccountantJhanwar & Maheshwari
Chartered AccountantWalker Chandiok & Co LLP
PartnerRole in project
Sunteck Realty Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13112518321Dec 2025 → Jun 2027

Reason as filed by the promoterAs per the order of the Hon'ble Chairman of MahaRERA dated 12/12/2025, we request you to kindly grant us an extension till 30/06/2027.

Litigation declared2

CaseCourtStatus
127 of 2019/2019NCLTOngoing
127 of 2019/2019National Company Law TribunalOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12500799Aldrin Alex DanielSunteck Realty Limited08/03/2025
CC12604458KAMAL KUMARSunteck Realty Limited17/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE SOW 2_June-26.pdf23 Jul 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE SOW 2_June-26.pdf23 Jul 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE SOW 2_June-26.pdf23 Jul 2026
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE SOW 2_Mar-26.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE SOW 2_Mar-26.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE SOW 2_Mar-26.pdf25 Apr 2026
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE SOW 2_Dec-25.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE SOW 2_Dec-25.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE SOW 2_Dec-25.pdf2 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A Sunteck One World 2.pdf13 Nov 2025
Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE SOW 2_Sep-25.pdf3 Nov 2025
Withdrawal Update Form 2File: Form 2 ENGINEERu0027S CERTIFICATE SOW 2_Sep-25.pdf3 Nov 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE SOW 2_Sep-25.pdf3 Nov 2025
Form 5 (FY 2024-2025)File: 2024-25_Form 5-CA CERTIFICATE ANNUAL REPORT SOW 2_2024-25.pdf24 Sep 2025
Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE SOW 2_June-25.pdf21 Aug 2025
Withdrawal Update Form 2File: Form 2 ENGINEERu0027S CERTIFICATE SOW 2_June-25.pdf21 Aug 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE SOW 2_June-25.pdf21 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE SOW 2_Mar-25.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW 2_Mar-25 Compress.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE SOW 2_Mar-25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE SOW 2_Jan-25.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_Jan-25 Copress.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER'S CERTIFICATE SOW 2_Jan-25.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_Oct-24.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_Oct-24 Compress.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_Oct-24.pdf28 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: One world 2.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_June-24.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_June-24.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_June-24 Compress.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_Mar-24.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_Mar-24.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2024 03 Annexure C-Form 2A-QUALITY ASSURANCE ONEWorld 2.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_Mar-24.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_Jan-24.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_Jan-24.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_Jan-24 Compress.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_Sep-23.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_Sep-23.pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_Sep-23.pdf1 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: One World 2.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_June-23.pdf23 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_June-23.pdf23 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_June-23 Compress.pdf23 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Annexure C-Form 2A-QUALITY ASSURANCE ONEWorld 2-02_Mar-22.pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_Mar-23.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_Mar-23.pdf29 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_Mar-23.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_Jan-23.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_Jan-23.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_Jan-23.pdf21 Jan 2023
Details of encumbrancesFile: 2022 12 23 Encumbrance Certificate ONEWorld 2.pdf31 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SOW-2_Oct-22.pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SOW-2_Oct-22.pdf13 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SOW-2_Oct-22.pdf13 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT SOW 2_2021-22.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck ONEWorld 2_July-22.pdf24 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B-Form 2-Engineer Certificate ONEWorld 2_Mar-22.pdf26 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 03 20 Form 3-CA Certificate SOW2_Mar-22 .pdf25 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck ONEWorld 2.pdf16 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE ONEWorld 2-01_Mar-22.pdf16 Apr 2022
CERSAI detailsFile: CERSAI Search Report.pdf28 Jan 2022
Proforma of Allotment letterFile: Allotment letter and draft AFS-final.pdf28 Jan 2022
Layout approvalFile: Layout plan 01 of 02.pdf25 Jan 2022
Layout approvalFile: 2021 12 31 RDP Naigaon Phase III.pdf25 Jan 2022
Building plan approvalFile: NA Order dt 8 Sept 2009.pdf25 Jan 2022
Building plan approvalFile: NA Order dt 7 Oct 2009.pdf25 Jan 2022
Building plan approvalFile: NA order dated 21 04 12.pdf25 Jan 2022
Building plan approvalFile: 2021 12 31 RDP Naigaon Phase III.pdf25 Jan 2022
Building plan approvalFile: 2021 12 31 CC Naigaon Phase III .pdf25 Jan 2022
PAN CardFile: PAN Card.pdf25 Jan 2022
Copy of the legal title reportFile: DDPL RERA TITLE - Legal Title Report-compressed.pdf25 Jan 2022
Copy of the legal title reportFile: DDPL RERA TITLE - Flow of the Title 01.pdf25 Jan 2022
Copy of the legal title reportFile: DDPL RERA TITLE - Search Report-compressed.pdf25 Jan 2022
Details of encumbrancesFile: Encumbrance Certificate ONEWorld 2.pdf25 Jan 2022
Details of encumbrancesFile: Encumbrance certificate Owner Sunteck ONEWorld.pdf25 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout plan 01 of 02.pdf25 Jan 2022
Copy of Layout Approval (in case of layout)File: 2021 12 31 RDP Naigaon Phase III.pdf25 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order dt 8 Sept 2009.pdf25 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order dt 7 Oct 2009.pdf25 Jan 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sunteck GrandeurSunteck Grandeur 42 S. V. Road near Andheri Subway Andheri West Mumbai 400 05720CompletedMar 2013Late, Jul 2014
Sunteck CentreSunteck Centre 37-40 Subhash Road Vile Parle East Mumbai 40005715CompletedSep 2009Late, Dec 2009

How this compares with Palghar

66%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 18 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck ONEWorld 2, Tivri, Naigaon East on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tivari3,200+ in Palghar

2 kmSunteck ONEWorld 2, TivrCompleted 25Lapsed / revoked 10Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: Sunteck Realty Limited

Sunteck Realty Limited has 25 registrations on MahaRERA, including Sunteck City Avenue 1 and Sunteck City Avenue 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Sunteck ONEWorld 2, Tivri, Naigaon East is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck ONEWorld 2, Tivri, Naigaon East?

The registered promoter entity is Sunteck Realty Limited, a company as per the filing. Its CIN L32100MH1981PLC025346 and GSTIN 27AAACI0336E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck ONEWorld 2, Tivri, Naigaon East?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sunteck ONEWorld 2, Tivri, Naigaon East?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sunteck ONEWorld 2, Tivri, Naigaon East?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck ONEWorld 2, Tivri, Naigaon East?

The professionals named in the filing: Architect: Practice Design Pvt. Ltd; Engineer: Raju HJ; Engineer: Gul Ghanshyam Mirani; Chartered Accountant: Jhanwar & Maheshwari; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck ONEWorld 2, Tivri, Naigaon East?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck ONEWorld 2, Tivri, Naigaon East. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck ONEWorld 2, Tivri, Naigaon East to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.