ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Sun Platina

Registered No litigation declared Residential / Group Housing project

Sun Platina

By Jindal Mittal Graha Nirman Pvt. Ltd.

RG-MH-33108 · RERA P52100080580 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 37.50 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 70%
21 of 21Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

Sun Platina is a Residential / Group Housing project by Jindal Mittal Graha Nirman Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100080580 on 16 Jun 2025. Possession is promised by 31 Mar 2030. 0 of the 21 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSun Platina
  • TypeResidential / Group Housing
  • Location
    • N Main Road
    • Koregaon Park Annex
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080580
  • ReraGenie IDRG-MH-33108

Builder

  • NameJindal Mittal Graha Nirman Pvt. Ltd.
  • Entity typeCompany
  • CINU45202PN2002PTC016883
  • GSTIN27AABCJ3501F1Z2
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorAshok Ramchandra Mittal
  • Other registrations9 more →
  • Completed4 of 10
  • Declared earlier projects10 →

Key dates

this monthRegisteredJun 2025PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jun 2025
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed53 files

Current status

0%0 of 21 units booked
10.8%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sun PlatinaNA10621021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 70%.

Sun Platina: 6% average across the applicable activities

ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed99

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots99
Closed/Covered66
Open Space33

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,915 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 37.50 crore
CERSAI search filedYes
Declared on5 Jun 2026

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI19432.62
Proposed, not sanctioned6,099 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Uma, Cts No. 2027, Tilak Road, Sadashiv Peth, Pune Maharashtra.411030
Estimated costRs 59.52 cr
Cost incurredRs 6.45 cr
Work done10.84%
BuildingWingEstimatedIncurred
Sun PlatinaNARs 53.56 crRs 6.45 cr
-NARs 5.95 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkur Associates Kulkarni
EngineerDelcons Consultants India Private Limited
EngineerShankar Biswas
Chartered AccountantSTRG and Associates
PartnerRole in project
Jindal Mittal Graha Nirman Pvt. Ltd.-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500249Ram GawaliJindal Mittal Graha Nirman Pvt. Ltd.29/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf13 May 2026
Withdrawal Update Form 2File: Form 2.pdf13 May 2026
Withdrawal Update Form 3File: Form 3.pdf13 May 2026
Withdrawal Update Form 1File: Form 1 Jun 2025.pdf19 Mar 2026
Withdrawal Update Form 1File: Form 1 Sept 2025.pdf19 Mar 2026
Withdrawal Update Form 1File: Form 1 Dec 2025.pdf19 Mar 2026
Withdrawal Update Form 2File: Form 2 Jun 25.pdf19 Mar 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf19 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf19 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf19 Mar 2026
Withdrawal Update Form 3File: Form 3 Sept 2025.pdf19 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf19 Mar 2026
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Letter.pdf6 Jun 2025
Copy of the legal title reportFile: Legal Title Report.pdf30 May 2025
Details of encumbrances concerned to FinanceFile: Declaration Finance.pdf30 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sun Platina.pdf30 May 2025
Other - LegalFile: Sale Deed.pdf30 May 2025
Other - LegalFile: Property Card.pdf30 May 2025
Other - LegalFile: Correction Deed.pdf30 May 2025
CERSAI detailsFile: Declaration Cersai.pdf30 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf30 May 2025
Details of encumbrances concerned to LegalFile: Declaration Finance.pdf30 May 2025
Other - TechnicalFile: Annexure A.pdf25 Apr 2025
Proforma of Allotment letterFile: Allotment Letter.pdf14 Apr 2025
Declaration in FORM BFile: Form B Declaration of Promoter.pdf14 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment.pdf14 Apr 2025
Other - FinanceFile: Declaration on Stamp about RERA Bank Accounts.pdf14 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf14 Apr 2025
Proforma of Agreement for saleFile: Agreement Drfat.pdf14 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured - Unsecured Finance.pdf14 Apr 2025
Layout approvalFile: Layout.pdf26 Mar 2025
Building plan approvalFile: IOD 1.pdf26 Mar 2025
Building plan approvalFile: IOD 2.pdf26 Mar 2025
Building plan approvalFile: IOD 3.pdf26 Mar 2025
Building plan approvalFile: IOD 4.pdf26 Mar 2025
Building plan approvalFile: IOD 5.pdf26 Mar 2025
Building plan approvalFile: IOD 6.pdf26 Mar 2025
Building plan approvalFile: IOD 7.pdf26 Mar 2025
PAN CardFile: PAN - JMGNPL.pdf26 Mar 2025
Details of encumbrances concerned to FinanceFile: Self Declaration - Legal encumbrances.pdf26 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout.pdf26 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD 1.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD 7.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD 6.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD 5.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD 4.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD 3.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD 2.pdf26 Mar 2025
Declaration about Commencement CertificateFile: Declaration about Commencement.pdf26 Mar 2025
Details of encumbrances concerned to LegalFile: Self Declaration - Legal encumbrances.pdf26 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - NRM.pdf26 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of Interest - ARM.pdf26 Mar 2025

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise3 delivered late5 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SUN GLORYPR1260002600531Sadashiv Peth, Pune96May 2026OngoingMar 2031Not due yet
SUN REGALIAPR1261012502103Wadgaon Bk, Pune147Jan 2026OngoingDec 2030Not due yet
SUN GARNETPR1260002502092Mundhawa, Pune129Jan 2026OngoingDec 2030Not due yet
SUN APEXPR1261012501939AMBEGAON Bk, Pune140Dec 2025OngoingDec 2030Not due yet
Sun EmeraldP52100055372Raghavendra Nagar150Mar 2024OngoingDec 2029Not due yet
Sun Exotica Phase 2P52100018347S. No. 10/2/4, Pune-Oct 2018CompletedJun 2021Late, Mar 2023
Sun Planet Phase IIIP52100018258Anand Nagar, Pune-Oct 2018CompletedDec 2019Late, Jan 2020
Sun SapphireP52100001938-, Pune-Jul 2017CompletedDec 2018Late, Jun 2019
Sun Exotica Phase 1P52100001696-, Pune-Jul 2017CompletedDec 2018Dec 2018

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sun Platina on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Koregaon Park Annex13,700+ in Pune

2 kmSun PlatinaCompleted 19Lapsed / revoked 11Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: Jindal Mittal Graha Nirman Pvt. Ltd.

Jindal Mittal Graha Nirman Pvt. Ltd. has 10 registrations on MahaRERA, including Sun Exotica Phase 1 and Sun Sapphire. Its filings disclose 10 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sun Platina is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sun Platina?

The registered promoter entity is Jindal Mittal Graha Nirman Pvt. Ltd., a company as per the filing. Its CIN U45202PN2002PTC016883 and GSTIN 27AABCJ3501F1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sun Platina?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sun Platina?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sun Platina?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sun Platina?

The professionals named in the filing: Architect: Ankur Associates Kulkarni; Engineer: Delcons Consultants India Private Limited; Engineer: Shankar Biswas; Chartered Accountant: STRG and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sun Platina?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sun Platina. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sun Platina to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.