Home / Browse projects / Pune, Maharashtra / SPARKLE AT GODREJ SERENE
SPARKLE AT GODREJ SERENE
By Godrej Skyline Developers Limited
RG-MH-67522 · RERA P52100048467 · Last updated on MahaRERA portal: 25 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 250.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SPARKLE AT GODREJ SERENE is a Residential / Group Housing project by Godrej Skyline Developers Limited in Pune, Maharashtra, registered with MahaRERA as P52100048467 on 3 Jan 2023. Possession is promised by 31 Dec 2027.
At a glance
Project
- NameSPARKLE AT GODREJ SERENE
- TypeResidential / Group Housing
- Location
- OFF PUNE MUMBAI EXPRESS HIGHWAY
- MAMURDI
- Haveli
- Pune
- 412101
- Pincode412101
- RERA no.P52100048467
- ReraGenie IDRG-MH-67522
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jan 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings3 building records
- Documents filed95 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER D | NA | 23 | 0 | 0 | 0 | 0 |
| TOWER E | NA | 21 | 0 | 0 | 0 | 0 |
| TOWER F | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.
TOWER D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER F0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| PARKINGS | Yes | 0% |
Parking filed489
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TOWER D | 172 | 172 |
| TOWER E | 145 | 145 |
| TOWER F | 172 | 172 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHITECTURE COLLECTIVE |
| Engineer | WTP COST ADVISORY SERVICES INDIA PRIVATE LIMITED |
| Engineer | Anil Powar |
| Chartered Accountant | R S MANIYAR & CO |
| Chartered Accountant | M D Deshpande & Co |
| Chartered Accountant | B S R & Co. LLP |
| Partner | Role in project |
|---|---|
| Godrej Skyline Developers Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Sparkle Architect certificate Q4FY26.pdf | 25 Apr 2026 |
| Form 2File: Eng_certificate_Sparkle Q4FY26.pdf | 25 Apr 2026 |
| Form 3File: CA Certificate Sparkle-March_26_Signed.pdf | 25 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sparkle Inventory Declaration Q4FY26 Signed.pdf | 25 Apr 2026 |
| Form 1File: Architect Certificate Sparkle Q3FY26.pdf | 25 Jan 2026 |
| Form 2File: Engineers Certificate Sparkle Q3FY26.pdf | 25 Jan 2026 |
| Form 3File: RERA Certificate Sparkle December 25 Signed.pdf | 25 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sparkle Inventory Declaration (1).pdf | 25 Jan 2026 |
| Form 1File: Sparkle RERA Architects Certificate Q2FY26.pdf | 20 Oct 2025 |
| Form 2File: Engineers Certificate Sparkle.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sparkle Inventory Declaration.pdf | 20 Oct 2025 |
| Form 3File: CA Cert Godrej Serene Sparkle September25.pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: Sparkle Form 5 Anne 1_compressed.pdf | 29 Aug 2025 |
| Form 1File: Sparkle at Serene Architect Certificate.pdf | 20 Jul 2025 |
| Form 2File: Annexure B Sparkle.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sparkle Inventory Declaration.pdf | 20 Jul 2025 |
| Form 3File: CA Certificate Sparkle at Godrej Serene June25 Signed.pdf | 20 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sparkle_compressed.pdf | 1 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S2-Phase2 Architects Certificate.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Sparkle CA Cert.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B Sparkle.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sparkle Inventory Declaration.pdf | 20 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Godrej Sparkle.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S2-Phase2 RERA Architects Certificate.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sparkle.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Sparkle.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 6 Disclosure of sold_ booked inventory (1).pdf | 20 Jan 2025 |
| CERSAI detailsFile: CERSAI Latest.pdf | 21 Oct 2024 |
| CERSAI detailsFile: CERSAI.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sparkle Form 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sparkle (002).pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Sparkle.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sparkle.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sparkle.pdf | 15 Oct 2024 |
| CERSAI detailsFile: CERSAI.pdf | 15 Oct 2024 |
| PAN CardFile: Pan Card New.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Sparkle Form 5_compressed.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Carnival.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sparkle.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sparkle.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sparkle.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_GODREJ SERENE SPARKLE_JUNE 24_Signed_compressed.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Sparkle Serene as on 31st March 2024 (Signed).pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Sparkle at Godrej Serene March,2024.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sparkle at Godrej Serene March,2024.pdf | 15 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certificate Sparkle at Godrej Serene March,2024.pdf | 15 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Spakle Serene - Architect's Certificate.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sparkle Serene - Enggineer's Certificate.pdf | 12 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200293339474_For_Debtor_Based_Search_12_01_2024_11_56_49_022.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Sparkle__Dec23.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Sparkle Serene_Signed.pdf | 12 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration_Sparkle at Godrej Serene.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumrance _Sparkle at Godrej Serene.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Declaration_Sparkle at Godrej Serene.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumrance _Sparkle at Godrej Serene.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold_ booked inventory.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sparkle - Architect Certificate.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sparkle Serene Engg Certificate.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Sparkle Serene-Signed.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Skyline - Sparkle at Godrej Serene.pdf | 21 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate S2-Sparkle_3_11zon.pdf | 20 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHARERA Engineers Certificate - Form 2 - Sparkle at Serene - 20230630_1_11zon.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Sparkle Serene-Signed.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Sparkle at Godrej Serene.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_Godrej Sparkle Serene-Signed.PDF | 19 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sparkle at Godrej Serene Architech Cer.pdf | 16 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sparkle at Godrej Serene Engineer Cer.pdf | 16 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assuarance Certificate Carnival.pdf | 16 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sparkle at Godrej Serene Quality Assurance.pdf | 16 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Sparkle at Serene_22_1_11zon.pdf | 28 Dec 2022 |
| Copy of the legal title reportFile: 1 Copy of the legal title report (25).pdf | 23 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Legal.pdf | 23 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Legal.pdf | 23 Dec 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_17-12-2022 (002).pdf | 23 Dec 2022 |
| Other - LegalFile: S2B RESIDENTIAL AFS DRAFT_23122022_Proforma.pdf | 23 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: Finance.pdf | 30 Nov 2022 |
| Details of encumbrances concerned to LegalFile: Finance.pdf | 30 Nov 2022 |
| Declaration about Commencement CertificateFile: Godrej Skyline Developers (1).pdf | 30 Nov 2022 |
| Declaration in FORM BFile: FORM B.pdf | 30 Nov 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GODREJ PARK GREENS | PUNE | 1,190 | Completed | Mar 2023 | Late, Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SPARKLE AT GODREJ SERENE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAMURDI13,700+ in Pune
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: Godrej Skyline Developers Limited
Godrej Skyline Developers Limited has 8 registrations on MahaRERA, including Godrej Park Greens and Godrej Nurture. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SPARKLE AT GODREJ SERENE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SPARKLE AT GODREJ SERENE?
The registered promoter entity is Godrej Skyline Developers Limited, a company as per the filing. Its CIN U45309MH2016PTC287858 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SPARKLE AT GODREJ SERENE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SPARKLE AT GODREJ SERENE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SPARKLE AT GODREJ SERENE?
The professionals named in the filing: Architect: ARCHITECTURE COLLECTIVE; Engineer: WTP COST ADVISORY SERVICES INDIA PRIVATE LIMITED; Engineer: Anil Powar; Chartered Accountant: R S MANIYAR & CO; Chartered Accountant: M D Deshpande & Co; Chartered Accountant: B S R & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SPARKLE AT GODREJ SERENE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback