Home / Browse projects / Pune, Maharashtra / SHRINIVAS APARTMENT

Registered No litigation declared Residential / Group Housing project

SHRINIVAS APARTMENT

By DESHPANDE LANDMARK PRIVATE LIMITED

RG-MH-35379 · RERA P52100077103 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 12 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
7 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

SHRINIVAS APARTMENT is a Residential / Group Housing project by DESHPANDE LANDMARK PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100077103 on 23 Jul 2024. Possession is promised by 30 Oct 2026. The completion date has moved by 12 months from the original filing. 5 of the 12 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHRINIVAS APARTMENT
  • TypeResidential / Group Housing
  • Location
    • plot no 53 kothrud
    • kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077103
  • ReraGenie IDRG-MH-35379

Builder

  • NameDESHPANDE LANDMARK PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109PN2018PTC180786
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsSHEETAL YOGESH DESHPANDE, YOGESH AMBADAS DESHPANDE
  • Other registrations3 more →
  • Past their filed date1
  • Declared earlier projects5 →

Key dates

this monthRegisteredJul 2024First promiseOct 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion30 Oct 2026
  • Revised completionRevised to 30 Oct 2026 (originally 23 Oct 2025)
  • Buildings1 building record
  • Documents filed69 files

Current status

42%5 of 12 units booked
26.6%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shrinivas ApartmentNA4412012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Shrinivas Apartment: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area498 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Oct 2025
LandownerVillageDistrict
Vijay Hanumantrao NargundKothrudPune
Jayashri Surjit DasKothrudPune
Vrishali Vijay NargundKothrudPune
Roopashri jigeeshu DivatiaKothrudPune
Hemlata Anant AntarkarKothrudPune
Pradeep Ramchandra JawlekarKothrudPune
Prasad Ram PathakKothrudPune
Meena Ramchandra jawlekarKothrudPune
Padmavati Hanumantrao NargundKothrudPune
Sangeeta Prasad PathakKothrudPune
Jayashree Pradeep JawlekarKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1121.33
Proposed, not sanctioned1,121 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNal Stop Pune Maharashtra Ground floor showroom 23 pinnacle padmanabh pune 411004
Estimated costRs 4.70 cr
Cost incurredRs 1.25 cr
Work done26.65%
BuildingWingEstimatedIncurred
Shrinivas ApartmentNARs 4.18 crRs 1.25 cr
-NARs 52.48 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDevendra Dere
EngineerK C Maniyar
EngineerSagar Rathod
Chartered AccountantSPAK & Co
Chartered AccountantBogati & Co.
PartnerRole in project
DESHPANDE LANDMARK PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25112518428Oct 2025 → Oct 2026

Reason as filed by the promoterI was planning to expand the project, but there was a delay in receiving the sanction plan from the local authority. This setback has postponed our project timeline as we need the official approval to proceed with the expansion

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2026

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1_shrinivas_mar 26.pdf22 Apr 2026
Withdrawal Update Form 2File: form 2 _shrinivas_mar 26.pdf22 Apr 2026
Withdrawal Update Form 3File: form 3 _shrinivas_mar 26.pdf22 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A _Shrinivas apt_mar 25 (1).pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 Qtr Sep 2025 Shriniwas.pdf25 Nov 2025
Withdrawal Update Form 2File: Form 2 Qtr Sep 2025 Shriniwas.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3 Qtr Sep 2025_2 Shriniwas Promoter.pdf25 Nov 2025
Form 1File: Form 1__Shreenivas Sep 24.PDF20 Nov 2025
Form 2File: Form 2__Sept 2024 final.pdf20 Nov 2025
Form 3File: Form 3__Shriniwas Sept 24.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure__Sep 2024.pdf20 Nov 2025
Form 1File: Form 1__Shreenivas Dec 24.PDF20 Nov 2025
Form 2File: Form 2__dec 2024 final.pdf20 Nov 2025
Form 3File: Form 3__Shriniwas Dec 24.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure__Dec 2024.pdf20 Nov 2025
Form 1File: Form 1__Mar25.pdf20 Nov 2025
Form 2File: Form 2__Mar 25_compressed.pdf20 Nov 2025
Form 3File: Form 3__Shriniwas Mar 25.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure__Mar 25.pdf20 Nov 2025
Withdrawal Update Form 1File: Form 1 Qtr Sep 2025 Shriniwas.pdf17 Nov 2025
Withdrawal Update Form 2File: Form 2 Qtr Sep 2025 Shriniwas.pdf17 Nov 2025
Withdrawal Update Form 3File: Form 3 Qtr Sep 2025_2 Shriniwas Promoter.pdf17 Nov 2025
Withdrawal Update Form 1File: Form 1 Qtr Shrinivas 1 2025 Final.pdf5 Nov 2025
Withdrawal Update Form 2File: Form 2 Qtr Shrinivas 1 2025 Final.pdf5 Nov 2025
Withdrawal Update Form 3File: Form-3 Shrinivas Jun-25.pdf5 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Y- 2025-26_Shrinivas.pdf8 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 25_compressed.pdf8 May 2025
Layout approvalFile: DLPL SHRINIWAS APARTMENT UPTO 4TH FLOOR SANCTION PLAN_compressed.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: DLPL SHRINIWAS APARTMENT UPTO 4TH FLOOR SANCTION PLAN_compressed.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Qtr 2 Y - 2024-25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Qtr 3 Y - 2024-25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Qtr 4 Y - 2024-25.pdf23 Apr 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf23 Apr 2025
Building plan approvalFile: 4th Floor plan.pdf17 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: DLPL SHRINIWAS COMMENCEMENT CERTIFICATE 03-02-2025.pdf17 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4th Floor plan.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep 24 uploaded.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 2024 final.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Sep 24.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Dec 24.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Sep 24 SD.pdf18 Mar 2025
Disclosure of sold/ booked inventoryFile: Dec 24 SD.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Jul 2024
Other - TechnicalFile: ANNEXURE -A.pdf17 Jul 2024
Proforma of Agreement for saleFile: AFS.pdf9 Jul 2024
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf9 Jul 2024
Copy of the legal title reportFile: LTR.pdf17 Jun 2024
Details of encumbrances concerned to FinanceFile: 1111.pdf11 Apr 2024
Details of encumbrances concerned to LegalFile: 1111.pdf11 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 00000.pdf11 Apr 2024
Building plan approvalFile: GetUserDocumentFileContent (9).pdf1 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: GetUserDocumentFileContent (9).pdf1 Apr 2024
CERSAI detailsFile: Cersai.PDF8 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Sheetal.PDF8 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Yogesh.PDF8 Mar 2024
Other - LegalFile: Annexre A.PDF8 Mar 2024
Proforma of Allotment letterFile: Model Form _Allotment Letter_compressed.pdf7 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.PDF7 Mar 2024
Other - LegalFile: CC SS.pdf7 Mar 2024
Layout approvalFile: Shrinivas 10-10-2023 cc-1599-23-sanction plan till 3rd floor_compressed (1).pdf23 Feb 2024
PAN CardFile: company pan card.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: No EncurmbrancesLetter_Legal.PDF23 Feb 2024
Details of encumbrances concerned to LegalFile: No EncurmbrancesLetter_Legal.PDF23 Feb 2024
Copy of Layout Approval (in case of layout)File: Shrinivas 10-10-2023 cc-1599-23-sanction plan till 3rd floor_compressed (1).pdf23 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Feb 2024
Declaration about Commencement CertificateFile: Declaration About CC.PDF23 Feb 2024
Declaration in FORM BFile: Form B_compressed.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2Feb.PDF23 Feb 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Wishful 60 ExoticaP52100035104THAKSEN NAGAR, Pune25May 2022OngoingApr 2027Not due yet
KomalP52100047236Karvenagar, Pune14Oct 2022OngoingDec 2025Registered original: Jan 2025Not delivered
CHANDRA APARTMENTP52100045316Kothrud, Pune14May 2022OngoingDec 2025Registered original: May 2024Not delivered
Vallabh Co-op Housing SocietyP52100050438Bhamburda, Pune33Apr 2023OngoingSep 2025Registered original: Mar 2025Not delivered

How this compares with Pune

42%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRINIVAS APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near kothrud13,700+ in Pune

2 kmSHRINIVAS APARTMENTCompleted 54Lapsed / revoked 34Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 181 registered projects within 2 km.

Builder: DESHPANDE LANDMARK PRIVATE LIMITED

DESHPANDE LANDMARK PRIVATE LIMITED has 4 registrations on MahaRERA, including CHANDRA APARTMENT and SHRINIVAS APARTMENT. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHRINIVAS APARTMENT is delayed beyond 30 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRINIVAS APARTMENT?

The registered promoter entity is DESHPANDE LANDMARK PRIVATE LIMITED, a company as per the filing. Its CIN U70109PN2018PTC180786 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRINIVAS APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRINIVAS APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRINIVAS APARTMENT?

The professionals named in the filing: Architect: Devendra Dere; Engineer: K C Maniyar; Engineer: Sagar Rathod; Chartered Accountant: SPAK & Co; Chartered Accountant: Bogati & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRINIVAS APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRINIVAS APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRINIVAS APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.