Home / Browse projects / Pune, Maharashtra / SIGNATURE PARK C AND D BUILDING
SIGNATURE PARK C AND D BUILDING
RG-MH-04967 · RERA P52100020943 · Last updated on MahaRERA portal: 2 Aug 2022
Source: official MahaRERA filing
Red flags
- 66 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SIGNATURE PARK C AND D BUILDING is a Others project by SHREE SONIGARA REALCON in Pune, Maharashtra, registered with MahaRERA as P52100020943 on 23 May 2019. The registration is recorded completed; possession was promised by 1 Apr 2024. 66 complaints are on record with the regulator.
At a glance
Project
- NameSIGNATURE PARK C AND D BUILDING
- TypeOthers
- Location
- DANGE CHOWK
- THERGAON
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100020943
- ReraGenie IDRG-MH-04967
Builder
- NameSHREE SONIGARA REALCON
- Entity typePartnership
- GSTIN27ADBFS4676G1ZT
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersBAHVESH BHAGCHAND SONIGARA, KETUL BHAGCHAND SONIGARA, RAHUL BHAGCHAND SONIGARA, JITENDRA PANRAJ SONIGARA, MITESH MAFATLAL DOSHI
- Other registrations5 more →
- Completed2 of 6
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 May 2019
- Promised completion1 Apr 2024
- Revised completionNone
- Buildings2 building records
- Documents filed46 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C BUILDING | NA | 17 | 0 | 0 | 0 | 0 |
| D BUILDING | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 2 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 95%.
C BUILDING42%
| Activity | Progress |
|---|---|
| Excavation | 95% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D BUILDING42%
| Activity | Progress |
|---|---|
| Excavation | 95% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHT. SACHIN SUTAR ( FIRM - UNUSUAL SPACES) |
| Engineer | J+W CONSULTANTS. |
| Partner | Role in project |
|---|---|
| SHREE SONIGARA REALCON | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1700/2018 | CIVIL COURT SHIVAJINAGAR | PENDING FOR APPEARANCE |
Complaints filed with MahaRERA66
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601582 | Vishnudas Ranjane | SHREE SONIGARA REALCON | 21/03/2026 |
| CC12601587 | Seema Suhas Gandhi | SHREE SONIGARA REALCON | 22/03/2026 |
| CC12601591 | Satish Yashwant Jadhav | SHREE SONIGARA REALCON | 22/03/2026 |
| CC12601595 | Gaurab Rakshit | SHREE SONIGARA REALCON | 22/03/2026 |
| CC12601597 | Pravin Thombre | SHREE SONIGARA REALCON | 22/03/2026 |
| CC12601602 | Sainath Langote | SHREE SONIGARA REALCON | 22/03/2026 |
| CC12601604 | Vrushali Waman | SHREE SONIGARA REALCON | 22/03/2026 |
| CC12601611 | Sudeshna Chaudhari | SHREE SONIGARA REALCON | 23/03/2026 |
| CC12601629 | Sunil Patil | SHREE SONIGARA REALCON | 23/03/2026 |
| CC12601630 | Rahul Sarde | SHREE SONIGARA REALCON | 23/03/2026 |
| CC12601632 | Nilesh Gulhane | SHREE SONIGARA REALCON | 23/03/2026 |
| CC12601633 | Govind Zarkar | SHREE SONIGARA REALCON | 23/03/2026 |
| CC12601640 | Yogesh Patil | SHREE SONIGARA REALCON | 23/03/2026 |
| CC12601641 | Ankush Patil | SHREE SONIGARA REALCON | 23/03/2026 |
| CC12601646 | Rohit Uttamrao Sarwade | SHREE SONIGARA REALCON | 23/03/2026 |
| CC12601655 | Abhijit Nikam | SHREE SONIGARA REALCON | 24/03/2026 |
| CC12601666 | Mahesh Talekar | SHREE SONIGARA REALCON | 24/03/2026 |
| CC12601667 | Sanjay Kadam | SHREE SONIGARA REALCON | 24/03/2026 |
| CC12601670 | Sujata Nilesh Khedkar | SHREE SONIGARA REALCON | 24/03/2026 |
| CC12601698 | Ashitosh Appasaheb Jadhav | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601684 | Rahul Badgujar | SHREE SONIGARA REALCON | 24/03/2026 |
| CC12601702 | Goutam Jana | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601687 | Ganesh Swami | SHREE SONIGARA REALCON | 24/03/2026 |
| CC12601688 | Prashantkumar Rana | SHREE SONIGARA REALCON | 24/03/2026 |
| CC12601689 | Sushil Warang | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601690 | Rajesh Dhakate | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601691 | Sachin Shinde | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601700 | Rakhi Kailash Chaurasia | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601706 | Gunjan Vikas Pareek | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601707 | Aradhana Khalkho | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601708 | madhuri Gujar | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601713 | Pushpa Gaikwad | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601715 | siddharth Jain | SHREE SONIGARA REALCON | 25/03/2026 |
| CC12601742 | Jaydeep Chaudhari | SHREE SONIGARA REALCON | 26/03/2026 |
| CC12601731 | Ninad Bedmutha | SHREE SONIGARA REALCON | 26/03/2026 |
| CC12601733 | kedar Karanjikar | SHREE SONIGARA REALCON | 26/03/2026 |
| CC12601740 | Dr Kavita Jagdish Chopade | SHREE SONIGARA REALCON | 26/03/2026 |
| CC12601743 | Rajkumar janardhan Ipper | SHREE SONIGARA REALCON | 26/03/2026 |
| CC12601772 | Sandeep Gadve | SHREE SONIGARA REALCON | 27/03/2026 |
| CC12601763 | Sonali Giri | SHREE SONIGARA REALCON | 27/03/2026 |
| CC12601765 | Hitesh Gidye | SHREE SONIGARA REALCON | 27/03/2026 |
| CC12601766 | Gopal D Bhosale | SHREE SONIGARA REALCON | 27/03/2026 |
| CC12601817 | Pravin Lale | SHREE SONIGARA REALCON | 28/03/2026 |
| CC12601768 | Mohak Narang | SHREE SONIGARA REALCON | 27/03/2026 |
| CC12601767 | Yashodip More | SHREE SONIGARA REALCON | 27/03/2026 |
| CC12601771 | Girish Chaudhari | SHREE SONIGARA REALCON | 27/03/2026 |
| CC12601826 | Yogesh Dukale | SHREE SONIGARA REALCON | 28/03/2026 |
| CC12601921 | Chandramani Kumbhale | SHREE SONIGARA REALCON | 01/04/2026 |
| CC12601827 | Uddhav Mhatre | SHREE SONIGARA REALCON | 28/03/2026 |
| CC12601889 | Ritika Kumari | SHREE SONIGARA REALCON | 31/03/2026 |
| CC12601847 | Suhas Sawant | SHREE SONIGARA REALCON | 29/03/2026 |
| CC12601848 | Bhushan Patil | SHREE SONIGARA REALCON | 29/03/2026 |
| CC12601850 | Abhijeet Ramkrishna Joshi | SHREE SONIGARA REALCON | 29/03/2026 |
| CC12601852 | Nandkishor Murugkar | SHREE SONIGARA REALCON | 29/03/2026 |
| CC12601855 | Rohit Murugkar | SHREE SONIGARA REALCON | 29/03/2026 |
| CC12602026 | Sanjay Lagad | SHREE SONIGARA REALCON | 06/04/2026 |
| CC12601902 | Ashish Petkar | SHREE SONIGARA REALCON | 31/03/2026 |
| CC12601901 | Rimpal Uppal | SHREE SONIGARA REALCON | 31/03/2026 |
| CC12601904 | Rajesh Kapse | SHREE SONIGARA REALCON | 31/03/2026 |
| CC12601908 | Ranjit Gupte | SHREE SONIGARA REALCON | 31/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Jul 2022
Documents filed46
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 C D Wing.pdf | 2 Aug 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion C D BUILDING.pdf | 29 Jul 2022 |
| Building plan approvalFile: C 1.pdf | 27 Jan 2022 |
| Building plan approvalFile: C 2.pdf | 27 Jan 2022 |
| Building plan approvalFile: C 3.pdf | 27 Jan 2022 |
| Building plan approvalFile: C 4.pdf | 27 Jan 2022 |
| Building plan approvalFile: D 1.pdf | 27 Jan 2022 |
| Building plan approvalFile: D 2.pdf | 27 Jan 2022 |
| Building plan approvalFile: D 3.pdf | 27 Jan 2022 |
| Building plan approvalFile: D 4.pdf | 27 Jan 2022 |
| Building Plan Approval (IOD)File: C 1.pdf | 27 Jan 2022 |
| Building Plan Approval (IOD)File: C 2.pdf | 27 Jan 2022 |
| Building Plan Approval (IOD)File: C 3.pdf | 27 Jan 2022 |
| Building Plan Approval (IOD)File: C 4.pdf | 27 Jan 2022 |
| Building Plan Approval (IOD)File: D 1.pdf | 27 Jan 2022 |
| Building Plan Approval (IOD)File: D 2.pdf | 27 Jan 2022 |
| Building Plan Approval (IOD)File: D 3.pdf | 27 Jan 2022 |
| Building Plan Approval (IOD)File: D 4.pdf | 27 Jan 2022 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate C AND D.pdf | 27 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Engineers certificate - C and D Building.pdf | 27 Jan 2022 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT - C AND D BUILDING.pdf | 21 Oct 2021 |
| Certificates of CA (Form 3)File: CA Certificate C D Q3.pdf | 29 Jun 2021 |
| Certificates of CA (Form 3)File: CA Certificate C D WING.pdf | 13 Jan 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert C D Q1.pdf | 30 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engr Cert C D.pdf | 30 Sep 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A C D.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: CA Certificate Q1 C D.pdf | 30 Sep 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 C D.pdf | 18 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engr Certificate Form 2.pdf | 7 Aug 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Form 2A.pdf | 7 Aug 2020 |
| Certificates of CA (Form 3)File: CA Certificate Q4.pdf | 7 Aug 2020 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf | 18 Jun 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf | 15 Feb 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate.pdf | 15 Feb 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf | 15 Feb 2020 |
| Certificates of CA (Form 3)File: CA Certificate Q3.pdf | 15 Feb 2020 |
| Building plan approvalFile: SANCTION PLAN - C and D.pdf | 14 May 2019 |
| Layout approvalFile: IOD Layout.pdf | 14 May 2019 |
| Copy of the legal title reportFile: TITLE CERTIFICATE.pdf | 14 May 2019 |
| Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE.pdf | 14 May 2019 |
| Copy of Layout Approval (in case of layout)File: IOD Layout.pdf | 14 May 2019 |
| Building Plan Approval (IOD)File: SANCTION PLAN - C and D.pdf | 14 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 14 May 2019 |
| Declaration in FORM BFile: FORM B - PROMOTER.pdf | 14 May 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 14 May 2019 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 14 May 2019 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SIGNATURE RITZP52100052042 | THERGAON, Pune | 288 | Jul 2023 | Ongoing | Dec 2028 | Not due yet |
| SIGNATURE PARK E F I AND J BUILDINGSP52100027402 | DANGE CHOWK THERGAON, Pune | 360 | Dec 2020 | Completed | Jun 2026 | Aug 2024 |
| SIGNATURE PARK BUILDING M MHADAP52100032493 | THERGAON, Pune | 107 | Jan 2022 | Ongoing | Dec 2025 | Not delivered |
| SIGNATURE PARK G AND H BUILDINGP52100019960 | THERGAON, Pune | - | Mar 2019 | Completed | Apr 2024 | Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 46 filed documents as one ZIP, foldered, with a manifest
Keep SIGNATURE PARK C AND D BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near THERGAON13,700+ in Pune
Filed coordinates, straight-line distance. 268 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: SHREE SONIGARA REALCON
SHREE SONIGARA REALCON has 6 registrations on MahaRERA, including SIGNATURE PARK G AND H BUILDING and SIGNATURE PARK C AND D BUILDING. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SIGNATURE PARK C AND D BUILDING is delayed beyond 1 Apr 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SIGNATURE PARK C AND D BUILDING?
The registered promoter entity is SHREE SONIGARA REALCON, a partnership as per the filing. Its GSTIN 27ADBFS4676G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SIGNATURE PARK C AND D BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SIGNATURE PARK C AND D BUILDING?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SIGNATURE PARK C AND D BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SIGNATURE PARK C AND D BUILDING?
The professionals named in the filing: Architect: ARCHT. SACHIN SUTAR ( FIRM - UNUSUAL SPACES); Engineer: J+W CONSULTANTS.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIGNATURE PARK C AND D BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback