ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Sunteck HillView 2

Registered Litigation declared Others project

Sunteck HillView 2

By Sunteck Realty Limited

RG-MH-29219 · RERA P99000027956 · Last updated on MahaRERA portal: 26 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Completion date moved by 30 months
  • 1 extension taken
  • Rs 300.00 crore secured on the land, in favour of Axis Bank
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 30 months from the original
0 of 11Construction stages donefurthest along: Excavation, 0%
185 of 185Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

Sunteck HillView 2 is a Others project by Sunteck Realty Limited in Palghar, Maharashtra, registered with MahaRERA as P99000027956 on 21 Jan 2021. Possession is promised by 31 Dec 2029. The completion date has moved by 30 months from the original filing. 0 of the 185 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSunteck HillView 2
  • TypeOthers
  • Location
    • Tivri
    • Tivari
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • RERA no.P99000027956
  • ReraGenie IDRG-MH-29219

Builder

  • NameSunteck Realty Limited
  • Entity typeCompany
  • CINL32100MH1981PLC025346
  • GSTIN27AAACI0336E1Z3
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Company SecretaryRachana Vipul Hingarajia
  • Other registrations24 more →
  • Completed10 of 25
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJan 2021First promiseJun 2027Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jan 2021
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Jun 2027)
  • Buildings1 building record
  • Documents filed100 files

Current status

0%0 of 185 units booked
14.3%Work done, per cost certificate

Figures as on 26 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower-ANA24241850185

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Tower-A: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,871 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofAxis Bank
Secured amountRs 300.00 crore
Declared on30 Jun 2025
LandownerVillageDistrict
DDPL GLOBAL INFRASTRUCTURE PRIVATE LIMITEDBorivaliMumbai Suburban
UNICORN INFRAPROJECTS AND ESTATES PRIVATE LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI21100.02
Proposed, not sanctioned13,833 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSenorita, Plot No 11 Gulmohar Road, Near Juhu Circle Vile Parle West, Mumbai 400049
Estimated costRs 62.06 cr
Cost incurredRs 8.87 cr
Work done14.29%
BuildingWingEstimatedIncurred
Tower-ANARs 42.37 crRs 7.50 cr
-NARs 19.69 crRs 1.37 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIngrain
EngineerRaju HJ
Chartered AccountantJhanwar & Maheshwari
Chartered AccountantWalker Chandiok & Co LLP
PartnerRole in project
Sunteck Realty Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000024919Jun 2027 → Dec 2029

Reason as filed by the promoterExtended timelines for obtaining approvals from local authorities and other regulatory bodies can significantly delay project milestones. Furthermore, modifications to project layout, design, or configuration necessitated by regulatory compliance, market demand, or strategic decisions by the developer

Litigation declared3

CaseCourtStatus
127 of 2019/2019NCLTPending
127 of 2019/2019NCLTOngoing
127/2019/2019NCLTOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE HillView 2_Mar-26.pdf26 Apr 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Hill View 2_Mar-26.pdf26 Apr 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE HillView 2_Mar-26.pdf26 Apr 2026
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE HillView 2_Dec-25.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Hill View 2_Dec-25.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE HillView 2_Dec-25.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1-ARCHITECTu0027S CERTIFICATE HillView 2_Sep-25.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2-Engineer Certificate Hill View 2_Sep-25.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE Hill View 2_Sep-25.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: 2024-25_Form 5-CA CERTIFICATE ANNUAL REPORT Maxx6_2024-25.pdf25 Sep 2025
Withdrawal Update Form 1File: Form 1-ARCHITECTu0027S CERTIFICATE HillView 2_June-25.pdf4 Aug 2025
Withdrawal Update Form 2File: Form 2-Engineer Certificate Hill View 2_June-25.pdf4 Aug 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE Hill View 2_June-25.pdf4 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE HillView 2_Mar-25.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Hill View 2_Mar-25.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Hill View 2_Apr-25.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate Hill View 2_Mar-25.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Hill View 2_Apr-25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE HillView 2_Jan-25.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Hill View 2_Jan-25.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Hill View 2_Jan-25 .pdf24 Jan 2025
Declaration in FORM BFile: Affidavit cum-Declaration HillView 2 .pdf22 Nov 2024
Other - TechnicalFile: Details of approval received from Approving authority.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD HillView 2 12 11 2024.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2 Change Cost_June-24 Revised.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: VVCMCTPRDPSPA-VP-0006252024-25 HillView 2 compress .pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD HillView 2 As per CC 10 10 2024.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Tower A 08.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: jumbo 0058.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Tower A 09.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Tower A 07.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Tower A 06.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: VVCMCTPRDPSPA-VP-0006252024-25 Compress.pdf10 Oct 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Max world 6.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-6_June-24.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-6 Hill View 2_June-24 .pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2_June-24.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-6_Mar-24.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-6 Hill View 2_Mar-24.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2024 03 FORM 2A Quality Assurance Certificate Maxx6.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2_Mar-24.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-6_Jan-24.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-6 Hill View 2_Jan-24.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2_Jan-24.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-6_Sep-23.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-6 Hill View 2_Sep-23.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2_Sep-23.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Maxx World 6.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-6 Hill View 2_June-23.pdf7 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-6 Hill View 2_June-23.pdf7 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2_June-23.pdf7 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality Assurance Certificate Maxx6-10_Mar-23.pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-6 Hill View 2_Mar-23.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-6 Hill View 2_Mar-23.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2_Mar-23.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-6 Hill View 2_Jan-23.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-6 Hill View 2_Jan-23.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2_Jan-23.pdf21 Jan 2023
Details of encumbrancesFile: 2022 12 23 Encumbrance Certificate Maxx6.pdf31 Dec 2022
Declaration about Commencement CertificateFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE_Maxx6.pdf2 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Maxx-6 Hill View 2_Oct-22.pdf12 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Maxx-6 Hill View 2_Oct-22.pdf12 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Maxx-6 Hill View 2_Oct-22.pdf12 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Maxx6_2021-22.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx6_July-22.pdf10 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx6_July-22.pdf10 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 07_Form 3-CA Certificate Maxx6_July-22.pdf10 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx6_Mar-22.pdf16 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx6_Mar-22.pdf16 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx6-09_Mar-22.pdf16 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 03_Form 3-CA Certificate Maxx6_Mar-22.pdf16 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx6_Jan-22.pdf14 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx6_Jan-22.pdf8 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate Maxx6-05_Dec-21.pdf8 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 01_Form -3 CA Certificate - Sunteck MaxxWorld 6_Jan-22.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Maxx6_Oct-21.pdf28 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 CA Certificate - Sunteck MaxxWorld 6_Oct-21.pdf28 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Maxx6_Oct-21.pdf12 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-Maxxworld 6-2020-21.pdf30 Sep 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sunteck GrandeurSunteck Grandeur 42 S. V. Road near Andheri Subway Andheri West Mumbai 400 05720CompletedMar 2013Late, Jul 2014
Sunteck CentreSunteck Centre 37-40 Subhash Road Vile Parle East Mumbai 40005715CompletedSep 2009Late, Dec 2009

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 30 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck HillView 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tivri3,200+ in Palghar

Builder: Sunteck Realty Limited

Sunteck Realty Limited has 25 registrations on MahaRERA, including Sunteck City Avenue 1 and Sunteck City Avenue 2. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Sunteck HillView 2 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck HillView 2?

The registered promoter entity is Sunteck Realty Limited, a company as per the filing. Its CIN L32100MH1981PLC025346 and GSTIN 27AAACI0336E1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck HillView 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sunteck HillView 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck HillView 2?

The professionals named in the filing: Architect: Ingrain; Engineer: Raju HJ; Chartered Accountant: Jhanwar & Maheshwari; Chartered Accountant: Walker Chandiok & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck HillView 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck HillView 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck HillView 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.