Home / Browse projects / Pune, Maharashtra / SIGNATURE PARK BUILDING M MHADA
SIGNATURE PARK BUILDING M MHADA
RG-MH-22808 · RERA P52100032493 · Last updated on MahaRERA portal: 17 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 3 completed earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIGNATURE PARK BUILDING M MHADA is a Residential / Group Housing project by SHREE SONIGARA REALCON in Pune, Maharashtra, registered with MahaRERA as P52100032493 on 10 Jan 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 68 of the 107 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSIGNATURE PARK BUILDING M MHADA
- TypeResidential / Group Housing
- Location
- DANGE CHOWK
- THERGAON
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032493
- ReraGenie IDRG-MH-22808
Builder
- NameSHREE SONIGARA REALCON
- Entity typePartnership
- GSTIN27ADBFS4676G1ZT
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersBAHVESH BHAGCHAND SONIGARA, KETUL BHAGCHAND SONIGARA, RAHUL BHAGCHAND SONIGARA, JITENDRA PANRAJ SONIGARA, MITESH MAFATLAL DOSHI
- Other registrations5 more →
- Completed2 of 6
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Jan 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed141 files
Current status
Figures as on 17 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| M BUILDING | NA | 25 | 22 | 107 | 0 | 107 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
M BUILDING: 68% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 35% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 17 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed125
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| M BUILDING | NA | Rs 21.11 cr | Rs 10.81 cr |
| - | NA | Rs 3.73 cr | Rs 3.60 cr |
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SACHIN SUTAR (UNUSUAL SPACES) Sutar |
| Engineer | JW CONSULTANTS |
| Engineer | Girish Mahajan |
| Engineer | Yogesh Shivaji Ghuge |
| Engineer | Amol Naik |
| Chartered Accountant | CA DILIP JAIN & ASSOCIATES |
| Chartered Accountant | V S A P & COMPANY |
| Chartered Accountant | Snehal Patil |
| Chartered Accountant | NAVDEEP JINDAL |
| Chartered Accountant | RAJESH GOPAL MUNDADA |
| Chartered Accountant | Dolly Gandhi |
| Partner | Role in project |
|---|---|
| SHREE SONIGARA REALCON | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1700/2018 | CIVIL COURT SHIVAJINAGAR | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Nov 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed141
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Mhada_Q3.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Mhada Form 2_Q3 Sign.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Mhada Form 3_Q3 Sign.pdf | 17 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form-5 24-25.pdf | 26 Nov 2025 |
| Form 2A (FY 2022-2023)File: Form 2A.pdf | 21 Nov 2025 |
| Form 2A (FY 2023-2024)File: Form 2A Mhada-F.Y 23-24.pdf | 20 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Mhada-F.Y 24-25.pdf | 20 Nov 2025 |
| Form 5 (FY 2022-2023)File: Form 5.pdf | 4 Nov 2025 |
| Form 5 (FY 2023-2024)File: form 5.pdf | 4 Nov 2025 |
| Layout approvalFile: LAYOUT.pdf | 1 Nov 2025 |
| Building plan approvalFile: M BUILDING.pdf | 1 Nov 2025 |
| Withdrawal Update Form 1File: Form 1_M Mhada_Q2-Sing.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2-M MHADA-Q2.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3_M MHADA-Q2.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: Form 1_Q1_Mhada PORTAL.pdf | 5 Sep 2025 |
| Withdrawal Update Form 1File: Form 1_Q1_Mhada PORTAL.pdf | 5 Sep 2025 |
| Withdrawal Update Form 2File: Form 2_Q2_Mhada Final Sign Copy.pdf | 5 Sep 2025 |
| Withdrawal Update Form 2File: Form 2_Q2_Mhada Final Sign Copy.pdf | 5 Sep 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3-FINAL Q1-2025-26.pdf | 5 Sep 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE FORM 3-FINAL Q1-2025-26.pdf | 5 Sep 2025 |
| Form 1File: Form 1 Mar 2022.pdf | 21 Aug 2025 |
| Form 2File: Form 2 Mar 22.pdf | 21 Aug 2025 |
| Form 3File: Form 3 Mar 2022.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Promoters disclosure_March 22 -Mhada.pdf | 21 Aug 2025 |
| Form 1File: Form 1 Jun 2022.pdf | 21 Aug 2025 |
| Form 2File: Form 2 Jun 22.pdf | 21 Aug 2025 |
| Form 3File: Form 3 Jun 2022.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Promoter Disclosure_Q1_22-23.pdf | 21 Aug 2025 |
| Form 1File: Form 1 Sep 2022.pdf | 21 Aug 2025 |
| Form 2File: Form 2 Sep 22.pdf | 21 Aug 2025 |
| Form 3File: Form 3 Sep 2022.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Promoter Disclosure_Q2_22-23.pdf | 21 Aug 2025 |
| Form 1File: Form 1 Dec 2022.pdf | 21 Aug 2025 |
| Form 2File: Form 2 Dec 2022.pdf | 21 Aug 2025 |
| Form 3File: Form 3 FY 2022-23 Q3 Shree Sonigara Mhada.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Promoter Disclosure_Q3_22-23.pdf | 21 Aug 2025 |
| Form 1File: Form 1 Mar 2023.pdf | 21 Aug 2025 |
| Form 2File: Form 2 Mar 23.pdf | 21 Aug 2025 |
| Form 3File: Form 3 FY 2022-23 Q4 Shree Sonigara Mhada.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Promoter Disclosure_Q4_22-23.pdf | 21 Aug 2025 |
| Form 1File: Form 1 Jun 2023.pdf | 21 Aug 2025 |
| Form 2File: Form 2 Jun 23.pdf | 21 Aug 2025 |
| Form 3File: Form 3 Jun 2023.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Promoters disclosure_ June 23_Mhada.pdf | 21 Aug 2025 |
| Form 1File: Form 1 Mar 25.pdf | 6 Aug 2025 |
| Form 2File: Form 2 Mar 25.pdf | 6 Aug 2025 |
| Form 3File: Form 3 Mar 25.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Mar 25.pdf | 6 Aug 2025 |
| Form 1File: Form 1 Dec 2024.pdf | 6 Aug 2025 |
| Form 2File: Form 2 Dec 24.pdf | 6 Aug 2025 |
| Form 3File: Form 3 Dec 2024.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Dec 24.pdf | 6 Aug 2025 |
| Form 1File: Form 1 Sep 2024.pdf | 6 Aug 2025 |
| Form 2File: Form 2 Sep 24.pdf | 6 Aug 2025 |
| Form 3File: Form 3 Sep 2024.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Sep 24.pdf | 6 Aug 2025 |
| Form 1File: Form 1 Jun 2024.pdf | 6 Aug 2025 |
| Form 2File: Form 2 Jun 24.pdf | 6 Aug 2025 |
| Form 3File: Form-3.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Jun 24.pdf | 6 Aug 2025 |
| Form 1File: Form 1 Mar 2024.pdf | 6 Aug 2025 |
| Form 2File: Form 2 Mar 24.pdf | 6 Aug 2025 |
| Form 3File: Form 3 Mar 2024.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Mar 24.pdf | 6 Aug 2025 |
| Form 1File: Form 1 Dec 2023.pdf | 6 Aug 2025 |
| Form 2File: Form 2 Dec 23.pdf | 6 Aug 2025 |
| Form 3File: Form 3 Dec 2023.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Dec 23.pdf | 6 Aug 2025 |
| Form 1File: Form 1 Sep 23.pdf | 6 Aug 2025 |
| Form 2File: Form 2 Sep-23.pdf | 6 Aug 2025 |
| Form 3File: Form-3.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Sep 23.pdf | 6 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_M Mhada.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mhada Q4 2024-25 Form 3.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mhada_Q4.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Promoters disclosure_Q4-Mhada.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -MAHADA.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_M-MHADA_2023-24.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mhada_Q3.pdf | 11 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Q3 FY 2024-25.pdf | 11 Feb 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SIGNATURE RITZP52100052042 | THERGAON, Pune | 288 | Jul 2023 | Ongoing | Dec 2028 | Not due yet |
| SIGNATURE PARK E F I AND J BUILDINGSP52100027402 | DANGE CHOWK THERGAON, Pune | 360 | Dec 2020 | Completed | Jun 2026 | Aug 2024 |
| SIGNATURE PARK G AND H BUILDINGP52100019960 | THERGAON, Pune | - | Mar 2019 | Completed | Apr 2024 | Mar 2022 |
| SIGNATURE PARK C AND D BUILDINGP52100020943 | THERGAON, Pune | - | May 2019 | Completed | Apr 2024 | Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 141 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SIGNATURE PARK BUILDING M MHADA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near THERGAON13,700+ in Pune
Filed coordinates, straight-line distance. 191 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: SHREE SONIGARA REALCON
SHREE SONIGARA REALCON has 6 registrations on MahaRERA, including SIGNATURE PARK G AND H BUILDING and SIGNATURE PARK C AND D BUILDING. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SIGNATURE PARK BUILDING M MHADA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SIGNATURE PARK BUILDING M MHADA is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIGNATURE PARK BUILDING M MHADA?
The registered promoter entity is SHREE SONIGARA REALCON, a partnership as per the filing. Its GSTIN 27ADBFS4676G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIGNATURE PARK BUILDING M MHADA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SIGNATURE PARK BUILDING M MHADA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIGNATURE PARK BUILDING M MHADA?
The professionals named in the filing: Architect: SACHIN SUTAR (UNUSUAL SPACES) Sutar; Engineer: JW CONSULTANTS; Engineer: Girish Mahajan; Engineer: Yogesh Shivaji Ghuge; Engineer: Amol Naik; Chartered Accountant: CA DILIP JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIGNATURE PARK BUILDING M MHADA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback