Home / Browse projects / Pune, Maharashtra / Basil Mondale
Basil Mondale
RG-MH-22614 · RERA P52100033136 · Last updated on MahaRERA portal: 20 Jan 2026
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Basil Mondale is a Residential / Group Housing project by velx constructions llp in Pune, Maharashtra, registered with MahaRERA as P52100033136 on 9 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 534 of the 542 units on this registration are recorded sold or booked, and 40 of 66 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameBasil Mondale
- TypeResidential / Group Housing
- Location
- keshavnagar Chowk
- Keshavnagar
- Mundhawa
- Haveli
- Pune
- 411036
- Pincode411036
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100033136
- ReraGenie IDRG-MH-22614
Builder
- Namevelx constructions llp
- Entity typeOthers
- PartnersAnanta Revannath Darwatkar, Nilesh Dilip Ghule, Gopal Shivraj Varma
- Named personsGsv Developers LLP, Chandrangan Developers llp, N D Ghule Constructions LLP, Vishakha Balasaheb Disale, Pragati balasaheb Disale, Neeraj Dineshkumar Soni, Ulhas Revannath Darwatkar, Smita Nilesh ghule
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 Feb 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings6 building records
- Documents filed151 files
Current status
Figures as on 20 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A1 | NA | 16 | 14 | 112 | 0 | 112 |
| WING A2 | NA | 16 | 14 | 112 | 0 | 112 |
| Wing A3 | NA | 16 | 14 | 54 | 0 | 54 |
| Wing A6 | NA | 12 | 10 | 40 | 0 | 40 |
| Wing A4 | NA | 16 | 14 | 112 | 0 | 112 |
| Wing A5 | NA | 16 | 14 | 112 | 0 | 112 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
40 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 85%.
WING A182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING A282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing A382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing A655%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Wing A463%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 55% |
Wing A559%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 55% |
Progress on shared amenities15
As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 65% |
| Community Buildings | Yes | 45% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 55% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 65% |
| Electrical meter room, sub-station, receiving station | Yes | 65% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed554
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A1 | 110 | 110 |
| WING A2 | 110 | 110 |
| Wing A3 | 54 | 54 |
| Wing A6 | 60 | 60 |
| Wing A4 | 110 | 110 |
| Wing A5 | 110 | 110 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| P A Inamdar | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A1 | NA | Rs 21.32 cr | Rs 20.51 cr |
| WING A2 | NA | Rs 21.32 cr | Rs 20.51 cr |
| Wing A3 | NA | Rs 21.32 cr | Rs 20.51 cr |
| Wing A6 | NA | Rs 21.32 cr | Rs 20.51 cr |
| Wing A4 | NA | Rs 21.32 cr | Rs 20.51 cr |
| Wing A5 | NA | Rs 21.32 cr | Rs 20.51 cr |
| - | NA | Rs 9.05 cr | Rs 8.94 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Cubix Architech |
| Architect | R S ASSOCIATES |
| Engineer | Rathis group |
| Engineer | Ajit Kumar |
| Engineer | CHETAN TANAJI MANGADE |
| Chartered Accountant | KJS AND ASSOCIATES |
| Chartered Accountant | SOLANKE AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| velx constructions llp | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601838 | Sri Rangarajan | velx constructions llp | 29/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jul 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed151
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Occupancy Certificate.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: VELX Architect Certificate.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: VELX Architect Certificate.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: VELX Engineer Certificate.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: VELX Engineer Certificate.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: Velx CA Certificate_compressed.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: Velx CA Certificate_compressed.pdf | 13 Oct 2025 |
| Form 5 (FY 2024-2025)File: VELX Annexure F Form 5.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: Architects Certificate- Velx Construction LLP.pdf | 8 Sep 2025 |
| Withdrawal Update Form 1File: Architects Certificate- Velx Construction LLP.pdf | 8 Sep 2025 |
| Withdrawal Update Form 1File: Architects Certificate- Velx Construction LLP.pdf | 8 Sep 2025 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE FORM - 2.pdf | 8 Sep 2025 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE FORM - 2.pdf | 8 Sep 2025 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE FORM - 2.pdf | 8 Sep 2025 |
| Withdrawal Update Form 3File: CA - CERTIFICATE - Velx Constructions LLP UPDATED JUNE_compressed.pdf | 8 Sep 2025 |
| Withdrawal Update Form 3File: CA - CERTIFICATE - Velx Constructions LLP UPDATED JUNE_compressed.pdf | 8 Sep 2025 |
| Withdrawal Update Form 3File: CA - CERTIFICATE - Velx Constructions LLP UPDATED JUNE_compressed.pdf | 8 Sep 2025 |
| Form 2A (FY 2021-2022)File: Velx Form 2A March 2022(1).pdf | 8 Sep 2025 |
| Form 2A (FY 2022-2023)File: Velx Form 2A March 2023(1).pdf | 8 Sep 2025 |
| Form 2A (FY 2023-2024)File: Velx Form 2A March 2024.pdf | 8 Sep 2025 |
| Form 2A (FY 2024-2025)File: Velx Form 2A March 2025.pdf | 8 Sep 2025 |
| Form 5 (FY 2021-2022)File: (Form 5) (FY 2021-22).pdf | 8 Sep 2025 |
| Form 5 (FY 2022-2023)File: (Form 5) (FY 2022-23).pdf | 8 Sep 2025 |
| Form 5 (FY 2023-2024)File: (Form 5) (FY 2023-24).pdf | 8 Sep 2025 |
| Withdrawal Update Form 1File: Architects Certificate- Velx Construction LLP.pdf | 13 Aug 2025 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE FORM - 2.pdf | 13 Aug 2025 |
| Withdrawal Update Form 3File: CA - CERTIFICATE - Velx Constructions LLP - converted.pdf | 13 Aug 2025 |
| Layout approvalFile: Layout Plan.pdf | 3 Jul 2025 |
| Building plan approvalFile: A1 (1).pdf | 3 Jul 2025 |
| Building plan approvalFile: A2 (1).pdf | 3 Jul 2025 |
| Building plan approvalFile: A3.pdf | 3 Jul 2025 |
| Building plan approvalFile: A5.pdf | 3 Jul 2025 |
| Building plan approvalFile: A4.pdf | 3 Jul 2025 |
| Building plan approvalFile: A6.pdf | 3 Jul 2025 |
| Building plan approvalFile: B1 and B2.pdf | 3 Jul 2025 |
| Building plan approvalFile: Elevation & Ground Floor Plan.pdf | 3 Jul 2025 |
| Building plan approvalFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13,14th or Section B - B (Wing A2).pdf | 8 Mar 2025 |
| Building plan approvalFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13,14th or Section C - C (Wing A3).pdf | 8 Mar 2025 |
| Building plan approvalFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13,14th or Section D - D (Wing A4).pdf | 8 Mar 2025 |
| Building plan approvalFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13,14th or Section A - A (Wing A5).pdf | 8 Mar 2025 |
| Building plan approvalFile: Elevation, Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10 or Section F - F (Wing A6).pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13,14th or Section B - B (Wing A2).pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13,14th or Section C - C (Wing A3).pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13,14th or Section D - D (Wing A4).pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13,14th or Section A - A (Wing A5).pdf | 8 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Elevation, Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10 or Section F - F (Wing A6).pdf | 8 Mar 2025 |
| Building plan approvalFile: Layout Plan.pdf | 7 Mar 2025 |
| Building plan approvalFile: Basement 1, 2 floor Plan.pdf | 7 Mar 2025 |
| Building plan approvalFile: Elevation, Ground Floor Plan.pdf | 7 Mar 2025 |
| Building plan approvalFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13, 14th or Section A - A (Wing A1).pdf | 7 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout Plan.pdf | 7 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Basement 1, 2 floor Plan.pdf | 7 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Elevation, Ground Floor Plan.pdf | 7 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Typical Floor Plan 1, 2,3,4,5,6,7,8,9,10,11,12,13, 14th or Section A - A (Wing A1).pdf | 7 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (1).pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Basil Mondale.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Basil Mondale_11zon.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Basil Mondale.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List final.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1 Basil Mondale.pdf | 12 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2 Basil Mondale.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold MONDALE FINAL.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold MONDALE FINAL.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Basil Mondale FINAL.pdf | 12 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BASIL MONDALE CA CERTIFICATE.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter Basil Mondale 11zon.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE 11zon.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 19 Oct 2024 |
| Building plan approvalFile: 2.pdf | 30 Mar 2024 |
| Building plan approvalFile: RERA UPLOAD.pdf | 30 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 30 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: RERA UPLOAD.pdf | 30 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 5 COMMENCEMENT CERTIFICATES.pdf | 30 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_Scanned.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q3 FY 23-24.pdf | 12 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-0252-23.pdf | 12 Jun 2023 |
| Building plan approvalFile: Wing A 1_6_11zon.pdf | 22 May 2023 |
| Building plan approvalFile: Wing A 2_5_11zon.pdf | 22 May 2023 |
| Building plan approvalFile: Wing A 3_4_11zon.pdf | 22 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 151 filed documents as one ZIP, foldered, with a manifest
Keep Basil Mondale on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Keshavnagar13,700+ in Pune
Filed coordinates, straight-line distance. 433 registered projects within 2 km.
Godrej Aqua Vista
Oxford Realty LLP
Godrej Elaris
Godrej Properties Limited
Sukhwani Hermosa Casa
Sukhwani Associates
TREMONT D, E AND F WINGS
The Excellaa
ATELIER GREENS
ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADAN
Jhamtani BizCore
DUSK REALTY LLP
Builder: velx constructions llp
velx constructions llp has 1 registration on MahaRERA, including Basil Mondale. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Basil Mondale is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Basil Mondale?
The registered promoter entity is velx constructions llp, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Basil Mondale?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Basil Mondale?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Basil Mondale?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Basil Mondale?
The professionals named in the filing: Architect: Cubix Architech; Architect: R S ASSOCIATES; Engineer: Rathis group; Engineer: Ajit Kumar; Engineer: CHETAN TANAJI MANGADE; Chartered Accountant: KJS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Basil Mondale?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback