Shraddha Paradise
By Shraddha Prime Projects Limited
RG-MH-06214 · RERA P51800052244 · Last updated on MahaRERA portal: 2 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 75.00 crore secured on the land, in favour of Axis Finance Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shraddha Paradise is a Residential / Group Housing project by Shraddha Prime Projects Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052244 on 2 Aug 2023. Possession is promised by 31 Dec 2028. 125 of the 356 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameShraddha Paradise
- TypeResidential / Group Housing
- Location
- Kosamgo Nagar Road
- Borivali
- Magathane
- Mumbai Suburban
- 400092
- Pincode400092
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800052244
- ReraGenie IDRG-MH-06214
Builder
- NameShraddha Prime Projects Limited
- Entity typeCompany
- CINL70100MH1993PLC394793
- GSTIN27AAACT6881D1Z8
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsSudhir Balu Mehta, Ramchandra Krishna Ralkar, Santosh Sadashiv Samant, Shivangi Datta, Nimisha Soni, Rohit Mahesh Agrawal
- Other registrations7 more →
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Aug 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed103 files
Current status
Figures as on 2 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A and Wing B | NA | 35 | 31 | 356 | 0 | 356 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 30%.
Wing A and Wing B: 33% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 30% |
| Slabs of Super Structure | 30% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 8% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed350
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Paradise Tower Co-Operative Housing Society Ltd | Ghatkopar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A and Wing B | NA | Rs 123.50 cr | Rs 51.78 cr |
| - | NA | Rs 6.50 cr | Rs 2.73 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sagar Makhela |
| Engineer | SK Consultants & Engineers |
| Engineer | RAJENDRA BANKAR |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Chartered Accountant | NB Sayed & Associates |
| Partner | Role in project |
|---|---|
| Shraddha Prime Projects Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Feb 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed103
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2A FY 25-26 SHRADDHA PARADISE.pdf | 2 Jul 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - Shraddha Paradise for FY 2023-24.pdf | 18 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - Shraddha Paradise for FY 2024-25.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Shraddha Paradise as on March 2026.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Shraddha Paradise as on March 2026.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form 3 - Shraddha Paradise as on March 2026.pdf | 23 May 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - Shraddha Paradise for FY 2024-25.pdf | 11 Mar 2026 |
| Form 5 (FY 2023-2024)File: Form 5 Shraddha Paradise FY 2023-24.pdf | 5 Mar 2026 |
| Layout approvalFile: Borivali Amended IOD Drawing 18 09 2023-1.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-2.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-3.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-4.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-5.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-6.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-7.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-8.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-9.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-10.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-11.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-12.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-13.pdf | 26 Feb 2026 |
| Building plan approvalFile: Borivali Amended IOD Drawing 18 09 2023-14.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 of Shraddha Paradise as on Dec 2025.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Shraddha Paradise as on Dec 2025.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Shraddha Paradise as on Dec 2025.pdf | 25 Feb 2026 |
| Building plan approvalFile: 8th page.pdf | 12 Jan 2026 |
| Building plan approvalFile: 9th Page.pdf | 12 Jan 2026 |
| Building plan approvalFile: 10th Page.pdf | 12 Jan 2026 |
| Building plan approvalFile: 11th Page.pdf | 12 Jan 2026 |
| Building plan approvalFile: 12th Page.pdf | 12 Jan 2026 |
| Building plan approvalFile: 13th Page.pdf | 12 Jan 2026 |
| Building plan approvalFile: 14th Page.pdf | 12 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Shraddha Paradise as on Sept 2025.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Shraddha Paradise as on Sept 2025.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 of Shraddha Paradise as on 30th September 2025.pdf | 12 Jan 2026 |
| Layout approvalFile: Layout.pdf | 10 Jan 2026 |
| Building plan approvalFile: Layout.pdf | 10 Jan 2026 |
| Building plan approvalFile: 3 Podiums.pdf | 10 Jan 2026 |
| Building plan approvalFile: 1st 2nd and 3rd Floor.pdf | 10 Jan 2026 |
| Building plan approvalFile: 4th (Refuge) and 5th Floor.pdf | 10 Jan 2026 |
| Building plan approvalFile: 6th 7th and 8th Floors.pdf | 10 Jan 2026 |
| Building plan approvalFile: 9th 10th 12th to 17th 19th to 24th 26th to 30th and 31st.pdf | 10 Jan 2026 |
| Building plan approvalFile: 11th 18th and 25th Refuge Floors.pdf | 10 Jan 2026 |
| Form 1File: Form 1 - Shraddha Paradise as on June 2025.pdf | 11 Sep 2025 |
| Form 2File: Form 2 - Shraddha Paradise as on June 2025.pdf | 11 Sep 2025 |
| Form 3File: Form 3 - Shraddha Paradise as on June 2025.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Paradise as on June 2025.pdf | 11 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Paradise as on March 2025.pdf | 10 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Paradise as on March 2025.pdf | 10 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Paradise as on March 2025.pdf | 10 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Shraddha Paradise as on 31st December 2024.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Paradise as on Dec 2024.pdf | 14 Feb 2025 |
| Proforma of Agreement for saleFile: DRAFT_AFS_PARADISE.pdf | 31 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: sh paradise_0001_5_11zon.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Paradise as on Sep 2024.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Paradise as on Sep 2024.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Paradise as on Sep 2024.pdf | 9 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shraddha Paradise FY 2023-24.pdf | 30 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Shraddha Paradise_RERA.pdf | 11 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Shraddha Paradise_RERA.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Paradise as on March 2024.pdf | 7 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Paradise as on June 2024.pdf | 7 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Shraddha Paradise.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of Shraddha Paradise as on June 2024.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Shraddha Paradise as on 30th June 2024.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Paradise as on March 2024.pdf | 31 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Paradise as on March 2024.pdf | 31 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (7).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (9).pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GAH.pdf | 20 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2399833_FirstCC_signed.pdf | 6 Mar 2024 |
| Proforma of Agreement for saleFile: PARADISE_AFS.pdf | 23 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Paradise as on Dec 2023.pdf | 1 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of Shraddha Paradise as on Dec 2023.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Shraddha Paradise as on 31st December 2023.pdf | 20 Jan 2024 |
| Layout approvalFile: 2389609Amendletter_signed.pdf | 15 Dec 2023 |
| Building plan approvalFile: DrawingF.pdf | 15 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 2389609Amendletter_signed.pdf | 15 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: DrawingF.pdf | 15 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Paradise as on Sep 2023.pdf | 7 Dec 2023 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Shraddha Park CityP51800055750 | Dahisar East, Borivali, Mumbai Suburban | 1,159 | Apr 2024 | Ongoing | Dec 2029 | Not due yet |
| Pratham - By ShraddhaP51800077622 | Borivali East, Mumbai Suburban | - | Oct 2024 | Ongoing | Dec 2029 | Not due yet |
| Shraddha Paradise EnclavePR1180002600018 | Veena Nagar Phase II, Mumbai Suburban | 207 | Apr 2026 | Ongoing | Mar 2029 | Not due yet |
| Shraddha PalaciousP51800052241 | Bhandup West, Mumbai Suburban | 398 | Aug 2023 | Ongoing | Dec 2027 | Not due yet |
| Shraddha PavillionP51800049739 | Kanjurmarg East, Mumbai, Mumbai Suburban | 166 | Feb 2023 | Ongoing | Jan 2027 | Not due yet |
| Shraddha PanoramaP51800053318 | Mulund, Mumbai Suburban | 282 | Oct 2023 | Ongoing | Dec 2026 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 103 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shraddha Paradise on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 437 registered projects within 2 km.
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
DAIVI ETERNEETY
YASH DEVELOPMENT
See every Mumbai Suburban project, with the district possession charts
Builder: Shraddha Prime Projects Limited
Shraddha Prime Projects Limited has 8 registrations on MahaRERA, including Shraddha Pavillion and Shraddha Paradise. Its filings disclose 7 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Shraddha Paradise is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shraddha Paradise?
The registered promoter entity is Shraddha Prime Projects Limited, a company as per the filing. Its CIN L70100MH1993PLC394793 and GSTIN 27AAACT6881D1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shraddha Paradise?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shraddha Paradise?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shraddha Paradise?
The professionals named in the filing: Architect: Sagar Makhela; Engineer: SK Consultants & Engineers; Engineer: RAJENDRA BANKAR; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shraddha Paradise?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback