Home / Browse projects / Palghar, Maharashtra / Sunteck MaxxWorld 4, Tivri, Naigaon East

Registration lapsed No litigation declared Others project

Sunteck MaxxWorld 4, Tivri, Naigaon East

By Sunteck Realty Limited

RG-MH-27809 · RERA P99000024173 · Last updated on MahaRERA portal: 14 Oct 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 64%
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Sunteck MaxxWorld 4, Tivri, Naigaon East is a Others project by Sunteck Realty Limited in Palghar, Maharashtra, registered with MahaRERA as P99000024173 on 23 Jan 2020. Possession was promised by 30 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameSunteck MaxxWorld 4, Tivri, Naigaon East
  • TypeOthers
  • Location
    • Tivri
    • Tivari
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • RERA no.P99000024173
  • ReraGenie IDRG-MH-27809

Builder

  • NameSunteck Realty Limited
  • Entity typeCompany
  • CINL32100MH1981PLC025346
  • GSTIN27AAACI0336E1Z3
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorKamal Shrigopal Khetan
  • Company SecretoryRachana Vipul Hingarajia
  • Company SecretariesRachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia, Rachana Vipul Hingarajia
  • Other registrations24 more →
  • Completed10 of 25
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

10 months past promisethis monthRegisteredJan 2020PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Jan 2020
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Current status

74.9%Work done, per cost certificate

Figures as on 14 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sunteck HillView 1NA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 64%.

Sunteck HillView 1: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises47%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.64%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered17

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,759 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DDPL GLOBAL INFRASTRUCTURE PRIVATE LIMITEDBorivaliMumbai Suburban
UNICORN INFRAPROJECTS AND ESTATES PRIVATE LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation (VVCMC)
Permissible FSI7938.26
Proposed, not sanctioned7,938 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLINKING ROAD, KHAR WEST
Estimated costRs 40.67 cr
Cost incurredRs 30.45 cr
Work done74.87%
BuildingWingEstimatedIncurred
Sunteck HillView 1NARs 37.22 crRs 27.00 cr
-NARs 3.45 crRs 3.45 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre & Associates
ArchitectAjay Wade & Associates
EngineerSanjay More
EngineerSameer Kotkar
Chartered AccountantNidhi Somani & Co.
Chartered AccountantWalker Chandiok & Co LLP
Chartered AccountantJhanwar & Maheshwari
PartnerRole in project
Sunteck Realty Limited-

Litigation declared1

CaseCourtStatus
127 of 2019/2019NCLTPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jun 2024

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Annexure E-Form 4- Architect Certificate Maxx 4.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Max world 4.pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Annexure E-Form 4- Architect Certificate Maxx 4.pdf13 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-4 Hill View 1_Mar-24.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-4 Hill View 1_Mar-24.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2024 03 FORM 2A Quality Assurance Certificate Maxx4.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-4 Hill View 1_Mar-24.pdf26 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2024 02 16 SPA VP 006 OCC.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-4 Hill View 1_Jan-24.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-4 Hill View 1_Jan-24.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-4 Hill View 1_Jan-24 Compress.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-4 Hill View 1_Sep-23.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-4 Hill View 1_Sep-23.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-4 Hill View 1_Sep-23 Compress.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Maxx World 4.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-4 Hill View 1_June-23.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-4 Hill View 1_June-23.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-4 Hill View 1_June-23 Compress.pdf5 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality Assurance Certificate Maxx4-10_Mar-23.pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-4 Hill View 1_Mar-23.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-4 Hill View 1_Mar-23.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-4 Hill View 1_Mar-23.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-4 Hill View 1_Jan-23.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-4 Hill View 1_Jan-23.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-4 Hill View 1_Jan-23.pdf21 Jan 2023
Details of encumbrancesFile: 2022 12 23 Encumbrance Certificate Maxx4.pdf31 Dec 2022
Declaration about Commencement CertificateFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE_Maxx4.pdf2 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-4 Hill View 1_Oct-22.pdf12 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-4 Hill View 1_Oct-22.pdf12 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-4 Hill View 1_Oct-22.pdf12 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Maxx4_2021-22.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 ARCHITECT'S CERTIFICATE Max4_July-22.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Maxx4_July-22.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 07_Form 3-CA Certificate Maxx4_July-22.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 ARCHITECT'S CERTIFICATE Max4_Mar-22.pdf15 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Maxx4_Mar-22.pdf15 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx4-09_Mar-22.pdf15 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 03_Form 3-CA Certificate Maxx4_Mar-22.pdf15 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Maxx4_Jan-22.pdf14 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Maxx4_Jan-22.pdf14 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Maxx4_Jan-22.pdf14 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 01_Form 3-CA Certificate Maxx4_Jan-22.pdf13 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Certificates of CA (Form 5) Maxx4-2020-21 To upload.pdf11 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx4_Jan-22.pdf8 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx4-08_Dec-21.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Maxx4_Oct-21.pdf1 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 11_Form 3-CA Certificate Maxx4_Nov-21.pdf1 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx4_Oct-21.pdf12 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx4.pdf24 Sep 2021
Details of encumbrancesFile: CERSAI_Search_Report_Security_Interest_Id_Based_Search_16_07_2021_17_41_47_277.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx4_Aug-21.pdf23 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx4 - Revised June-21.pdf25 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx4 June 21 to upload.pdf22 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx4_Mar-21.pdf23 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Quality Assurance Certificate Maxx4 - Mar-05.pdf23 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: RDP 24 03 12 2020.pdf15 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: Scan_0507-15 .pdf15 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: Scan_0507-16 .pdf15 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: Scan_0507-17.pdf15 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Quality Assurance Certificate Maxx4 - Dec-04.pdf4 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: 3-12-2020 RDP (2).pdf28 Dec 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Quality Assurance Certificate Maxx4 - Jun-02.pdf24 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Quality Assurance Certificate Maxx4 - Sep-03.pdf24 Sep 2020
Building plan approvalFile: 58.pdf21 Jan 2020
Layout approvalFile: 58.pdf21 Jan 2020
Copy of Layout Approval (in case of layout)File: 58.pdf21 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: 58.pdf21 Jan 2020
Layout approvalFile: Scan 0395 01.pdf18 Jan 2020
Layout approvalFile: Scan 0395 02.pdf18 Jan 2020
PAN CardFile: SRL PAN.pdf18 Jan 2020
Copy of the legal title reportFile: 2020 01 13 Title Certificate SNo 54 HNo 7 2.pdf18 Jan 2020
Copy of the legal title reportFile: 2020 01 13 Title Certificate SNo 52 HNo 1.pdf18 Jan 2020
Copy of the legal title reportFile: 2020 01 13 Title Certificate SNo 55 HNo 4.pdf18 Jan 2020
Copy of the legal title reportFile: 2020 01 09 Title Certificate SNo 54 4 2.pdf18 Jan 2020
Copy of the legal title reportFile: 2019 01 26 Title Certificate SNo 52 HNo 5 2.pdf18 Jan 2020
Copy of the legal title reportFile: 2019 01 26 Title Certificate SNo 51 HNo 5.pdf18 Jan 2020
Copy of the legal title reportFile: 2019 01 26 Title Certificate SNo 51 HNo 4.pdf18 Jan 2020
Copy of the legal title reportFile: 2019 01 23 Title Certificate SNo 54 HNo 6.pdf18 Jan 2020
Copy of the legal title reportFile: 2016 07 02 Title Certificate SNo 51 HNo 7 8.pdf18 Jan 2020
Copy of the legal title reportFile: 2015 03 12 Title Certificate SNo 51 HNo 5 6 10.pdf18 Jan 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sunteck GrandeurSunteck Grandeur 42 S. V. Road near Andheri Subway Andheri West Mumbai 400 05720CompletedMar 2013Late, Jul 2014
Sunteck CentreSunteck Centre 37-40 Subhash Road Vile Parle East Mumbai 40005715CompletedSep 2009Late, Dec 2009

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck MaxxWorld 4, Tivri, Naigaon East on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tivri3,200+ in Palghar

Builder: Sunteck Realty Limited

Sunteck Realty Limited has 25 registrations on MahaRERA, including Sunteck City Avenue 1 and Sunteck City Avenue 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that Sunteck MaxxWorld 4, Tivri, Naigaon East shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sunteck MaxxWorld 4, Tivri, Naigaon East is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck MaxxWorld 4, Tivri, Naigaon East?

The registered promoter entity is Sunteck Realty Limited, a company as per the filing. Its CIN L32100MH1981PLC025346 and GSTIN 27AAACI0336E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck MaxxWorld 4, Tivri, Naigaon East?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sunteck MaxxWorld 4, Tivri, Naigaon East?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck MaxxWorld 4, Tivri, Naigaon East?

The professionals named in the filing: Architect: Sandeep Shikre & Associates; Architect: Ajay Wade & Associates; Engineer: Sanjay More; Engineer: Sameer Kotkar; Chartered Accountant: Nidhi Somani & Co.; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck MaxxWorld 4, Tivri, Naigaon East?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck MaxxWorld 4, Tivri, Naigaon East. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck MaxxWorld 4, Tivri, Naigaon East to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.