Home / Browse projects / Mumbai Suburban, Maharashtra / Shraddha Phoenix

Registered No litigation declared Residential / Group Housing project

Shraddha Phoenix

By Shraddha Prime Projects Limited

RG-MH-87595 · RERA PR1180002600141 · Last updated on MahaRERA portal: 8 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
225 of 225Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 10 documents Report an error

Shraddha Phoenix is a Residential / Group Housing project by Shraddha Prime Projects Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1180002600141 on 17 Apr 2026. Possession is promised by 31 Dec 2029. 0 of the 225 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameShraddha Phoenix
  • TypeResidential / Group Housing
  • Location
    • ‘T’ ward of BMC
    • Mulund (East)
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1180002600141
  • ReraGenie IDRG-MH-87595

Builder

  • NameShraddha Prime Projects Limited
  • Entity typeCompany
  • CINL70100MH1993PLC394793
  • GSTIN27AAACT6881D1Z8
  • DirectorsSudhir Balu Mehta, Ramchandra Krishna Ralkar, Santosh Sadashiv Samant, Shivangi Datta, Kapil Purohit, Ankita Manoj Gupta, Ashok Uttam Chandanshive
  • Other registrations7 more →
  • Declared earlier projects7 →

Key dates

this monthRegisteredApr 2026PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2026
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed10 files

Current status

0%0 of 225 units booked

Figures as on 8 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Composite BuildingSale Wing A181760666
Composite BuildingSale Wing B191759160
Composite BuildingRehab Wing C242099099

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Composite Building · wing Sale Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Composite Building · wing Sale Wing B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Composite Building · wing Rehab Wing C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered14
Stilt / Ground2
Stack Parking29
BuildingClosed/CoveredStilt / GroundStack ParkingTotal
Composite Building Sale Wing A0134
Composite Building Sale Wing B001414
Composite Building Rehab Wing C1411227

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,650 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Mar 2026

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI9285.95
Proposed, not sanctioned9,286 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16, Ground Floor, Kanakia Zillion, LBS-CST Road, Junction,BKC Annexe, Kurla(W),Mumbai,Maharashtra-400070

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS.S. Associates
EngineerRajan Tipnis
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Shraddha Prime Projects Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Apr 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed10

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration and undertaking (Annexure A)File: Annexure A - Order No 50.pdf8 Apr 2026
Layout approvalFile: Plan 1.pdf7 Apr 2026
Building plan approvalFile: Plan 2.pdf7 Apr 2026
Building plan approvalFile: Plan 3.pdf7 Apr 2026
Building plan approvalFile: Plan 4.pdf7 Apr 2026
Building plan approvalFile: Plan 5.pdf7 Apr 2026
Building plan approvalFile: Plan 6.pdf7 Apr 2026
Building plan approvalFile: Plan 7.pdf7 Apr 2026
Building plan approvalFile: Plan 8.pdf7 Apr 2026
Building plan approvalFile: Plan 9.pdf7 Apr 2026

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shraddha Park CityP51800055750Dahisar East, Borivali, Mumbai Suburban1,159Apr 2024OngoingDec 2029Not due yet
Pratham - By ShraddhaP51800077622Borivali East, Mumbai Suburban-Oct 2024OngoingDec 2029Not due yet
Shraddha Paradise EnclavePR1180002600018Veena Nagar Phase II, Mumbai Suburban207Apr 2026OngoingMar 2029Not due yet
Shraddha ParadiseP51800052244Borivali, Mumbai Suburban353Aug 2023OngoingDec 2028Not due yet
Shraddha PalaciousP51800052241Bhandup West, Mumbai Suburban398Aug 2023OngoingDec 2027Not due yet
Shraddha PavillionP51800049739Kanjurmarg East, Mumbai, Mumbai Suburban166Feb 2023OngoingJan 2027Not due yet
Shraddha PanoramaP51800053318Mulund, Mumbai Suburban282Oct 2023OngoingDec 2026Not due yet

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shraddha Phoenix on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund (East)6,700+ in Mumbai Suburban

2 kmShraddha PhoenixCompleted 88Lapsed / revoked 76Other 111Dot size: filed unitsN

Filed coordinates, straight-line distance. 275 registered projects within 2 km.

Builder: Shraddha Prime Projects Limited

Shraddha Prime Projects Limited has 8 registrations on MahaRERA, including Shraddha Pavillion and Shraddha Paradise. Its filings disclose 7 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shraddha Phoenix is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shraddha Phoenix?

The registered promoter entity is Shraddha Prime Projects Limited, a company as per the filing. Its CIN L70100MH1993PLC394793 and GSTIN 27AAACT6881D1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shraddha Phoenix?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shraddha Phoenix?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shraddha Phoenix?

The professionals named in the filing: Architect: S.S. Associates; Engineer: Rajan Tipnis; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shraddha Phoenix?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shraddha Phoenix. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shraddha Phoenix to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.