Home / Browse projects / Pune, Maharashtra / CHANDRA APARTMENT
CHANDRA APARTMENT
By DESHPANDE LANDMARK PRIVATE LIMITED
RG-MH-34563 · RERA P52100045316 · Last updated on MahaRERA portal: 10 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 2 months past the filed date
- Completion date moved by 27 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHANDRA APARTMENT is a Residential / Group Housing project by DESHPANDE LANDMARK PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100045316 on 12 May 2022. Possession was promised by 31 Aug 2026 and is now 2 months past that date. The completion date has moved by 27 months from the original filing. 6 of the 14 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameCHANDRA APARTMENT
- TypeResidential / Group Housing
- Location
- Kothrud
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045316
- ReraGenie IDRG-MH-34563
Builder
- NameDESHPANDE LANDMARK PRIVATE LIMITED
- Entity typeCompany
- CINU70109PN2018PTC180786
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsSHEETAL YOGESH DESHPANDE, YOGESH AMBADAS DESHPANDE
- Other registrations3 more →
- Past their filed date1
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 May 2022
- Promised completion31 Aug 2026
- Revised completionRevised to 31 Aug 2026 (originally 31 May 2024)
- Buildings1 building record
- Documents filed153 files
Current status
Figures as on 10 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CHANDRA APARTMENT | NA | 7 | 7 | 14 | 0 | 14 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
CHANDRA APARTMENT: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership13
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ashok Ganesh Kulkarni | Karve Nagar | Pune |
| VISHRAM VASANT KULKARNI | Karve Nagar | Pune |
| ANJALI VISHRAM KULKARNI | Karve Nagar | Pune |
| PRADEEP CHANDRAKANT MANDHARE | Karve Nagar | Pune |
| SUREKHA PRADEEP MANKHARE | Karve Nagar | Pune |
| VAISHALI ASHISH PRADHAN | Karve Nagar | Pune |
| TAPAN ASHISH PRADHAN | Karve Nagar | Pune |
| MITALI ASHISH PRADHAN | Karve Nagar | Pune |
| JAGDISH YASHWANT PRADHAN | Karve Nagar | Pune |
| SURABH JAGDISH PRADHAN | Karve Nagar | Pune |
| NITIN KRISHNARAO KULKARNI | Karve Nagar | Pune |
| RUPLAI NITIN KULKARNI | Karve Nagar | Pune |
| LEENA BIPIL PATIL | Karve Nagar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| CHANDRA APARTMENT | NA | Rs 4.09 cr | Rs 4.09 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Devendra Dhere |
| Engineer | Satish Marathe consulting engineers |
| Engineer | Sagar Hari Rathod |
| Chartered Accountant | CA PUSHPAK BOGATI |
| Chartered Accountant | SPAK & Co. |
| Chartered Accountant | PHULE WAGH & ASSOCIATES LLP |
| Chartered Accountant | Bogati & Co. |
| Partner | Role in project |
|---|---|
| DESHPANDE LANDMARK PRIVATE LIMITED | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDelay in construction is because of lack of Skill man power and no permeation for Local authority.
Reason as filed by the promoterI was planning to expand the project but there was delay in receiving the sanction plan from the local authority. This set back has postponed our project timeline as we need official approval to proceed with the expansion
Reason as filed by the promoter1. LACK OF LABOUR 2. AVALIBILITY OF CONSTRUCTION MATERIAL 3. RAIN IMPACT
Reason as filed by the promoterWE HAVE ALREADY APPLIED FOR THE OCCUPANCY CERTIFICATE TO THE PLANNING AUTHORITY PUNE MUNICIPAL CORPORATION IN THE MONTH OF SEPTEMBER 2025 BUT WE COULD NOT GET OC DUE TO UNAVOIDABLE CIRCUMSTANCES.WE HAVE RECEIVED OC ON DATED 11/05/2026.As per the query raised, the sanctioned BUA has been revised. Therefore, we request the necessary correction in our application.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed153
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A 2026.pdf | 10 Jul 2026 |
| Form 1File: FORM 1 CHANDRA OLD.pdf | 3 Jul 2026 |
| Form 2File: FORM 2 CHANDRA OLD.pdf | 3 Jul 2026 |
| Form 3File: FORM 3 CHANDRA OLD.pdf | 3 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD CHANDRA OLD.pdf | 3 Jul 2026 |
| Form 1File: FORM 1 CHANDRA OLD.pdf | 3 Jul 2026 |
| Form 2File: FORM 2 CHANDRA OLD.pdf | 3 Jul 2026 |
| Form 3File: FORM 3 CHANDRA OLD.pdf | 3 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD CHANDRA OLD.pdf | 3 Jul 2026 |
| Withdrawal Update Form 1File: Form 1_chandra _mar 26.pdf | 3 Jul 2026 |
| Withdrawal Update Form 1File: CHANDRA FORM 1.pdf | 3 Jul 2026 |
| Withdrawal Update Form 2File: form 2_chandra _mar 26.pdf | 3 Jul 2026 |
| Withdrawal Update Form 2File: CHANDRA FORM 2.pdf | 3 Jul 2026 |
| Withdrawal Update Form 3File: form 3 _chandra _mar 26.pdf | 3 Jul 2026 |
| Withdrawal Update Form 3File: CHANDRA FORM 3.pdf | 3 Jul 2026 |
| Withdrawal Update Form 1File: Form 1_Chandra_Dec25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2_Chandra_Dec25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 CHANDRA_DEC25.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Qtr Sep 2025_1 Chandra Promoter.pdf | 17 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Qtr Sep 2025_1 Chandra promoter.pdf | 17 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Qtr Sep 2025_1 Chandra Promoter.pdf | 17 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Y- 2025-26_Chandra.pdf | 8 Oct 2025 |
| Withdrawal Update Form 1File: Chandra Form 1 Qtr 1 2025 signed.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: Chandra Form 2 Qtr 1 2025.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: Chandra Form 3 Qtr 1 2025.pdf | 2 Aug 2025 |
| Form 1File: CHANDRA FORM 1 SEPT 2024.PDF | 26 Jul 2025 |
| Form 2File: Chandra Form 2 Sep 2024.PDF | 26 Jul 2025 |
| Form 3File: Chandra Apartment Sep 24 Form 3.pdf | 26 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sept 2024.PDF | 26 Jul 2025 |
| Form 1File: CHANDRA FORM 1 Dec 2024.PDF | 26 Jul 2025 |
| Form 2File: Chandra Form 2 Dec 2024.PDF | 26 Jul 2025 |
| Form 3File: Dec 2024.pdf | 26 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 2024.PDF | 26 Jul 2025 |
| Form 2File: Chandra Form 2 Mar 2025.pdf | 26 Jul 2025 |
| Form 1File: CHANDRA FORM 1 MAR-25.pdf | 26 Jul 2025 |
| Form 3File: CHANDRA CA Form 3 Mar 25.pdf | 26 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Chandra Disclosure March -25.pdf | 26 Jul 2025 |
| Form 1File: Chandra Form 1 Sep 2023.PDF | 25 Jul 2025 |
| Form 2File: Chandra Form 2 Sep 2023.PDF | 25 Jul 2025 |
| Form 3File: Chandra Form 3 Sep 2023.PDF | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sept 2023.PDF | 25 Jul 2025 |
| Form 1File: Chandra Form 1 Dec 2023.PDF | 25 Jul 2025 |
| Form 2File: Chandra Form 2 Dec 2023.PDF | 25 Jul 2025 |
| Form 3File: Chandra Form 3 Dec 2023.PDF | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 2023.PDF | 25 Jul 2025 |
| Form 1File: Form 1 Sep 22.pdf | 25 Jul 2025 |
| Form 2File: Form 2 Sep 22.pdf | 25 Jul 2025 |
| Form 3File: Sep 2022.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sept 2022.PDF | 25 Jul 2025 |
| Form 1File: Form 1 Dec 22.pdf | 25 Jul 2025 |
| Form 2File: Chandra Form 2 Dec 2022.pdf | 25 Jul 2025 |
| Form 3File: Dec 2022.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 2022.PDF | 25 Jul 2025 |
| Form 1File: Chandra Form 1 June 2023.PDF | 25 Jul 2025 |
| Form 3File: Jun 2023.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: June 2023.PDF | 25 Jul 2025 |
| Form 2File: Form 2 Jun 23.pdf | 25 Jul 2025 |
| Form 1File: Chandra Form 1 Mar 2024.PDF | 25 Jul 2025 |
| Form 2File: Chandra Form 2 Mar 2024.PDF | 25 Jul 2025 |
| Form 3File: Mar 2024.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: March 2024.PDF | 25 Jul 2025 |
| Form 1File: CHANDRA FORM 1 June 2024.PDF | 25 Jul 2025 |
| Form 2File: Chandra Form 2 June 2024.PDF | 25 Jul 2025 |
| Form 3File: Jun 2024.pdf | 25 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: June 2024.PDF | 25 Jul 2025 |
| Chandra Form 2 Mar-2025 | 29 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CHANDRA FORM 1 MAR-25.pdf | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHANDRA CA Form-3 Mar-25.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Chandra Disclosure March -25.pdf | 26 Apr 2025 |
| Declaration in FORM BFile: 5 (4).pdf | 5 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandra Form 1 for Sep 2022.pdf | 5 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandra Form 1 for Dec 2022.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert Qtr - 3 Y - 2022 (2).pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandra Form 1 for June 22.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandra Form 1 for Sep 2022.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandra Form 2 for Sep 2022.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandra Form 2 for Dec 2022.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandra Form 2 for Mar 2023.pdf | 5 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandra Form 2 for June 23.pdf | 5 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Cert Y 2023 - 2024.pdf | 4 Mar 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Wishful 60 ExoticaP52100035104 | THAKSEN NAGAR, Pune | 25 | May 2022 | Ongoing | Apr 2027 | Not due yet |
| KomalP52100047236 | Karvenagar, Pune | 14 | Oct 2022 | Ongoing | Dec 2025Registered original: Jan 2025 | Not delivered |
| SHRINIVAS APARTMENTP52100077103 | kothrud, Pune | 12 | Jul 2024 | Ongoing | Oct 2025 | Not delivered |
| Vallabh Co-op Housing SocietyP52100050438 | Bhamburda, Pune | 33 | Apr 2023 | Ongoing | Sep 2025Registered original: Mar 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 153 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CHANDRA APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kothrud13,700+ in Pune
Filed coordinates, straight-line distance. 297 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: DESHPANDE LANDMARK PRIVATE LIMITED
DESHPANDE LANDMARK PRIVATE LIMITED has 4 registrations on MahaRERA, including CHANDRA APARTMENT and SHRINIVAS APARTMENT. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if CHANDRA APARTMENT is delayed beyond 31 Aug 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHANDRA APARTMENT?
The registered promoter entity is DESHPANDE LANDMARK PRIVATE LIMITED, a company as per the filing. Its CIN U70109PN2018PTC180786 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHANDRA APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHANDRA APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHANDRA APARTMENT?
The professionals named in the filing: Architect: Devendra Dhere; Engineer: Satish Marathe consulting engineers; Engineer: Sagar Hari Rathod; Chartered Accountant: CA PUSHPAK BOGATI; Chartered Accountant: SPAK & Co.; Chartered Accountant: PHULE WAGH & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHANDRA APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback