Completed Litigation declared Residential / Group Housing project

ATELIER GREENS

By ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)

RG-MH-39637 · RERA P52100018596 · Last updated on MahaRERA portal: 5 Mar 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 10 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 200.00 crore secured on the land, in favour of ICICI Bank

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
57 of 66Construction stages doneacross 6 buildings; furthest along: Sanitary Fittings within the flats /..., 75%
47 of 319Units unsoldnot recorded sold or booked
10Complaints at MahaRERAon this registration
Jump to the 240 documents Report an error

ATELIER GREENS is a Residential / Group Housing project by ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP) in Pune, Maharashtra, registered with MahaRERA as P52100018596 on 21 Nov 2018. The registration is recorded completed; possession was promised by 30 Sep 2025. The completion date has moved by 12 months from the original filing. 272 of the 319 units on this registration are recorded sold or booked, and 57 of 66 construction stages are filed complete. 10 complaints are on record with the regulator.

At a glance

Project

  • NameATELIER GREENS
  • TypeResidential / Group Housing
  • Location
    • NORTH MAIN ROAD
    • MUNDWA
    • Keshavnagar-Mundwa
    • Pune City
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018596
  • ReraGenie IDRG-MH-39637

Builder

  • NameESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)
  • Entity typeCompany
  • DirectorJACKBASTIAN JACKBASTIAN
  • Declared earlier projects12 →

Key dates

this monthRegisteredNov 2018First promiseSep 2024Revised toSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Nov 2018
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 30 Sep 2024)
  • Buildings6 building records
  • Documents filed240 files

Current status

85%272 of 319 units booked
96.2%Work done, per cost certificate

Figures as on 5 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A1NA181572072
TOWER A2NA181567067
TOWER A3NA181567067
TOWER B1NA181542042
TOWER B2NA181542042
TOWER CNA181529029

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 5 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

57 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.

TOWER A188%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER A391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER B188%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER B289%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes70%
Open ParkingNoNot applicable

Parking filed1266

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,266
Closed/Covered1,266
BuildingClosed/CoveredTotal
TOWER A1296296
TOWER A2312312
TOWER A3282282
TOWER B1131131
TOWER B2150150
TOWER C9595

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area12,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI Bank
Secured amountRs 200.00 crore
CERSAI search filedYes
Declared on10 Sep 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI47541.53
Proposed, not sanctioned47,542 sq m
Buildings approved7
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBKC E BLOCK BANDRA EAST MUMBAI
Estimated costRs 4,798.77 cr
Cost incurredRs 4,615.71 cr
Work done96.19%
BuildingWingEstimatedIncurred
-NARs 4,576.42 crRs 4,393.36 cr
TOWER A3NARs 45.63 crRs 45.63 cr
TOWER A2NARs 43.65 crRs 43.65 cr
TOWER A1NARs 42.16 crRs 42.16 cr
TOWER CNARs 31.26 crRs 31.26 cr
TOWER B2NARs 30.23 crRs 30.23 cr
TOWER B1NARs 29.42 crRs 29.42 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVOUSSOIRS
EngineerKaustubh Tamhankar
EngineerSudhir B Kulkarni
Chartered AccountantB R Nagda Co
Chartered AccountantKaushal Manish & Co
Chartered AccountantDharmish Parikh & Co LLP
PartnerRole in project
ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017518Sep 2024 → Sep 2025

Reason as filed by the promoterWe hereby request you to kindly extend the registration by period of 12 months in terms of section 6 of the RERA due to unavoidable circumstances in the regular development of the Real Estate Project. Please note that this extension will only be in the interest of the flat purchasers who will continue to have the protection of the statute.

Litigation declared4

CaseCourtStatus
494/2014DIVISIONAL OFFICER PUNEClosed
445/2016CIVIL JUDGE SENIOR DIVISIONOngoing
508/2013CIVIL JUDGE SENIOR DIVISION PUNEOngoing
494/2014Divisional Officer PuneClosed

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC005000000064919Ms.Apoorva V. Sejpal, Mr.Umang V. Sejpal and Mr. Vijay R.SejpalEsteem Constructions Private Limited (Adani Group)23/12/2020
CC005000000279924MOHAN GUJARM/s. Esteem Constructions Pvt. Ltd31/01/2024
CC12502811Amit KumarESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)11/08/2025
CC12502486CHANDRAKANT MOHANLAL BHANSALIESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)19/07/2025
CC12600388Lathika HindujaESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)21/01/2026
CC12600390Shweta Bhavin ModiESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)21/01/2026
CC12601832CHANDRAKANT MOHANLAL BHANSALIESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)28/03/2026
CC12602317ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)Monika Verma19/04/2026
CC12602746prashant kashinath aherESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)11/05/2026
CC12603602Jagannath AroraESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)11/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed240

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 240 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Part Occupancy Certificate_15_07_2025.pdf5 Mar 2026
Occupational CertificateFile: Part Occupancy Certificate_30_09_2025.pdf5 Mar 2026
Occupational CertificateFile: Atelier Greens_Form 4.pdf5 Mar 2026
Withdrawal Update Form 1File: Form1AtelierGreenSept25.pdf13 Jan 2026
Withdrawal Update Form 2File: Form2AtelierGreensSept25.pdf13 Jan 2026
Withdrawal Update Form 3File: Form3AtelierGreensSept25.pdf13 Jan 2026
Layout approvalFile: Layout plan dated 18-06-2024.pdf27 Nov 2025
Building plan approvalFile: All towers - Gr_stilt_basement_1 and 2 Floor Parking.pdf27 Nov 2025
Building plan approvalFile: Tower A1 - 1_ 2_4_6_ 8 and 10 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A1 - 7 and 12 refuge flr - 3_5_ 9_11 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A1 - 13 to 15 and Terrace Floor area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A1 - Section Plan.pdf27 Nov 2025
Building plan approvalFile: Tower A1 - Section and Elevation Plan.pdf27 Nov 2025
Building plan approvalFile: Tower A2 - 1 and 2 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A2 - 3 to 11 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A2 - 12 to 15 and Terrace flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A2 - Section Plan.pdf27 Nov 2025
Building plan approvalFile: Tower A2 - Elevation Plan.pdf27 Nov 2025
Building plan approvalFile: Tower A3 - 1 and 2 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A3 - 3 to 11 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A3 - 12 to 15 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower A3 - Terrace floor and Section Plan.pdf27 Nov 2025
Building plan approvalFile: Tower A3 - Elevation Plan.pdf27 Nov 2025
Building plan approvalFile: Tower B1 - 1_ 2_4_ 6_ 8 and 10 flr_ area plan.pdf27 Nov 2025
Building plan approvalFile: Tower B1 - 7 and 12 refuge flr - 3_5_ 9_11 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower B1 - 13 to 15 and Terrace Floor area plan.pdf27 Nov 2025
Building plan approvalFile: Tower B1 - Section Plan.pdf27 Nov 2025
Building plan approvalFile: Tower B1 - Elevation Plan.pdf27 Nov 2025
Building plan approvalFile: Tower B2 - 1 to 11 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower B2 - 12 to 15 and Terrace flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower B2 - Section Plan.pdf27 Nov 2025
Building plan approvalFile: Tower B2 - Elevation Plan.pdf27 Nov 2025
Building plan approvalFile: Tower C - 1 to 6 and 8 to 10 flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower C - 7_11 to 15 Flr_ area plan.pdf27 Nov 2025
Building plan approvalFile: Tower C- Section Plan.pdf27 Nov 2025
Building plan approvalFile: Tower C - Elevation Plan.pdf27 Nov 2025
Building plan approvalFile: Tower D - 1 to 6_7 and Terrace flr area plan.pdf27 Nov 2025
Building plan approvalFile: Tower D- Section and Elevation Plan.pdf27 Nov 2025
Layout approvalFile: Layout plan- Dt 18102024.pdf4 Nov 2025
Layout approvalFile: Layout plan- Dt 18102024.pdf30 Oct 2025
Withdrawal Update Form 1File: Form1AtelierGreen Jun25.pdf30 Oct 2025
Withdrawal Update Form 2File: Form2AtelierGreen Jun25.pdf30 Oct 2025
Withdrawal Update Form 3File: Form3AtelierGreen Jun25.pdf30 Oct 2025
Withdrawal Update Form 1File: Form1AtelierGreen Jun25.pdf29 Oct 2025
Withdrawal Update Form 2File: Form2AtelierGreen Jun25.pdf29 Oct 2025
Withdrawal Update Form 3File: Form3AtelierGreen Jun25.pdf29 Oct 2025
Layout approvalFile: Latest Plan MUNDHWA SR NO 83 A IOD LAYOUT PLAN.pdf18 Sep 2025
Layout approvalFile: Parking Plan.pdf18 Sep 2025
Withdrawal Update Form 1File: Form 1 Atelier Green RERA Architect Certificate.pdf7 Aug 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate.pdf7 Aug 2025
Withdrawal Update Form 3File: Form 3 RERA Certificate Atelier Greens.pdf7 Aug 2025
Building plan approvalFile: Revised CC dated 18 June 2024.pdf16 Jul 2025
Layout approvalFile: MUNDHWA SR 83 A IOD LAYOUT PLAN 2024.pdf16 Jul 2025
Commencement certificateFile: Revised CC dated 31 March 2022.pdf3 Jul 2025
Commencement certificateFile: Revised CC dated 04 May 2023.pdf3 Jul 2025
Commencement certificateFile: Revised CC dated 18 June 2024.pdf3 Jul 2025
Form 5 (FY 2024-2025)File: Form5AtelierGreenJun25.pdf1 Jul 2025
Form 2A (FY 2018-2019)File: 2A - 2019.pdf30 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A March FY 2023 2024.pdf30 Jun 2025
Form 2A (FY 2023-2024)File: Form 2A March FY 2023 2024.pdf30 Jun 2025
Form 2A (FY 2021-2022)File: Form 2A March FY 2021 2022.pdf30 Jun 2025
Form 2A (FY 2022-2023)File: Form 2A March FY 2022 2023.pdf30 Jun 2025
Form 2A (FY 2020-2021)File: Form 2A March FY 2020 2021.pdf30 Jun 2025
Form 2A (FY 2019-2020)File: 2A - 2020.pdf30 Jun 2025
Form 5 (FY 2018-2019)File: Form 5 April 2018 to March 2019.pdf30 Jun 2025
Form 5 (FY 2019-2020)File: Form 5 April 2019 to March 2020.pdf30 Jun 2025
Form 5 (FY 2020-2021)File: Form 5 April 2020 to March 2021.pdf30 Jun 2025
Form 5 (FY 2021-2022)File: Form 5 April 2021 to March 2022.pdf30 Jun 2025
Form 5 (FY 2022-2023)File: Form 5 April 2022 to March 2023.pdf30 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 - Atelier Greens.pdf26 Jun 2025
Form 1File: Form 1 Atelier June 23 1.pdf10 Jun 2025
Form 2File: Form 2 Atelier June 23.pdf10 Jun 2025
Form 3File: Form 3 CA certificate Esteem June 23.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Atelier Disclosure sold unsold June 23 1.pdf10 Jun 2025
OthersFile: Form2AEngineer Certificate for Quality Assurance June 23.pdf10 Jun 2025
Form 1File: Form 1 Atelier quarter 310323.pdf10 Jun 2025
Form 2File: Form 2 Atelier 310323.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Atelier Disclosure sold unsold Mar 23.pdf10 Jun 2025
OthersFile: Form2A Quarter 310323.pdf10 Jun 2025
Form 3File: 31032023 CA Certificate ESTEEM RERA2.pdf10 Jun 2025

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WESTERN HEIGHTS PHASE 2 COMMERCIAL 1ST AND 2ND FLOORJP ROAD OPP GURU DWARA FOUR BUNGALOWS ANDHERI WEST MUMBAI 40005844CompletedJun 2018Late, Dec 2018
WESTERN HEIGHTS - PHASE 1 RESIDENTIALJP ROAD OPP GURU DWARA FOUR BUNGALOWS ANDHERI WEST MUMBAI 400058420CompletedJun 2018Late, Dec 2018
WATERLILIY PHASE 4Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421172CompletedJun 2018Jun 2018
Meadows D,E AND FShantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421612CompletedJun 2018Jun 2018
Meadows A,B AND CShantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421512CompletedJun 2018Jun 2018
WATERLILY PHASE 3Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421120CompletedDec 2017Dec 2017
WATERLILY PHASE 2Shantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421172CompletedDec 2017Dec 2017
Meadows J AND KShantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421365CompletedDec 2017Dec 2017
Meadows G,H AND IShantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 382421440CompletedDec 2017Dec 2017
INSPIRE BKC PHASE 2 SIXTH AND SEVENTH FLOORVILLAGE KOLE KALYAN OPP ICICI BANK NEAR MAHANAGAR GAS LTD BANDRA KURLA COMPLEX BANDRA E 40005111CompletedDec 2017Oct 2017
INSPIRE BKC PHASE 1 GROUND TO FORTH FLOORVILLAGE KOLE KALYAN OPP ICICI BANK NEAR MAHANAGAR GAS LTD BANDRA KURLA COMPLEX BANDRA E MUMBAI 40005161CompletedDec 2017Oct 2017
SHOPPERS PLAZAShantigram Nr Vaishnodevi Circle Off S G Road Ahmedabad 38242185CompletedMar 2017Mar 2017

How this compares with Pune

85%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATELIER GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUNDWA13,700+ in Pune

2 kmATELIER GREENSCompleted 19Lapsed / revoked 11Other 61Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP)

ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP) has 1 registration on MahaRERA, including ATELIER GREENS. Its filings disclose 12 earlier MahaRERA projects: declares 10 of 12 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ATELIER GREENS is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATELIER GREENS?

The registered promoter entity is ESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP), a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATELIER GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ATELIER GREENS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ATELIER GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATELIER GREENS?

The professionals named in the filing: Architect: VOUSSOIRS; Engineer: Kaustubh Tamhankar; Engineer: Sudhir B Kulkarni; Chartered Accountant: B R Nagda Co; Chartered Accountant: Kaushal Manish & Co; Chartered Accountant: Dharmish Parikh & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATELIER GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATELIER GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATELIER GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.