Home / Browse projects / Mumbai Suburban, Maharashtra / SUPREMO PHASE I SALVIA D WING

Registered No litigation declared Residential / Group Housing project

SUPREMO PHASE I SALVIA D WING

By K V BUILDHOME LLP

RG-MH-97047 · RERA P51800050377 · Last updated on MahaRERA portal: 19 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 49%
66 of 316Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SUPREMO PHASE I SALVIA D WING is a Residential / Group Housing project by K V BUILDHOME LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050377 on 5 Apr 2023. Possession is promised by 31 Dec 2029. 250 of the 316 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUPREMO PHASE I SALVIA D WING
  • TypeResidential / Group Housing
  • Location
    • 90 FEET ROAD
    • NEAR KELKAR COLLEGE
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050377
  • ReraGenie IDRG-MH-97047

Builder

  • NameK V BUILDHOME LLP
  • Entity typeOthers
  • Named personsKARAN CHMAPALAL VARDHAN, KUNAL CHAMPALAL VARDHAN
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

79%250 of 316 units booked
78.7%Work done, per cost certificate

Figures as on 19 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUPREMO PHASE I SALVIA D WINGNA36283160316

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 49%.

SUPREMO PHASE I SALVIA D WING: 24% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure49%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Sanitary Fittings within the flats / premises3%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks3%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.4%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%

Progress on shared amenities15

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed332

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots332
Closed/Covered332

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,922 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Nov 2025
LandownerVillageDistrict
K V BUILDHOME LLPMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI16757.23
Proposed, not sanctioned15,906 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI SAMACHAR MARG FORT MUMBAI 400001
Estimated costRs 156.45 cr
Cost incurredRs 123.12 cr
Work done78.7%
BuildingWingEstimatedIncurred
SUPREMO PHASE I SALVIA D WINGNARs 156.45 crRs 123.12 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSKYLINE ARCHITECTS
ArchitectVINOD GAIKWAD
EngineerGHANSHYAM SUTAR
Chartered AccountantA D SHETH AND ASSOCIATES
PartnerRole in project
K V BUILDHOME LLP-

Litigation declared1

CaseCourtStatus
3119/2008SUPREME COURTDISMISSED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE D WING.pdf19 May 2026
Withdrawal Update Form 2File: Engineers Cert D.pdf19 May 2026
Withdrawal Update Form 3File: CA CERTIFICATE - D WING_11zon.pdf19 May 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE D WING SALVIA.pdf6 Mar 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE D WING SALVIA.pdf6 Mar 2026
Withdrawal Update Form 3File: C A CERTIFICATE D WING SALVIA (1)_11zon.pdf6 Mar 2026
Withdrawal Update Form 1File: ARCHITEC CERTIFICATE D WING SALVIA.pdf26 Dec 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE D WING SALVIA.pdf26 Dec 2025
Withdrawal Update Form 3File: Revised Salvia_08122520130101.pdf26 Dec 2025
Withdrawal Update Form 1File: Architect Certificate D wing Salvia.pdf19 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate - D wing Salvia.pdf19 Dec 2025
Withdrawal Update Form 3File: Revised Form III_KV_121225.pdf19 Dec 2025
Withdrawal Update Form 1File: Architect Certificate D wing Salvia.pdf2 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate - D wing Salvia- sign.pdf2 Dec 2025
Withdrawal Update Form 3File: CA Certificate phase I Salvia _compressed - Sign.pdf2 Dec 2025
Architect certificate D Wing Salvia29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - D Wing Salvia_Final.pdf29 Apr 2025
ENGINEERS CERTIFICATE - D Wing Salvia Final29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20241116000904.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - D Wing_compressed.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II - D Wing.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate - D Wing.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - D Wing.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Supervisor Certificate - D Wing_compressed.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - (30 Sep 23)- K V Buildhome Pvt Ltd_compressed.pdf13 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 2364889_FirstCC_signed.pdf24 Mar 2023
Declaration about Commencement CertificateFile: PDF Format D SALVIA NEAR KELKAR COLLEGE.pdf24 Mar 2023
Details of encumbrances concerned to FinanceFile: KV BUILDHOME NO ENCUMBRANCES.pdf23 Mar 2023
Details of encumbrances concerned to LegalFile: KV BUILDHOME NO ENCUMBRANCES.pdf23 Mar 2023
CERSAI detailsFile: NEW CERSAI DECLARATION - KELAKAR COLLEGE.pdf23 Mar 2023
Other - LegalFile: agreement.pdf16 Feb 2023
Proforma of Allotment letterFile: allotment letter kv buildhome.pdf10 Feb 2023
Deviation Report with respect to Allotment letterFile: deviation.pdf10 Feb 2023
Proforma of Agreement for saleFile: agreement kvbuildhome.pdf9 Feb 2023
Deviation Report with respect to model copy of AgreementFile: deviation kvbuildhome.pdf9 Feb 2023
Building plan approvalFile: IOD Conditions 07 02 23.pdf8 Feb 2023
Layout approvalFile: plans 1.pdf8 Feb 2023
Layout approvalFile: plans 2.pdf8 Feb 2023
Layout approvalFile: plans 3.pdf8 Feb 2023
Layout approvalFile: plans 4.pdf8 Feb 2023
Layout approvalFile: plans 5.pdf8 Feb 2023
Layout approvalFile: plans 6.pdf8 Feb 2023
Layout approvalFile: plans 7.pdf8 Feb 2023
Layout approvalFile: plans 8.pdf8 Feb 2023
Layout approvalFile: plans 9.pdf8 Feb 2023
Layout approvalFile: plans 10.pdf8 Feb 2023
Layout approvalFile: plans 11.pdf8 Feb 2023
Layout approvalFile: plans 12.pdf8 Feb 2023
Layout approvalFile: plans 13.pdf8 Feb 2023
Layout approvalFile: plans 14.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 1.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 2.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 3.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 4.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 5.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 6.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 7.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 8.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 9.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 10.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 11.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 12.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 13.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: plans 14.pdf8 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD Conditions 07 02 23.pdf8 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure.pdf8 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure kv buil.pdf8 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION BANK ACCOUNT - K V BUILDHOME LLP.pdf8 Feb 2023
PAN CardFile: PAN_KVBUILDHOMELLP.pdf19 Jan 2023
Copy of the legal title reportFile: Title_Report.pdf19 Jan 2023
Details of encumbrances concerned to FinanceFile: No Encumrance LEGAL - KVBUILDHOME.pdf19 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumrance LEGAL - KVBUILDHOME.pdf19 Jan 2023
Declaration in FORM BFile: Form_B_KVBUILDHOME.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_III_KVBUILDHOME_compressed.pdf19 Jan 2023
Other - TechnicalFile: FUTURE_DEVELOPMENT_DECLARATION.pdf19 Jan 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SENROOFS PHASE IISENROOFS MILE OFF GOREGAN-MULUND LINK ROAD NAHUR EAST 400081512CompletedDec 2018Dec 2018

How this compares with Mumbai Suburban

79%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUPREMO PHASE I SALVIA D WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR KELKAR COLLEGE6,700+ in Mumbai Suburban

2 kmSUPREMO PHASE I SALVIA DCompleted 105Lapsed / revoked 92Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 330 registered projects within 2 km.

Builder: K V BUILDHOME LLP

K V BUILDHOME LLP has 2 registrations on MahaRERA, including SUPREMO PHASE I SALVIA D WING and SUPREMO PHASE II, WING C known as SAKURA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SUPREMO PHASE I SALVIA D WING is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUPREMO PHASE I SALVIA D WING?

The registered promoter entity is K V BUILDHOME LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUPREMO PHASE I SALVIA D WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUPREMO PHASE I SALVIA D WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUPREMO PHASE I SALVIA D WING?

The professionals named in the filing: Architect: SKYLINE ARCHITECTS; Architect: VINOD GAIKWAD; Engineer: GHANSHYAM SUTAR; Chartered Accountant: A D SHETH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUPREMO PHASE I SALVIA D WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUPREMO PHASE I SALVIA D WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUPREMO PHASE I SALVIA D WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.