SHRINIVAS APARTMENT
By DESHPANDE LANDMARK PRIVATE LIMITED
RG-MH-35379 · RERA P52100077103 · Last updated on MahaRERA portal: 22 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHRINIVAS APARTMENT is a Residential / Group Housing project by DESHPANDE LANDMARK PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100077103 on 23 Jul 2024. Possession is promised by 30 Oct 2026. The completion date has moved by 12 months from the original filing. 5 of the 12 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameSHRINIVAS APARTMENT
- TypeResidential / Group Housing
- Location
- plot no 53 kothrud
- kothrud
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100077103
- ReraGenie IDRG-MH-35379
Builder
- NameDESHPANDE LANDMARK PRIVATE LIMITED
- Entity typeCompany
- CINU70109PN2018PTC180786
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsSHEETAL YOGESH DESHPANDE, YOGESH AMBADAS DESHPANDE
- Other registrations3 more →
- Past their filed date1
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jul 2024
- Promised completion30 Oct 2026
- Revised completionRevised to 30 Oct 2026 (originally 23 Oct 2025)
- Buildings1 building record
- Documents filed69 files
Current status
Figures as on 22 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shrinivas Apartment | NA | 4 | 4 | 12 | 0 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
Shrinivas Apartment: 33% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership11
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Vijay Hanumantrao Nargund | Kothrud | Pune |
| Jayashri Surjit Das | Kothrud | Pune |
| Vrishali Vijay Nargund | Kothrud | Pune |
| Roopashri jigeeshu Divatia | Kothrud | Pune |
| Hemlata Anant Antarkar | Kothrud | Pune |
| Pradeep Ramchandra Jawlekar | Kothrud | Pune |
| Prasad Ram Pathak | Kothrud | Pune |
| Meena Ramchandra jawlekar | Kothrud | Pune |
| Padmavati Hanumantrao Nargund | Kothrud | Pune |
| Sangeeta Prasad Pathak | Kothrud | Pune |
| Jayashree Pradeep Jawlekar | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shrinivas Apartment | NA | Rs 4.18 cr | Rs 1.25 cr |
| - | NA | Rs 52.48 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Devendra Dere |
| Engineer | K C Maniyar |
| Engineer | Sagar Rathod |
| Chartered Accountant | SPAK & Co |
| Chartered Accountant | Bogati & Co. |
| Partner | Role in project |
|---|---|
| DESHPANDE LANDMARK PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI was planning to expand the project, but there was a delay in receiving the sanction plan from the local authority. This setback has postponed our project timeline as we need the official approval to proceed with the expansion
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Oct 2026
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1_shrinivas_mar 26.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: form 2 _shrinivas_mar 26.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: form 3 _shrinivas_mar 26.pdf | 22 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A _Shrinivas apt_mar 25 (1).pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Qtr Sep 2025 Shriniwas.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Qtr Sep 2025 Shriniwas.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Qtr Sep 2025_2 Shriniwas Promoter.pdf | 25 Nov 2025 |
| Form 1File: Form 1__Shreenivas Sep 24.PDF | 20 Nov 2025 |
| Form 2File: Form 2__Sept 2024 final.pdf | 20 Nov 2025 |
| Form 3File: Form 3__Shriniwas Sept 24.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure__Sep 2024.pdf | 20 Nov 2025 |
| Form 1File: Form 1__Shreenivas Dec 24.PDF | 20 Nov 2025 |
| Form 2File: Form 2__dec 2024 final.pdf | 20 Nov 2025 |
| Form 3File: Form 3__Shriniwas Dec 24.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure__Dec 2024.pdf | 20 Nov 2025 |
| Form 1File: Form 1__Mar25.pdf | 20 Nov 2025 |
| Form 2File: Form 2__Mar 25_compressed.pdf | 20 Nov 2025 |
| Form 3File: Form 3__Shriniwas Mar 25.pdf | 20 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Disclosure__Mar 25.pdf | 20 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Qtr Sep 2025 Shriniwas.pdf | 17 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Qtr Sep 2025 Shriniwas.pdf | 17 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Qtr Sep 2025_2 Shriniwas Promoter.pdf | 17 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Qtr Shrinivas 1 2025 Final.pdf | 5 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Qtr Shrinivas 1 2025 Final.pdf | 5 Nov 2025 |
| Withdrawal Update Form 3File: Form-3 Shrinivas Jun-25.pdf | 5 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Y- 2025-26_Shrinivas.pdf | 8 Oct 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 25_compressed.pdf | 8 May 2025 |
| Layout approvalFile: DLPL SHRINIWAS APARTMENT UPTO 4TH FLOOR SANCTION PLAN_compressed.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: DLPL SHRINIWAS APARTMENT UPTO 4TH FLOOR SANCTION PLAN_compressed.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Qtr 2 Y - 2024-25.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Qtr 3 Y - 2024-25.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Qtr 4 Y - 2024-25.pdf | 23 Apr 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 23 Apr 2025 |
| Building plan approvalFile: 4th Floor plan.pdf | 17 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: DLPL SHRINIWAS COMMENCEMENT CERTIFICATE 03-02-2025.pdf | 17 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4th Floor plan.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep 24 uploaded.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: dec 2024 final.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Sep 24.pdf | 18 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Dec 24.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sep 24 SD.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Dec 24 SD.pdf | 18 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 17 Jul 2024 |
| Other - TechnicalFile: ANNEXURE -A.pdf | 17 Jul 2024 |
| Proforma of Agreement for saleFile: AFS.pdf | 9 Jul 2024 |
| Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf | 9 Jul 2024 |
| Copy of the legal title reportFile: LTR.pdf | 17 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: 1111.pdf | 11 Apr 2024 |
| Details of encumbrances concerned to LegalFile: 1111.pdf | 11 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 00000.pdf | 11 Apr 2024 |
| Building plan approvalFile: GetUserDocumentFileContent (9).pdf | 1 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: GetUserDocumentFileContent (9).pdf | 1 Apr 2024 |
| CERSAI detailsFile: Cersai.PDF | 8 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Sheetal.PDF | 8 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Yogesh.PDF | 8 Mar 2024 |
| Other - LegalFile: Annexre A.PDF | 8 Mar 2024 |
| Proforma of Allotment letterFile: Model Form _Allotment Letter_compressed.pdf | 7 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.PDF | 7 Mar 2024 |
| Other - LegalFile: CC SS.pdf | 7 Mar 2024 |
| Layout approvalFile: Shrinivas 10-10-2023 cc-1599-23-sanction plan till 3rd floor_compressed (1).pdf | 23 Feb 2024 |
| PAN CardFile: company pan card.pdf | 23 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: No EncurmbrancesLetter_Legal.PDF | 23 Feb 2024 |
| Details of encumbrances concerned to LegalFile: No EncurmbrancesLetter_Legal.PDF | 23 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Shrinivas 10-10-2023 cc-1599-23-sanction plan till 3rd floor_compressed (1).pdf | 23 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 23 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration About CC.PDF | 23 Feb 2024 |
| Declaration in FORM BFile: Form B_compressed.pdf | 23 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF | 23 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2Feb.PDF | 23 Feb 2024 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Wishful 60 ExoticaP52100035104 | THAKSEN NAGAR, Pune | 25 | May 2022 | Ongoing | Apr 2027 | Not due yet |
| KomalP52100047236 | Karvenagar, Pune | 14 | Oct 2022 | Ongoing | Dec 2025Registered original: Jan 2025 | Not delivered |
| CHANDRA APARTMENTP52100045316 | Kothrud, Pune | 14 | May 2022 | Ongoing | Dec 2025Registered original: May 2024 | Not delivered |
| Vallabh Co-op Housing SocietyP52100050438 | Bhamburda, Pune | 33 | Apr 2023 | Ongoing | Sep 2025Registered original: Mar 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHRINIVAS APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near kothrud13,700+ in Pune
Filed coordinates, straight-line distance. 181 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: DESHPANDE LANDMARK PRIVATE LIMITED
DESHPANDE LANDMARK PRIVATE LIMITED has 4 registrations on MahaRERA, including CHANDRA APARTMENT and SHRINIVAS APARTMENT. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHRINIVAS APARTMENT is delayed beyond 30 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHRINIVAS APARTMENT?
The registered promoter entity is DESHPANDE LANDMARK PRIVATE LIMITED, a company as per the filing. Its CIN U70109PN2018PTC180786 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHRINIVAS APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHRINIVAS APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHRINIVAS APARTMENT?
The professionals named in the filing: Architect: Devendra Dere; Engineer: K C Maniyar; Engineer: Sagar Rathod; Chartered Accountant: SPAK & Co; Chartered Accountant: Bogati & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHRINIVAS APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback