Shraddha Palacious

By Shraddha Prime Projects Limited

RG-MH-06305 · RERA P51800052241 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 86%
217 of 398Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

Shraddha Palacious is a Others project by Shraddha Prime Projects Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052241 on 2 Aug 2023. Possession is promised by 31 Dec 2027. 181 of the 398 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameShraddha Palacious
  • TypeOthers
  • Location
    • Subhash Road Janata Market
    • Bhandup West
    • Bhandup
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052241
  • ReraGenie IDRG-MH-06305

Builder

  • NameShraddha Prime Projects Limited
  • Entity typeCompany
  • CINL70100MH1993PLC394793
  • GSTIN27AAACT6881D1Z8
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSudhir Balu Mehta, Ramchandra Krishna Ralkar, Santosh Sadashiv Samant, Shivangi Datta, Nimisha Soni, Rohit Mahesh Agrawal
  • Other registrations7 more →
  • Declared earlier projects7 →

Key dates

this monthRegisteredAug 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Aug 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed136 files

Current status

45%181 of 398 units booked
54.4%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA42392090209
B WingNA41401854189

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 86%.

A Wing64%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)36%
Plinth100%
Stilt Floor50%
Slabs of Super Structure86%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises67%
Sanitary Fittings within the flats / premises56%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks62%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
B Wing43%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)36%
Plinth100%
Stilt Floor0%
Slabs of Super Structure84%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises37%
Sanitary Fittings within the flats / premises14%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks28%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed218

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots218
Closed/Covered218
BuildingClosed/CoveredTotal
A Wing109109
B Wing109109

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,193 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Jayshree BuildersThane (M Corp.)Thane

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI18827.03
Proposed, not sanctioned18,827 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 4, Runwal anthurium Retail, Old Gabriel Factory, Lbs Marg, Mulund West 400080
Estimated costRs 87.77 cr
Cost incurredRs 47.76 cr
Work done54.41%
BuildingWingEstimatedIncurred
A WingNARs 53.15 crRs 29.45 cr
B WingNARs 32.87 crRs 18.21 cr
-NARs 1.76 crRs 9.55 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSS Associates
EngineerNexus Consultants & Engineers
EngineerSK Consultants & Engineers
EngineerRAJENDRA BANKAR
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Shraddha Prime Projects Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A FY 25-26 SHRADDHA PALACIOUS.pdf2 Jul 2026
Form 2A (FY 2023-2024)File: FORM 2A- FY 23-24 SHRADDHA PALACIOUS.pdf19 Jun 2026
Form 2A (FY 2024-2025)File: FORM 2A- FY 24-25 SHRADDHA PALACIOUS.pdf19 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 - Shraddha Palacious for FY 2024-25.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Palacious as on March 2026.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Palacious as on March 2026.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Palacious as on March 2026.pdf15 May 2026
Layout approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-2-highlighted.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-3.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-4.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-5.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-6.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-7.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-8.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-9.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-10.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-11.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-12.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-13.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-14.pdf20 Apr 2026
Building plan approvalFile: Amurtshruti Sale Bldg Amended IOD 14 10 2025-15.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Palacious as on Dec 2025.pdf21 Mar 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Palacious as on Dec 2025 (Signed).pdf21 Mar 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Palacious as on Dec 2025 (Signed).pdf21 Mar 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Palacious as on June 2025.pdf2 Jan 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Palacious as on Sep 2025.pdf2 Jan 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Palacious as on June 2025.pdf2 Jan 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Palacious as on Sep 2025.pdf2 Jan 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Palacious as on June 2025.pdf2 Jan 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Palacious as on Sep 2025.pdf2 Jan 2026
Layout approvalFile: Layout.pdf12 Dec 2025
Building plan approvalFile: Layout.pdf12 Dec 2025
Building plan approvalFile: Part Basement & Ground Floor.pdf12 Dec 2025
Building plan approvalFile: 1 - 6 Floor Part Residential and Part Podium.pdf12 Dec 2025
Building plan approvalFile: 7th Floor Part Residential and Part Amenity.pdf12 Dec 2025
Building plan approvalFile: 8, 15 and 22nd (Refuge).pdf12 Dec 2025
Building plan approvalFile: 9-14, 16-21.pdf12 Dec 2025
Building plan approvalFile: 22 (Refuge), 23-28, 30-35, 37-39.pdf12 Dec 2025
Building plan approvalFile: 29 & 36 (Refuge), Terrace & Service Floor (Above 22nd Floor).pdf12 Dec 2025
Building plan approvalFile: Elevation.pdf12 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Palacious as on March 2025.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Shraddha Palacious as on 31st March 2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palacious as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Palacious as on Dec 2024.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Palacious as on Dec 2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palacious as on Dec 2024.pdf14 Feb 2025
Proforma of Agreement for saleFile: AFS_Shraddha Palacious.pdf3 Feb 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE ON PROJECT SPPL Palacious.pdf24 Jan 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE ON PROJECT SPPL Palacious.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: sh palacious_0001_2_11zon.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Shraddha Palacious as on 30-09-2024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palacious as on Sep 2024.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Shraddha Palacious as on 30-09-2024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palacious as on Sep 2024.pdf19 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Shraddha Palacious.pdf14 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shraddha Palacious FY 2023-24.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SHRADDHA PALACIOUS as on Sep 2024.pdf29 Oct 2024
Layout approvalFile: Plan - Shraddha Palacious (REHAB) 1.pdf29 Jul 2024
Building plan approvalFile: Plan - Shraddha Palacious (REHAB) 2.pdf29 Jul 2024
Building plan approvalFile: Plan - Shraddha Palacious (REHAB) 3.pdf29 Jul 2024
Building plan approvalFile: Plan - Shraddha Palacious (REHAB) 4.pdf29 Jul 2024
Building plan approvalFile: Plan - Shraddha Palacious (REHAB) 5.pdf29 Jul 2024
Building plan approvalFile: Plan - Shraddha Palacious (REHAB) 6.pdf29 Jul 2024
Copy of Layout Approval (in case of layout)File: Plan - Shraddha Palacious (REHAB) 1.pdf29 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - Shraddha Palacious (REHAB) 2.pdf29 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - Shraddha Palacious (REHAB) 3.pdf29 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - Shraddha Palacious (REHAB) 4.pdf29 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - Shraddha Palacious (REHAB) 5.pdf29 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan - Shraddha Palacious (REHAB) 6.pdf29 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Shraddha Palacious (REHAB).pdf29 Jul 2024
Layout approvalFile: Palacious Layout.pdf27 Jul 2024
Building plan approvalFile: Pages from Rehab Plan - Shraddha Palacious 1.pdf27 Jul 2024
Building plan approvalFile: Pages from Rehab Plan - Shraddha Palacious 2.pdf27 Jul 2024
Building plan approvalFile: Palacious Sale 1.pdf27 Jul 2024
Building plan approvalFile: Palacious Sale 2.pdf27 Jul 2024
Building plan approvalFile: Palacious Sale 3.pdf27 Jul 2024
Building plan approvalFile: Palacious Sale 4.pdf27 Jul 2024
Building plan approvalFile: Palacious Sale 5.pdf27 Jul 2024
Building plan approvalFile: Palacious Sale 6.pdf27 Jul 2024
Copy of Layout Approval (in case of layout)File: Palacious Layout.pdf27 Jul 2024

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shraddha Park CityP51800055750Dahisar East, Borivali, Mumbai Suburban1,159Apr 2024OngoingDec 2029Not due yet
Pratham - By ShraddhaP51800077622Borivali East, Mumbai Suburban-Oct 2024OngoingDec 2029Not due yet
Shraddha Paradise EnclavePR1180002600018Veena Nagar Phase II, Mumbai Suburban207Apr 2026OngoingMar 2029Not due yet
Shraddha ParadiseP51800052244Borivali, Mumbai Suburban353Aug 2023OngoingDec 2028Not due yet
Shraddha PavillionP51800049739Kanjurmarg East, Mumbai, Mumbai Suburban166Feb 2023OngoingJan 2027Not due yet
Shraddha PanoramaP51800053318Mulund, Mumbai Suburban282Oct 2023OngoingDec 2026Not due yet

How this compares with Mumbai Suburban

45%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shraddha Palacious on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhandup West6,700+ in Mumbai Suburban

2 kmShraddha PalaciousCompleted 46Lapsed / revoked 25Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 141 registered projects within 2 km.

Builder: Shraddha Prime Projects Limited

Shraddha Prime Projects Limited has 8 registrations on MahaRERA, including Shraddha Pavillion and Shraddha Paradise. Its filings disclose 7 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shraddha Palacious is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shraddha Palacious?

The registered promoter entity is Shraddha Prime Projects Limited, a company as per the filing. Its CIN L70100MH1993PLC394793 and GSTIN 27AAACT6881D1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shraddha Palacious?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shraddha Palacious?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shraddha Palacious?

The professionals named in the filing: Architect: SS Associates; Engineer: Nexus Consultants & Engineers; Engineer: SK Consultants & Engineers; Engineer: RAJENDRA BANKAR; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shraddha Palacious?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shraddha Palacious. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shraddha Palacious to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.