Home / Browse projects / Palghar, Maharashtra / STAR SAMRUDDHI

Completed No litigation declared Residential / Group Housing project

STAR SAMRUDDHI

By STAR BUILDERS & DEVELOPERS

RG-MH-69905 · RERA P99000047822 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

STAR SAMRUDDHI is a Residential / Group Housing project by STAR BUILDERS & DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000047822 on 28 Nov 2022. The registration is recorded completed; possession was promised by 31 Dec 2027. 55 of the 56 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSTAR SAMRUDDHI
  • TypeResidential / Group Housing
  • Location
    • CHANDRAPADA
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000047822
  • ReraGenie IDRG-MH-69905

Builder

  • NameSTAR BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersRiyaz Vahed Chhatrisa, Ashiq Hussain Hemani
  • Other registrations7 more →
  • Completed6 of 8
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2022PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Nov 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

98%55 of 56 units booked
100.0%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RESIDENTIAL BUILDING NO-2NA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

RESIDENTIAL BUILDING NO-2: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered4
Open Space7

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,798 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNICIPAL CORPORATION
Permissible FSI2211.72
Proposed, not sanctioned2,212 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM BARIA,UNIQUE BLDG NO-10,TIRUPATI NAGAR,VIRAR WEST,PINCODE-401303
Estimated costRs 6.32 cr
Cost incurredRs 6.32 cr
Work done100.0%
BuildingWingEstimatedIncurred
RESIDENTIAL BUILDING NO-2NARs 5.69 crRs 5.69 cr
-NARs 63.18 lakhRs 63.18 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKULDEEP PATIL ARCHITECT
EngineerSS AASOCIATES
Chartered AccountantPALLAVI P BARAPATRE
PartnerRole in project
STAR BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Mar 2025

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: SAMRUDDHI FORM1.pdf9 Jun 2026
Withdrawal Update Form 1File: SAMRUDDHI FORM1.pdf9 Jun 2026
Withdrawal Update Form 1File: SAMRUDDHI FORM1.pdf9 Jun 2026
Withdrawal Update Form 1File: SAMRUDDHI FORM1.pdf9 Jun 2026
Withdrawal Update Form 2File: SAMRUDDHI FORM2.pdf9 Jun 2026
Withdrawal Update Form 2File: SAMRUDDHI FORM2.pdf9 Jun 2026
Withdrawal Update Form 2File: SAMRUDDHI FORM2.pdf9 Jun 2026
Withdrawal Update Form 2File: SAMRUDDHI FORM2.pdf9 Jun 2026
Withdrawal Update Form 3File: SAMRUDDHI FORM3.pdf9 Jun 2026
Withdrawal Update Form 3File: SAMRUDDHI FORM3.pdf9 Jun 2026
Withdrawal Update Form 3File: SAMRUDDHI FORM3.pdf9 Jun 2026
Withdrawal Update Form 3File: SAMRUDDHI FORM3.pdf9 Jun 2026
Occupational CertificateFile: SAMRUDDHI OC.pdf9 Jun 2026
Occupational CertificateFile: PART OC EXPLANATION.pdf9 Jun 2026
Occupational CertificateFile: OC VERIFICATION MAIL.pdf9 Jun 2026
Occupational CertificateFile: SAMRUDDHUI FORM4.pdf9 Jun 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC VERIFICATION MAIL.pdf5 Mar 2025
Other - TechnicalFile: Part OC Explanation.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Samruddhi.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Samruddhi - Sold Unsold dec 24.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf28 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Samruddhi OC Copy.pdf26 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Samruddhi - Form 3_compressed.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: Samruddhi - sold unsold list.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Star Samruddhi.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Star samruddhi.pdf4 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Samruddhi Form 2A.pdf25 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Samruddhi Form 5 23-24.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: Samruddhi Sold Unsold 300624.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Samruddhi form 1 (June 24 end).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Samruddhi Firm - 2.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Samruddhi Form 2A- 22-23.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Star Samruddhi - Form 3.pdf4 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form - 5.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Samruddhi - Form 1.pdf26 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Star Samruddhi - Form 2.pdf26 Jan 2024
Disclosure of sold/ booked inventoryFile: Star Samruddhi Sold Unsold Inventory (1).pdf26 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Samruddhi - Form 5-FY-21-22.pdf29 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Samruddhi - Form 5-FY-22-23.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Samruddhi Form - 1.pdf15 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Samruddhi Form - 2.pdf15 May 2023
Disclosure of sold/ booked inventoryFile: Star Samruddhi Sold unsold inventory.pdf15 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Samruddhi Form 3_compressed.pdf15 May 2023
Proforma of Agreement for saleFile: STAR SAMRUDDHI RERA DRAFT AGREEMENT - updated.pdf29 Apr 2023
Other - LegalFile: Declaration of Partners - Star Samruddhi.pdf29 Apr 2023
Proforma of Agreement for saleFile: STAR SAMRUDDHI RERA DRAFT AGREEMENT.pdf22 Feb 2023
Copy of the legal title reportFile: STAR SAMRUDDHI TITLE REPORT_compressed.pdf3 Nov 2022
Proforma of Allotment letterFile: 2 Proforma of draft sale star samruddhi.pdf29 Oct 2022
Declaration about Commencement CertificateFile: C C Declaration.pdf6 Oct 2022
Proforma of Agreement for saleFile: STAR SAMRUDDHI chandrapada rera.pdf6 Oct 2022
Building plan approvalFile: MYSCAN_20220913_0001.PDF27 Sep 2022
Layout approvalFile: Layout paln star samruddhi.pdf27 Sep 2022
Details of encumbrances concerned to FinanceFile: Finance Encumbrance Declaration.pdf27 Sep 2022
Details of encumbrances concerned to LegalFile: Legal Encumbrance Declaration.pdf27 Sep 2022
Copy of Layout Approval (in case of layout)File: Layout paln star samruddhi.pdf27 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20220913_0001.PDF27 Sep 2022
Declaration in FORM BFile: FORM B.pdf27 Sep 2022
CERSAI detailsFile: Cersai Declaration samruddhi.pdf27 Sep 2022
Proforma of Agreement for saleFile: Allotment Letter Format.pdf27 Sep 2022
Proforma of Allotment letterFile: Allotment Letter Format.pdf27 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation report Draft allotment.pdf27 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Draft sale agreement.pdf27 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE.pdf15 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf15 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf15 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Rera Bank Account Declaration.pdf15 Sep 2022
PAN CardFile: Pan Card (1).pdf14 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: REVISED CC.pdf14 Sep 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
STAR VIRATHAN CITYP99000078995Virathan Khurd, Palghar274Jan 2025OngoingDec 2031Not due yet
STAR SIGNATURE CITY - STAR OPALP99000076877PALGHAR WEST, Palghar35Jul 2024OngoingJun 2028Not due yet
STAR SIGNATURE CITY-STAR EMERALDP99000049637MAKANE, Palghar145Feb 2023OngoingDec 2026Not due yet
STAR SIGNATURE CITY - STAR PEARLP99000031156Saphale West, Palghar-Oct 2021CompletedDec 2026Apr 2025

How this compares with Palghar

98%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep STAR SAMRUDDHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHANDRAPADA3,200+ in Palghar

2 kmSTAR SAMRUDDHICompleted 43Lapsed / revoked 26Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 122 registered projects within 2 km.

Builder: STAR BUILDERS & DEVELOPERS

STAR BUILDERS & DEVELOPERS has 8 registrations on MahaRERA, including STAR SHERATON and STAR BUILDERS AND DEVELOPERS. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if STAR SAMRUDDHI is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of STAR SAMRUDDHI?

The registered promoter entity is STAR BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in STAR SAMRUDDHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for STAR SAMRUDDHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at STAR SAMRUDDHI?

The professionals named in the filing: Architect: KULDEEP PATIL ARCHITECT; Engineer: SS AASOCIATES; Chartered Accountant: PALLAVI P BARAPATRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STAR SAMRUDDHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STAR SAMRUDDHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STAR SAMRUDDHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.