Home / Browse projects / Pune, Maharashtra / SIGNATURE PARK G AND H BUILDING

Completed No litigation declared Others project

SIGNATURE PARK G AND H BUILDING

By SHREE SONIGARA REALCON

RG-MH-04687 · RERA P52100019960 · Last updated on MahaRERA portal: 12 Apr 2022

Source: official MahaRERA filing

Red flags

  • 89 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
2 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
89Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

SIGNATURE PARK G AND H BUILDING is a Others project by SHREE SONIGARA REALCON in Pune, Maharashtra, registered with MahaRERA as P52100019960 on 15 Mar 2019. The registration is recorded completed; possession was promised by 1 Apr 2024. 89 complaints are on record with the regulator.

At a glance

Project

  • NameSIGNATURE PARK G AND H BUILDING
  • TypeOthers
  • Location
    • DANGE CHOWK
    • THERGAON
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019960
  • ReraGenie IDRG-MH-04687

Builder

  • NameSHREE SONIGARA REALCON
  • Entity typePartnership
  • GSTIN27ADBFS4676G1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBAHVESH BHAGCHAND SONIGARA, KETUL BHAGCHAND SONIGARA, RAHUL BHAGCHAND SONIGARA, JITENDRA PANRAJ SONIGARA, MITESH MAFATLAL DOSHI
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2019PromisedApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Mar 2019
  • Promised completion1 Apr 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
G BUILDINGNA170000
H BUILDINGNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

G BUILDING45%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)55%
Plinth60%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H BUILDING45%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)55%
Plinth60%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed134

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots134
Closed/Covered134
BuildingClosed/CoveredTotal
G BUILDING6666
H BUILDING6868

Land and ownership18

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,632 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
LandownerVillageDistrict
GOPALRAO SHANKARRAO ZENDEDEHUPune
RAJESHWAR GOPAL ZENDEThergaonPune
SHANKAR NIWRUTTI KUMBHARThergaonPune
LALASAHEB NATHU GUJARThergaonPune
SHARAD BALASAHEB GUJARThergaonPune
PRAKASH NATHU GUJARThergaonPune
SURESH NIVRUTTI KUMBHARThergaonPune
DATTATRAY NIVRUTTI KUMBHARThergaonPune
TARAMATI SHIVAJI KAMTHEPimpri Chinchawad (M Corp.)Pune
ANKUSH PANDURANG TODKARThergaonPune
LAHU PANDURANG TODKARThergaonPune
NANDKUMAR SHANKARRAO KOKATEThergaonPune
PANDHARINATH SAWALARAM GODAMBEThergaonPune
PRALHAD SHANKAR GUJARThergaonPune
PANDURANG RAJARAM TODKARThergaonPune
EKNATH NANA GUJARThergaonPune
SUDAM NANA GUJARThergaonPune
VISHWANATH NANA GUJARThergaonPune

Approvals and building plan

Permissible FSI102588.68
Proposed, not sanctioned22,589 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSIB BRANCH SHIVAJINAGAR PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN SUTAR ( FIRM - UNUSUAL SPACES)
EngineerJ+W CONSULTANTS PVT LTD
PartnerRole in project
SHREE SONIGARA REALCON-

Litigation declared1

CaseCourtStatus
1700/2018CIVIL COURT SHIVAJINAGARPENDING

Complaints filed with MahaRERA89

Case no.ComplainantRespondentFiled
CC005000000310562Nikhilesh JhadeShree Sonigara Realcon05/03/2024
CC12601891Nikhilesh JhadeSHREE SONIGARA REALCON31/03/2026
CC12601542Annappa Balasaheb RevatgaonSHREE SONIGARA REALCON20/03/2026
CC12601544Nilesh Mahadev KumbharSHREE SONIGARA REALCON20/03/2026
CC12601543Jayawant Ramesh MahajanSHREE SONIGARA REALCON20/03/2026
CC12601545Dhaivat Jivrajbhai ShahSHREE SONIGARA REALCON20/03/2026
CC12601546Aniket Dasharat ToraseSHREE SONIGARA REALCON21/03/2026
CC12601547Monali shantaram SagarSHREE SONIGARA REALCON21/03/2026
CC12601548Lahu Uttam KhatalSHREE SONIGARA REALCON21/03/2026
CC12601549Dinesh jijabhau DasalkarSHREE SONIGARA REALCON21/03/2026
CC12601550Ghanshyam Gopal ThoratSHREE SONIGARA REALCON21/03/2026
CC12601551Swapnil Hiraman MahatmaSHREE SONIGARA REALCON21/03/2026
CC12601552Ravindra Madhukar KaranjekarSHREE SONIGARA REALCON21/03/2026
CC12601553Swanand Ashok JagtapSHREE SONIGARA REALCON21/03/2026
CC12601555Vinay Chandrakant LoharSHREE SONIGARA REALCON21/03/2026
CC12601556Ulhas Narayanrao KhadatkarSHREE SONIGARA REALCON21/03/2026
CC12601634Vilas NevaseSHREE SONIGARA REALCON23/03/2026
CC12601860Pragati ShirsekarSHREE SONIGARA REALCON29/03/2026
CC12601642Mayur KulkarniSHREE SONIGARA REALCON23/03/2026
CC12601643Preeti bagmarSHREE SONIGARA REALCON23/03/2026
CC12601647Himanshu kulkarniSHREE SONIGARA REALCON23/03/2026
CC12601652Suraj ChouguleSHREE SONIGARA REALCON24/03/2026
CC12601662Venkata Subrahmanya PalaparthiSHREE SONIGARA REALCON24/03/2026
CC12601661Prakash SawantSHREE SONIGARA REALCON24/03/2026
CC12601663Dadaso Kharade KharadeSHREE SONIGARA REALCON24/03/2026
CC12601664Prafulla SatikosreSHREE SONIGARA REALCON24/03/2026
CC12601668Atul ChananSHREE SONIGARA REALCON24/03/2026
CC12601669Sudarshan GangurdeSHREE SONIGARA REALCON24/03/2026
CC12601671Vaibhav Manik DeoreSHREE SONIGARA REALCON24/03/2026
CC12601672Suresh KambleSHREE SONIGARA REALCON24/03/2026
CC12601674Amit RajputSHREE SONIGARA REALCON24/03/2026
CC12601675Abhijeet NigadikarSHREE SONIGARA REALCON24/03/2026
CC12601678Tushar Narayan BhuteSHREE SONIGARA REALCON24/03/2026
CC12601694Kaustubh Laxmikant DangeSHREE SONIGARA REALCON25/03/2026
CC12601696Madhuri Sachin SalunkheSHREE SONIGARA REALCON25/03/2026
CC12601699Akshay Aravind BansodSHREE SONIGARA REALCON25/03/2026
CC12601710Sameer Virendra WanSHREE SONIGARA REALCON25/03/2026
CC12601712Vashishtha Laxman PawarSHREE SONIGARA REALCON25/03/2026
CC12601709Rahul Mishra MishraSHREE SONIGARA REALCON25/03/2026
CC12601714Shreeprasad Ratilal LoharSHREE SONIGARA REALCON25/03/2026
CC12601716Shekhar pradip RajepandhareSHREE SONIGARA REALCON25/03/2026
CC12601884Rahul GandhiSHREE SONIGARA REALCON31/03/2026
CC12601758Amol GarveSHREE SONIGARA REALCON27/03/2026
CC12601760Rajas KhedkarSHREE SONIGARA REALCON27/03/2026
CC12601761Lokesh BadgujarSHREE SONIGARA REALCON27/03/2026
CC12601770Rohit AgrawalSHREE SONIGARA REALCON27/03/2026
CC12601818Hemant BhavsarSHREE SONIGARA REALCON28/03/2026
CC12601759Abhinandan AlandkarSHREE SONIGARA REALCON27/03/2026
CC12601757Suraj Ramesh UgeSHREE SONIGARA REALCON27/03/2026
CC12601762Deepali Saiprasad ThakurSHREE SONIGARA REALCON27/03/2026
CC12601773Rahul Anil DhandeSHREE SONIGARA REALCON27/03/2026
CC12601776Pranav Hanumanth NaiknavareSHREE SONIGARA REALCON27/03/2026
CC12601781Narendra Namdevrao AloneSHREE SONIGARA REALCON27/03/2026
CC12601787Milind Ananda KaklijSHREE SONIGARA REALCON27/03/2026
CC12601801Harsha DeshmukhSHREE SONIGARA REALCON28/03/2026
CC12601812Arvind YadavSHREE SONIGARA REALCON28/03/2026
CC12601803Amit Gopal Kulkarni Gopal KulkarniSHREE SONIGARA REALCON28/03/2026
CC12601813Nikhil WatekarSHREE SONIGARA REALCON28/03/2026
CC12601804Suresh KarwandeSHREE SONIGARA REALCON28/03/2026
CC12601805Sachin Dilip DarekarSHREE SONIGARA REALCON28/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2022

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate GH.pdf12 Apr 2022
Architect’s Certificate on Completion of Project (Form 4)File: Arch Cert Form 4.pdf12 Apr 2022
Building plan approvalFile: G 1.pdf27 Jan 2022
Building plan approvalFile: G 2.pdf27 Jan 2022
Building plan approvalFile: G 3.pdf27 Jan 2022
Building plan approvalFile: G 4.pdf27 Jan 2022
Building plan approvalFile: H 1.pdf27 Jan 2022
Building plan approvalFile: H 2.pdf27 Jan 2022
Building plan approvalFile: H 3.pdf27 Jan 2022
Building plan approvalFile: H 4.pdf27 Jan 2022
Building Plan Approval (IOD)File: G 1.pdf27 Jan 2022
Building Plan Approval (IOD)File: G 2.pdf27 Jan 2022
Building Plan Approval (IOD)File: G 3.pdf27 Jan 2022
Building Plan Approval (IOD)File: G 4.pdf27 Jan 2022
Building Plan Approval (IOD)File: H 1.pdf27 Jan 2022
Building Plan Approval (IOD)File: H 2.pdf27 Jan 2022
Building Plan Approval (IOD)File: H 3.pdf27 Jan 2022
Building Plan Approval (IOD)File: H 4.pdf27 Jan 2022
Certificates of CA (Form 3)File: CA Certificate G H Q3.pdf29 Jun 2021
Certificates of CA (Form 3)File: CA Certificate Q4 G H.pdf29 Jun 2021
Certificates of CA (Form 3)File: CA Certificate G H WING.pdf13 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert G H Q1.pdf30 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert G H.pdf30 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A G H.pdf30 Sep 2020
Certificates of CA (Form 3)File: CA Certificate Q1 G H.pdf30 Sep 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 G H.pdf18 Aug 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate.pdf7 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Quality Assurance Form 2A.pdf7 Aug 2020
Certificates of CA (Form 3)File: CA Certificate Q4.pdf7 Aug 2020
Proforma of Allotment letterFile: DRAFT AGREEMENT G AND H BUILDING.pdf18 Jun 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert.pdf11 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer cert.pdf11 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Quality Certificate.pdf11 Feb 2020
Certificates of CA (Form 3)File: CA Certificate Q3.pdf11 Feb 2020
Details of encumbrancesFile: INDEX II OF MORTGAGE DEED - SBI - SIGNATURE PARK.pdf6 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 Aug 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf13 Aug 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Quality Assurance Certificate_reduce.pdf13 Aug 2019
Certificates of CA (Form 3)File: CA Certificate Q1_reduce.pdf13 Aug 2019
Layout approvalFile: SANCTION PLAN.pdf11 Mar 2019
Building plan approvalFile: IOD Layout.pdf11 Mar 2019
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf11 Mar 2019
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf11 Mar 2019
Copy of Layout Approval (in case of layout)File: SANCTION PLAN.pdf11 Mar 2019
Building Plan Approval (IOD)File: IOD Layout.pdf11 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf11 Mar 2019
Declaration in FORM BFile: FORM B - PROMOTER.pdf11 Mar 2019
Certificates of CA (Form 3)File: CA Certificate.pdf11 Mar 2019
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf11 Mar 2019

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SIGNATURE RITZP52100052042THERGAON, Pune288Jul 2023OngoingDec 2028Not due yet
SIGNATURE PARK E F I AND J BUILDINGSP52100027402DANGE CHOWK THERGAON, Pune360Dec 2020CompletedJun 2026Aug 2024
SIGNATURE PARK BUILDING M MHADAP52100032493THERGAON, Pune107Jan 2022OngoingDec 2025Not delivered
SIGNATURE PARK C AND D BUILDINGP52100020943THERGAON, Pune-May 2019CompletedApr 2024Jun 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIGNATURE PARK G AND H BUILDING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THERGAON13,700+ in Pune

2 kmSIGNATURE PARK G AND H BCompleted 12Lapsed / revoked 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: SHREE SONIGARA REALCON

SHREE SONIGARA REALCON has 6 registrations on MahaRERA, including SIGNATURE PARK G AND H BUILDING and SIGNATURE PARK C AND D BUILDING. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SIGNATURE PARK G AND H BUILDING is delayed beyond 1 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIGNATURE PARK G AND H BUILDING?

The registered promoter entity is SHREE SONIGARA REALCON, a partnership as per the filing. Its GSTIN 27ADBFS4676G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIGNATURE PARK G AND H BUILDING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SIGNATURE PARK G AND H BUILDING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SIGNATURE PARK G AND H BUILDING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIGNATURE PARK G AND H BUILDING?

The professionals named in the filing: Architect: SACHIN SUTAR ( FIRM - UNUSUAL SPACES); Engineer: J+W CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIGNATURE PARK G AND H BUILDING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIGNATURE PARK G AND H BUILDING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIGNATURE PARK G AND H BUILDING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.