ReraGenieLog inGet a buyer report

Home / Browse projects / Signature (The Business Hub)

Registered Litigation declared Commercial project

Signature (The Business Hub)

By Prabhat Sadan Properties Private Limited

RG-MH-05277 · RERA P51900053489 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Stilt Floor, 0%
13 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Signature (The Business Hub) is a Commercial project by Prabhat Sadan Properties Private Limited in Agripada West, Byculla, 400011, registered with MahaRERA as P51900053489 on 6 Nov 2023. Possession is promised by 31 Dec 2026. 0 of the 13 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSignature (The Business Hub)
  • TypeCommercial
  • Location
    • Dr. Anandrao L Nair Road and Gell Street
    • Agripada West
    • Byculla
    • 400011
  • Pincode400011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900053489
  • ReraGenie IDRG-MH-05277

Builder

  • NamePrabhat Sadan Properties Private Limited
  • Entity typeCompany
  • CINU70100MH1988PTC046902
  • GSTIN27AADCP9334L1ZY
  • DirectorEsoof Shoeb Contractor
  • DirectorTABREZ SHAFI AHMED SHAIKH

Key dates

this monthRegisteredNov 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Nov 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Current status

0%0 of 13 units booked
34.6%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sale Wing-ANA311301313

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

Sale Wing-A: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed178

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots178
Closed/Covered96
Open Space82

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,737 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6310.31
Proposed, not sanctioned6,310 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhatija Mansion, 82 Cyrus Avenue, Dr Anandrao Nair Road, Opp Nair Hospital, Mumbai Central
Estimated costRs 76.33 cr
Cost incurredRs 26.44 cr
Work done34.64%
BuildingWingEstimatedIncurred
Sale Wing-ANARs 70.33 crRs 26.44 cr
-NARs 6.00 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShaikh and Associates
EngineerJ W Consultants LLP
EngineerIdris Dohadwala
EngineerDipesh Joshi
EngineerFakhri A Hashamwala & Associates
Chartered AccountantMohan L Gupta and Associates
Chartered AccountantBSN & ASSOCIATES
PartnerRole in project
Prabhat Sadan Properties Private Limited-

Litigation declared3

CaseCourtStatus
87/2022Waqf TribunalPending
122/2022Waqf TribunalPending
913/2021City Civil CourtPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCH_PRABH_JAN-MAR24.pdf24 Jun 2026
Withdrawal Update Form 2File: Eng Cert_prabhat-dec23.pdf24 Jun 2026
Withdrawal Update Form 3File: CA FORM 3_Q4_sign.pdf24 Jun 2026
Form 5 (FY 2023-2024)File: Form5 prabh 23-24.pdf2 Jun 2026
Form 1File: ARCH CERT DEC25 SIGN.pdf4 Mar 2026
Form 2File: ENG CERT DEC25 SIGN.pdf4 Mar 2026
Form 3File: FORM 3_DEC2025.pdf4 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disc sold 31122025.pdf4 Mar 2026
Form 1File: Arch cert sep 25 sign.pdf18 Nov 2025
Form 2File: Eng Cert sep25_sign.pdf18 Nov 2025
Form 3File: CA CERT SIGN JUNE25.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disc Sold book_sign sep25.pdf18 Nov 2025
Form 1File: ARCH CERT_SIGN_DEC24.pdf18 Nov 2025
Form 2File: ENG CERT SIGN_DEC24.pdf18 Nov 2025
Form 3File: CA CERT SIGN2025_compressed.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disc Sold book_sign dec24.pdf18 Nov 2025
Form 1File: Arch Cert prabhjune 25.pdf22 Jul 2025
Form 2File: Engcertjune25sign.pdf22 Jul 2025
Form 3File: CA CERT SIGN JUNE25.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disc Sold book_sign (1).pdf22 Jul 2025
Self-declaration of Quarterly ProgressFile: Document_250715_120911.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disc Sold book_sign.pdf26 Jun 2025
Form 1File: ARCH CERT SIGN MAR25.pdf26 Jun 2025
Form 2File: ENG CERT SIGN MAR25.pdf26 Jun 2025
Form 3File: CA CERT SIGN MAR25.pdf26 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT SIGN MAR25_compressed.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT SIGN MAR25.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT SIGN MAR25.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Disc Sold book_sign.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PRABHAT SIGN.pdf21 Mar 2025
Building plan approvalFile: Segment 001 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building plan approvalFile: Segment 002 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building plan approvalFile: Segment 003 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building plan approvalFile: Segment 004 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building plan approvalFile: Segment 005 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building plan approvalFile: Segment 006 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building plan approvalFile: Segment 007 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT_SIGN_DEC24.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT SIGN_DEC24.pdf15 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Segment 007 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Segment 006 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Segment 005 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Segment 004 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Segment 003 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Segment 002 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Segment 001 of PRABHAT APPROVED PLANS 2024.pdf15 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ANNUAL REPORT_SIGN_23-24.pdf8 Jan 2025
Building plan approvalFile: 2450129Amendletter_signed.pdf2 Jan 2025
Building plan approvalFile: PRABHAT PLAN SHEET 1.pdf2 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2450129Amendletter_signed.pdf2 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: PRABHAT PLAN SHEET 1.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT SIGN SEP 24_compressed.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT SIGN SEP 24_compressed.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT SIGN SEP24.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PRABHAT ENGINEERS CERTIFICATE (31-03-24).pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PRABHAT ENGINEERS CERTIFICATE (30-06-24).pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PRABHAT ENGINEERS CERTIFICATE (30-09-24).pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_JULY24.pdf6 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalid CC_ upto july 2025.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA PRABH_MAR-24_compressed.pdf19 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA PRAB JUNE-24_compressed.pdf19 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Prabhat_23-24.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_PRABH_JAN-MAR24.pdf8 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_prabhat-dec23.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Signature as on Dec 2023.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT_Sign.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Prabhat Form 3_Sep 2023_.pdf7 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Signature Final_11zon.pdf6 Sep 2023
Other - LegalFile: AFS Signature Final.pdf6 Sep 2023
Other - LegalFile: Deviation Signature Final_11zon.pdf6 Sep 2023
Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance (1).pdf21 Jul 2023
Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance (1).pdf21 Jul 2023
Building plan approvalFile: plan signature_6-7 (1)_11zon.pdf20 Jul 2023
Building plan approvalFile: plan signature_8-8.pdf20 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: plan signature_6-7 (1)_11zon.pdf20 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: plan signature_8-8.pdf20 Jul 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf14 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter-Legal.pdf14 Apr 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf14 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter-Legal.pdf14 Apr 2023

Keep Signature (The Business Hub) on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Agripada West, Byculla

2 kmSignature (The Business Completed 9Lapsed / revoked 16Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: Prabhat Sadan Properties Private Limited

Prabhat Sadan Properties Private Limited has 1 registration on MahaRERA, including Signature (The Business Hub). Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if Signature (The Business Hub) is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Signature (The Business Hub)?

The registered promoter entity is Prabhat Sadan Properties Private Limited, a company as per the filing. Its CIN U70100MH1988PTC046902 and GSTIN 27AADCP9334L1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Signature (The Business Hub)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Signature (The Business Hub)?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Signature (The Business Hub)?

The professionals named in the filing: Architect: Shaikh and Associates; Engineer: J W Consultants LLP; Engineer: Idris Dohadwala; Engineer: Dipesh Joshi; Engineer: Fakhri A Hashamwala & Associates; Chartered Accountant: Mohan L Gupta and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Signature (The Business Hub)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Signature (The Business Hub). Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Signature (The Business Hub) to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.