Home / Browse projects / Pune, Maharashtra / SIGNATURE PARK K L N BUILDINGS

Registered Litigation declared Residential / Group Housing project

SIGNATURE PARK K L N BUILDINGS

By SHREE SONIGARA REALCON

RG-MH-88391 · RERA PR1260002502756 · Last updated on MahaRERA portal: 19 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • Allotment letter deviates from the model form

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
5 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 85%
408 of 408Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 12 documents Report an error

SIGNATURE PARK K L N BUILDINGS is a Residential / Group Housing project by SHREE SONIGARA REALCON in Pune, Maharashtra, registered with MahaRERA as PR1260002502756 on 12 Mar 2026. Possession is promised by 31 Dec 2029. 0 of the 408 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.

At a glance

Project

  • NameSIGNATURE PARK K L N BUILDINGS
  • TypeResidential / Group Housing
  • Location
    • Aundh-Ravet BRT Road
    • Dange Chowk
    • Thergaon
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002502756
  • ReraGenie IDRG-MH-88391

Builder

  • NameSHREE SONIGARA REALCON
  • Entity typePartnership
  • GSTIN27ADBFS4676G1ZT
  • PartnersBAHVESH BHAGCHAND SONIGARA, KETUL BHAGCHAND SONIGARA, RAHUL BHAGCHAND SONIGARA, JITENDRA PANRAJ SONIGARA, MITESH MAFATLAL DOSHI
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2026PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Mar 2026
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed12 files

Current status

0%0 of 408 units booked
3.9%Work done, per cost certificate

Figures as on 19 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
K BuildingNA22191300130
L BuildingNA22191490149
N BuildingNA25221290129

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 85%.

K Building6%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
L Building9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
N Building52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed260

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots260
Closed/Covered260
BuildingClosed/CoveredTotal
K Building9393
L Building9292
N Building7575

Land and ownership22

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area32,841 sq m
Land owned byNot the promoter
Named landowners22
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Feb 2026
LandownerVillageDistrict
Sudam Nana Gujar-Pune
Sumit Sudam Gujar-Pune
Savita Jalindar Sakhare-Pune
Vaishali Ramesh Gujar-Pune
Vimal Hiraman Gujar-Pune
Anita Sudam Gujar-Pune
Sagar Sudam Gujar-Pune
Spana Sagar Gujar-Pune
SWATI SUDHIR KALBHOR-Pune
Manisha Sumit Gujar-Pune
Eknath Nana Gujar-Pune
Anjali Eknath Gujar-Pune
Nikhil Eknath Gujar-Pune
Priyanka Nikhil Gujar-Pune
Pooja Mangesh Chaundhe-Pune
Vishwanath Nana Gujar-Pune
Joyti Vishwanath Gujar-Pune
Dhanshri Ajay Balvadkar-Pune
Nita Jaysingh Nakhate-Pune
Siddhesh Ramesh Gujar-Pune
Rohan Vishwanath Gujar-Pune
Baburao Shankar Pansare-Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI31317.01
Proposed, not sanctioned31,317 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchROHIT BUILDING, OFF J.M.ROAD,DECCAN GYMKHANA,PUNE 411 004
Estimated costRs 27.97 cr
Cost incurredRs 1.08 cr
Work done3.85%
BuildingWingEstimatedIncurred
L BuildingNARs 11.61 crRs 44.70 lakh
K BuildingNARs 10.24 crRs 39.44 lakh
N BuildingNARs 3.32 crRs 12.80 lakh
-NARs 2.80 crRs 10.77 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN SUTAR UNUSUAL SPACES SUTAR
EngineerAXIS CONSULTANT CONSULTANT
Chartered AccountantNAVDEEP JINDAL
PartnerRole in project
SHREE SONIGARA REALCON-

Litigation declared5

CaseCourtStatus
1700/2018/2018Civil Judge Senior DivisionOngoing
13/2017/2017Civil Judge Junior DivisionClosed
1/2019/2019Civil Court Junior DivisionClosed
283/2021/2021Sub Division OfficeClosed
RTS\A\248\2022/2022Sub Division OfficeClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed12

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 1 Layout.pdf19 May 2026
Layout approvalFile: 1 Layout.pdf7 May 2026
Building plan approvalFile: 2.pdf7 May 2026
Building plan approvalFile: 3.pdf7 May 2026
Withdrawal Update Form 1File: Form 1_KLN Building Sign.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 KLN.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3 KLN signed.pdf30 Apr 2026
Declaration and undertaking (Annexure A)File: 33 ANNEXURE - A declaration for one plot one project (2).pdf7 Feb 2026
Layout approvalFile: LAYOUT.pdf7 Feb 2026
Building plan approvalFile: K BUILDING.pdf29 Dec 2025
Building plan approvalFile: L BUILDING.pdf29 Dec 2025
Building plan approvalFile: N BUILDING.pdf29 Dec 2025

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SIGNATURE RITZP52100052042THERGAON, Pune288Jul 2023OngoingDec 2028Not due yet
SIGNATURE PARK E F I AND J BUILDINGSP52100027402DANGE CHOWK THERGAON, Pune360Dec 2020CompletedJun 2026Aug 2024
SIGNATURE PARK BUILDING M MHADAP52100032493THERGAON, Pune107Jan 2022OngoingDec 2025Not delivered
SIGNATURE PARK G AND H BUILDINGP52100019960THERGAON, Pune-Mar 2019CompletedApr 2024Mar 2022
SIGNATURE PARK C AND D BUILDINGP52100020943THERGAON, Pune-May 2019CompletedApr 2024Jun 2022

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIGNATURE PARK K L N BUILDINGS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dange Chowk13,700+ in Pune

2 kmSIGNATURE PARK K L N BUICompleted 105Lapsed / revoked 45Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 204 registered projects within 2 km.

Builder: SHREE SONIGARA REALCON

SHREE SONIGARA REALCON has 6 registrations on MahaRERA, including SIGNATURE PARK G AND H BUILDING and SIGNATURE PARK C AND D BUILDING. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SIGNATURE PARK K L N BUILDINGS is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIGNATURE PARK K L N BUILDINGS?

The registered promoter entity is SHREE SONIGARA REALCON, a partnership as per the filing. Its GSTIN 27ADBFS4676G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIGNATURE PARK K L N BUILDINGS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIGNATURE PARK K L N BUILDINGS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIGNATURE PARK K L N BUILDINGS?

The professionals named in the filing: Architect: SACHIN SUTAR UNUSUAL SPACES SUTAR; Engineer: AXIS CONSULTANT CONSULTANT; Chartered Accountant: NAVDEEP JINDAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIGNATURE PARK K L N BUILDINGS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIGNATURE PARK K L N BUILDINGS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIGNATURE PARK K L N BUILDINGS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.