Home / Browse projects / Palghar, Maharashtra / Sunteck MaxxWorld 5, Tivri, Naigaon East
Sunteck MaxxWorld 5, Tivri, Naigaon East
RG-MH-27986 · RERA P99000024562 · Last updated on MahaRERA portal: 25 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- Rs 300.00 crore secured on the land, in favour of Axis Bank Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sunteck MaxxWorld 5, Tivri, Naigaon East is a Residential / Group Housing project by Sunteck Realty Limited in Palghar, Maharashtra, registered with MahaRERA as P99000024562 on 24 Feb 2020. Possession is promised by 30 Dec 2026. 0 of the 6 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameSunteck MaxxWorld 5, Tivri, Naigaon East
- TypeResidential / Group Housing
- Location
- Tivri
- Tivari
- Vasai
- Palghar
- 401208
- Pincode401208
- RERA no.P99000024562
- ReraGenie IDRG-MH-27986
Builder
- NameSunteck Realty Limited
- Entity typeCompany
- CINL32100MH1981PLC025346
- GSTIN27AAACI0336E1Z3
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Company SecretaryRachana Vipul Hingarajia
- Other registrations24 more →
- Completed10 of 25
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Feb 2020
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed104 files
Current status
Figures as on 25 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 2 | NA | 2 | 1 | 6 | 0 | 6 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Building No 2: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| DDPL GLOBAL INFRASTRUCTURE PRIVATE LIMITED | Borivali | Mumbai Suburban |
| UNICORN INFRAPROJECTS AND ESTATES PRIVATE LIMITED | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No 2 | NA | Rs 39.18 cr | - |
| - | NA | Rs 3.47 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ingrain |
| Engineer | Raju HJ |
| Chartered Accountant | Jhanwar & Maheshwari |
| Chartered Accountant | Walker Chandiok & Co LLP |
| Partner | Role in project |
|---|---|
| Sunteck Realty Limited | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 127 of 2019/2019 | NCLT | Ongoing |
| 127/2019/2019 | National Company Law Tribunal | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE Maxx 5_Mar-26.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Maxx-5_Mar-26.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA CERTIFICATE Maxx-5_Mar-26.pdf | 25 Apr 2026 |
| Layout approvalFile: RDP 24 Bldg 3A 22 (1).pdf | 6 Mar 2026 |
| Building plan approvalFile: RDP 24 03 12 2020 Roted.pdf | 6 Mar 2026 |
| Layout approvalFile: RDP 24 Bldg 3A 22.pdf | 20 Feb 2026 |
| Withdrawal Update Form 1File: Form 1-ARCHITECTS CERTIFICATE Maxx 5_Dec-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Maxx-5_Dec-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA CERTIFICATE Maxx-5_Dec-25.pdf | 23 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE Maxx 5_Sep-25.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: Form 2-ENGINEERu0027S CERTIFICATE Maxx-5_Sep-25.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: Form 3-CA CERTIFICATE Maxx-5_Sep-25.pdf | 30 Oct 2025 |
| Form 5 (FY 2024-2025)File: 2024-25_Form 5-CA CERTIFICATE ANNUAL REPORT Maxx5.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE Maxx 5_June-25.pdf | 4 Aug 2025 |
| Withdrawal Update Form 2File: Form 2-ENGINEERu0027S CERTIFICATE Maxx-5_June-25.pdf | 4 Aug 2025 |
| Withdrawal Update Form 3File: Form 3-CA CERTIFICATE Maxx-5_June-25 New.pdf | 4 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE Maxx 5_Mar-25.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Mar-25_split.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Mar-25.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE Maxx 5_Jan-25.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Jan-25.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Jan-25.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE Maxx 5 Oct-24.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Oct-24.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Oct-24.pdf | 23 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Max world 5.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-5_June-24.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_June-24.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_June-24.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-5_Mar-24.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Mar-24.pdf | 26 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2024 03 FORM 2A Quality Assurance Certificate Maxx5.pdf | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Mar-24.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-5_Jan-24.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Jan-24.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Jan-24.pdf | 23 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-5_Sep-23.pdf | 30 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Sep-23.pdf | 30 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Sep-23.pdf | 30 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Maxx World 5.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-5_June-23.pdf | 7 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_June-23.pdf | 7 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_June-23.pdf | 7 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality Assurance Certificate Maxx6-10_Mar-23.pdf | 9 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-5_Mar-23.pdf | 28 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Mar-23.pdf | 28 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Mar-23.pdf | 28 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-5_Jan-23.pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Jan-23.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Jan-23.pdf | 21 Jan 2023 |
| Details of encumbrancesFile: 2022 12 23 Encumbrance Certificate Maxx5.pdf | 31 Dec 2022 |
| Declaration about Commencement CertificateFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE_Maxx5.pdf | 2 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-5_Oct-22.pdf | 12 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-5_Oct-22.pdf | 12 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-5_Oct-22.pdf | 12 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Maxx5_2021-22.pdf | 30 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 ARCHITECT'S CERTIFICATE Max5_July-22.pdf | 9 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx5_July-22.pdf | 9 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 07_Form 3-CA Certificate Maxx5_July-22.pdf | 9 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 ARCHITECT'S CERTIFICATE Max5_Mar-22.pdf | 16 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx5_Mar-22.pdf | 16 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx5-09_Mar-22.pdf | 16 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 03_Form 3-CA Certificate Maxx5.pdf | 16 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx5_Jan-22.pdf | 14 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx5_Jan-22.pdf | 14 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx5_Jan-22.pdf | 8 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx5-08_Dec-21.pdf | 8 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 01_Form -3 CA Certificate - Sunteck MaxxWorld 5_2022 01 07.pdf | 8 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -3 CA Certificate - Sunteck MaxxWorld 5_Oct-21.pdf | 28 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx5_Oct-21.pdf | 28 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 CA Certificate - Sunteck MaxxWorld 5_Oct-21.pdf | 28 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx5_Oct-21.pdf | 12 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-Maxxworld 5-2020-21.pdf | 30 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx5.pdf | 24 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx5_Aug-21.pdf | 23 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx5 - Revised June-21.pdf | 25 Jun 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx5 June 21.pdf | 22 Jun 2021 |
| Proforma of Allotment letterFile: Alloment Letter Naigaon and Agreement for Sale SMW 5.pdf | 18 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: 58.pdf | 14 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: Scan 0395 01.pdf | 14 Feb 2020 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sunteck Grandeur | Sunteck Grandeur 42 S. V. Road near Andheri Subway Andheri West Mumbai 400 057 | 20 | Completed | Mar 2013 | Late, Jul 2014 |
| Sunteck Centre | Sunteck Centre 37-40 Subhash Road Vile Parle East Mumbai 400057 | 15 | Completed | Sep 2009 | Late, Dec 2009 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 24 other registrations, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sunteck MaxxWorld 5, Tivri, Naigaon East on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tivri3,200+ in Palghar
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: Sunteck Realty Limited
Sunteck Realty Limited has 25 registrations on MahaRERA, including Sunteck City Avenue 1 and Sunteck City Avenue 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Sunteck MaxxWorld 5, Tivri, Naigaon East is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sunteck MaxxWorld 5, Tivri, Naigaon East?
The registered promoter entity is Sunteck Realty Limited, a company as per the filing. Its CIN L32100MH1981PLC025346 and GSTIN 27AAACI0336E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sunteck MaxxWorld 5, Tivri, Naigaon East?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sunteck MaxxWorld 5, Tivri, Naigaon East?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sunteck MaxxWorld 5, Tivri, Naigaon East?
The professionals named in the filing: Architect: Ingrain; Engineer: Raju HJ; Chartered Accountant: Jhanwar & Maheshwari; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sunteck MaxxWorld 5, Tivri, Naigaon East?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback