Home / Browse projects / Pune, Maharashtra / SIGNATURE PARK BUILDING M MHADA

Registration lapsed Litigation declared Residential / Group Housing project

SIGNATURE PARK BUILDING M MHADA

By SHREE SONIGARA REALCON

RG-MH-22808 · RERA P52100032493 · Last updated on MahaRERA portal: 17 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 completed earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
39 of 107Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

SIGNATURE PARK BUILDING M MHADA is a Residential / Group Housing project by SHREE SONIGARA REALCON in Pune, Maharashtra, registered with MahaRERA as P52100032493 on 10 Jan 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 68 of the 107 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIGNATURE PARK BUILDING M MHADA
  • TypeResidential / Group Housing
  • Location
    • DANGE CHOWK
    • THERGAON
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032493
  • ReraGenie IDRG-MH-22808

Builder

  • NameSHREE SONIGARA REALCON
  • Entity typePartnership
  • GSTIN27ADBFS4676G1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBAHVESH BHAGCHAND SONIGARA, KETUL BHAGCHAND SONIGARA, RAHUL BHAGCHAND SONIGARA, JITENDRA PANRAJ SONIGARA, MITESH MAFATLAL DOSHI
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

10 months past promisethis monthRegisteredJan 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Jan 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed141 files

Current status

64%68 of 107 units booked
58.0%Work done, per cost certificate

Figures as on 17 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
M BUILDINGNA25221070107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

M BUILDING: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 17 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed125

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots125
Closed/Covered125

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area31,786 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI7377.6
Proposed, not sanctioned7,378 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHINCHWAD PUNE
Estimated costRs 24.84 cr
Cost incurredRs 14.41 cr
Work done58.01%
BuildingWingEstimatedIncurred
M BUILDINGNARs 21.11 crRs 10.81 cr
-NARs 3.73 crRs 3.60 cr

Certifying professionals and partners11

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN SUTAR (UNUSUAL SPACES) Sutar
EngineerJW CONSULTANTS
EngineerGirish Mahajan
EngineerYogesh Shivaji Ghuge
EngineerAmol Naik
Chartered AccountantCA DILIP JAIN & ASSOCIATES
Chartered AccountantV S A P & COMPANY
Chartered AccountantSnehal Patil
Chartered AccountantNAVDEEP JINDAL
Chartered AccountantRAJESH GOPAL MUNDADA
Chartered AccountantDolly Gandhi
PartnerRole in project
SHREE SONIGARA REALCON-

Litigation declared1

CaseCourtStatus
1700/2018CIVIL COURT SHIVAJINAGARPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mhada_Q3.pdf17 Jan 2026
Withdrawal Update Form 2File: Mhada Form 2_Q3 Sign.pdf17 Jan 2026
Withdrawal Update Form 3File: Mhada Form 3_Q3 Sign.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: Form-5 24-25.pdf26 Nov 2025
Form 2A (FY 2022-2023)File: Form 2A.pdf21 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A Mhada-F.Y 23-24.pdf20 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A Mhada-F.Y 24-25.pdf20 Nov 2025
Form 5 (FY 2022-2023)File: Form 5.pdf4 Nov 2025
Form 5 (FY 2023-2024)File: form 5.pdf4 Nov 2025
Layout approvalFile: LAYOUT.pdf1 Nov 2025
Building plan approvalFile: M BUILDING.pdf1 Nov 2025
Withdrawal Update Form 1File: Form 1_M Mhada_Q2-Sing.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2-M MHADA-Q2.pdf16 Oct 2025
Withdrawal Update Form 3File: FORM 3_M MHADA-Q2.pdf16 Oct 2025
Withdrawal Update Form 1File: Form 1_Q1_Mhada PORTAL.pdf5 Sep 2025
Withdrawal Update Form 1File: Form 1_Q1_Mhada PORTAL.pdf5 Sep 2025
Withdrawal Update Form 2File: Form 2_Q2_Mhada Final Sign Copy.pdf5 Sep 2025
Withdrawal Update Form 2File: Form 2_Q2_Mhada Final Sign Copy.pdf5 Sep 2025
Withdrawal Update Form 3File: CA CERTIFICATE FORM 3-FINAL Q1-2025-26.pdf5 Sep 2025
Withdrawal Update Form 3File: CA CERTIFICATE FORM 3-FINAL Q1-2025-26.pdf5 Sep 2025
Form 1File: Form 1 Mar 2022.pdf21 Aug 2025
Form 2File: Form 2 Mar 22.pdf21 Aug 2025
Form 3File: Form 3 Mar 2022.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Promoters disclosure_March 22 -Mhada.pdf21 Aug 2025
Form 1File: Form 1 Jun 2022.pdf21 Aug 2025
Form 2File: Form 2 Jun 22.pdf21 Aug 2025
Form 3File: Form 3 Jun 2022.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Promoter Disclosure_Q1_22-23.pdf21 Aug 2025
Form 1File: Form 1 Sep 2022.pdf21 Aug 2025
Form 2File: Form 2 Sep 22.pdf21 Aug 2025
Form 3File: Form 3 Sep 2022.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Promoter Disclosure_Q2_22-23.pdf21 Aug 2025
Form 1File: Form 1 Dec 2022.pdf21 Aug 2025
Form 2File: Form 2 Dec 2022.pdf21 Aug 2025
Form 3File: Form 3 FY 2022-23 Q3 Shree Sonigara Mhada.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Promoter Disclosure_Q3_22-23.pdf21 Aug 2025
Form 1File: Form 1 Mar 2023.pdf21 Aug 2025
Form 2File: Form 2 Mar 23.pdf21 Aug 2025
Form 3File: Form 3 FY 2022-23 Q4 Shree Sonigara Mhada.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Promoter Disclosure_Q4_22-23.pdf21 Aug 2025
Form 1File: Form 1 Jun 2023.pdf21 Aug 2025
Form 2File: Form 2 Jun 23.pdf21 Aug 2025
Form 3File: Form 3 Jun 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Promoters disclosure_ June 23_Mhada.pdf21 Aug 2025
Form 1File: Form 1 Mar 25.pdf6 Aug 2025
Form 2File: Form 2 Mar 25.pdf6 Aug 2025
Form 3File: Form 3 Mar 25.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Mar 25.pdf6 Aug 2025
Form 1File: Form 1 Dec 2024.pdf6 Aug 2025
Form 2File: Form 2 Dec 24.pdf6 Aug 2025
Form 3File: Form 3 Dec 2024.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 24.pdf6 Aug 2025
Form 1File: Form 1 Sep 2024.pdf6 Aug 2025
Form 2File: Form 2 Sep 24.pdf6 Aug 2025
Form 3File: Form 3 Sep 2024.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sep 24.pdf6 Aug 2025
Form 1File: Form 1 Jun 2024.pdf6 Aug 2025
Form 2File: Form 2 Jun 24.pdf6 Aug 2025
Form 3File: Form-3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Jun 24.pdf6 Aug 2025
Form 1File: Form 1 Mar 2024.pdf6 Aug 2025
Form 2File: Form 2 Mar 24.pdf6 Aug 2025
Form 3File: Form 3 Mar 2024.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Mar 24.pdf6 Aug 2025
Form 1File: Form 1 Dec 2023.pdf6 Aug 2025
Form 2File: Form 2 Dec 23.pdf6 Aug 2025
Form 3File: Form 3 Dec 2023.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 23.pdf6 Aug 2025
Form 1File: Form 1 Sep 23.pdf6 Aug 2025
Form 2File: Form 2 Sep-23.pdf6 Aug 2025
Form 3File: Form-3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sep 23.pdf6 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_M Mhada.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mhada Q4 2024-25 Form 3.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mhada_Q4.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Promoters disclosure_Q4-Mhada.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -MAHADA.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_M-MHADA_2023-24.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mhada_Q3.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Q3 FY 2024-25.pdf11 Feb 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SIGNATURE RITZP52100052042THERGAON, Pune288Jul 2023OngoingDec 2028Not due yet
SIGNATURE PARK E F I AND J BUILDINGSP52100027402DANGE CHOWK THERGAON, Pune360Dec 2020CompletedJun 2026Aug 2024
SIGNATURE PARK G AND H BUILDINGP52100019960THERGAON, Pune-Mar 2019CompletedApr 2024Mar 2022
SIGNATURE PARK C AND D BUILDINGP52100020943THERGAON, Pune-May 2019CompletedApr 2024Jun 2022

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIGNATURE PARK BUILDING M MHADA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THERGAON13,700+ in Pune

2 kmSIGNATURE PARK BUILDING Completed 97Lapsed / revoked 41Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 191 registered projects within 2 km.

Builder: SHREE SONIGARA REALCON

SHREE SONIGARA REALCON has 6 registrations on MahaRERA, including SIGNATURE PARK G AND H BUILDING and SIGNATURE PARK C AND D BUILDING. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SIGNATURE PARK BUILDING M MHADA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SIGNATURE PARK BUILDING M MHADA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIGNATURE PARK BUILDING M MHADA?

The registered promoter entity is SHREE SONIGARA REALCON, a partnership as per the filing. Its GSTIN 27ADBFS4676G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIGNATURE PARK BUILDING M MHADA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIGNATURE PARK BUILDING M MHADA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIGNATURE PARK BUILDING M MHADA?

The professionals named in the filing: Architect: SACHIN SUTAR (UNUSUAL SPACES) Sutar; Engineer: JW CONSULTANTS; Engineer: Girish Mahajan; Engineer: Yogesh Shivaji Ghuge; Engineer: Amol Naik; Chartered Accountant: CA DILIP JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIGNATURE PARK BUILDING M MHADA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIGNATURE PARK BUILDING M MHADA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIGNATURE PARK BUILDING M MHADA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.